RFQ for Development of the Hotline System and Case Management System

IOM
RFQ for Development of the Hotline System and Case Management System Request for quotation

Reference: 30000036614
Beneficiary countries or territories: Egypt
Registration level: Basic
Published on: 18-Nov-2026
Deadline on: 01-Dec-2026 00:00 (GMT 2.00)
Description

Terms of Reference

Development of the Hotline System and Case Management System for the Fund for Assisting Victims of Trafficking in Persons (FAVOT)

A. Project Background

Project Title

Development of the Hotline System and Case Management System for the Fund for Assisting Victims of Trafficking in Persons

Overall Objective

Design, develop, test and deploy an integrated Hotline System and Case Management System that enables the Fund for Assisting Victims of Trafficking in Persons to register, manage and follow up victim cases from initial contact through referral and resolution.

Beneficiary

The Fund for Assisting Victims of Trafficking in Persons (FAVOT), a national entity affiliated with the Cabinet of Ministers of Egypt (Presidential Decree No. 349 of 2024)

Supervising Entity

The International Organization for Migration (IOM) in Egypt, through its Protection Team and the technical guidance of the Business System Analyst engaged by IOM.

Donor

Ministry of Foreign Affairs of Denmark

 

Duration

Six (6) months from contract signature, plus a three-month warranty and completion period thereafter (see Section F, Duration of Assignment).

 

Egypt's evolving role from a country of origin to one of transit and destination for trafficking in persons, compounded by economic pressure and regional instability, has increased the population at risk of exploitation. In 2024, the Government of Egypt established the Fund for Assisting Victims of Trafficking in Persons, under Presidential Decree No. 349 of 2024, affiliated Cabinet of Ministers. The FAVOT's mandate includes providing financial assistance to victims,  develop care, education and rehabilitation programmes with governmental and non-governmental partners, and financing psychological, health and social support services for victims of trafficking under Law No. 64 of 2010.

To operationalize this mandate, the FAVOT requires a dedicated digital infrastructure comprising a Hotline System for structured intake, triage and logging of victim calls, and a Case Management System for end-to-end case registration, assignment, status tracking and referral coordination. The International Organization for Migration, through its Business System Analyst, will lead a structured business analysis process including stakeholder mapping, process mapping, use case definition and requirements documentation and will finalize the Business Requirements Document and the Functional Specification Document that define the operational and technical scope of both systems. These documents form the basis for the Scope of Work defined in Section C of these Terms of Reference.

The Software Development Company (the firm) engaged under this Terms of Reference is requested to design, develop, test and deploy the Hotline System and Case Management System in accordance with the approved requirements, under the supervision of the International Organization for Migration and the technical guidance of the Business System Analyst in close coordination with FAVOT.

B. Objective of the Assignment

The objective of this assignment is to deliver two interlinked production-ready systems for the Fund for Assisting Victims of Trafficking in Persons:

  • A. Hotline System — structured call intake, triage, and logging, integrated with the FAVOT 's telephone system.
  • B. Case Management System — victim and beneficiary registration, case assignment, status and lifecycle management, referral and forwarding, duplicate-record detection, scheduling and reminders, and basic reporting. The Case Management System should be fully linked and integrated with the Hotline System.

The detailed functional and technical requirements for both systems will be defined by the International Organization for Migration in the approved Business Requirements Document and Functional Specification Document, which will be provided to the selected firm at the start of the assignment. The firm is not required to gather requirements; its role is to design the technical architecture and to build, test and deploy the two systems in accordance with these approved requirements.

Hosting shall be within Egypt, specifically on an on-premises server at FAVOT. Use of public commercial cloud services is not permitted.

C. Scope of Work

Under the supervision of the International Organization for Migration and the technical guidance of the Business System Analyst, and in coordination with focal points from the FAVOT, the selected firm shall carry out the following:

C.1 — Functional Scope

Building on the approved Business Requirements Document and Functional Specification Document, the Hotline System and Case Management System shall provide the following core capabilities:

  • Generation of a unique, non-repeating identifier for each victim or beneficiary at first registration, used as the reference key across all records.
  • Role-based access control and data encryption, ensuring that each user role can access only the data and functions relevant to their responsibilities, and that all data is protected at rest and in transit.
  • An activity and change log recording user actions, record creation, modification and access, to support accountability and compliance.
  • Assignment of cases to case workers, both automatically at the point of intake and manually by supervisors.
  • A calendar with notifications and reminders for follow-up appointments, deadlines and scheduled tasks.
  • Detection of potential duplicate beneficiary and service records, with a review and merge process for authorized users.
  • Automatic expiry of user sessions after a period of inactivity.
  • Structured referral and case-forwarding functionality, including direct, access-controlled visibility for government partner institutions.
  • Data extraction and a documented interface for future exchange of information with other systems.
  • Full Arabic and English language support across the interface, forms and generated outputs.
  • A defined, configurable case status and lifecycle workflow, with enforced transition rules.
  • Logging of hotline calls, integrated with the FAVOT 's telephone system, linked to case records.
  • Basic reporting and dashboards showing key operational statistics.
  • Restriction of system access to the FAVOT 's approved network by default: system access is restricted to the Fund's approved network by default; role-based access control is enforced with full encryption of data at rest and in transit to ensure least-privilege access; and users marked as out of office are automatically limited to creating new entries and viewing a limited, non-sensitive subset of information on existing entries, with full access resuming once the user is marked active.

C.2 — Out of Scope

The following are outside the scope of this assignment:

  • Procurement, purchase or installation of computer hardware, servers, network equipment, or telephone system equipment. FAVOT and the International Organization for Migration will provide the hosting environment and any required physical equipment.
  • Gathering business or system requirements, which has already been completed by the International Organization for Migration?
  • Administration or modification of the internal systems of other institutions.
  • Development of functionality beyond what is defined in the Functional Scope in Section C.1. Any additional functionality identified during the assignment will be considered under a separate, future assignment.
  • Maintenance and support beyond the warranty period defined in Section C.4, Phase 5.

C.3 — Deliverables and Milestones Summary

Phase

Deliverables

Milestone

Phase 1 – Mobilization and Technical Design

Project and environment-set-up plan; system architecture and technical design document aligned with the approved Business Requirements Document and Functional Specification Document; hosting and security design; quality-assurance and testing plan.

Milestone 1

Phase 2 – System Development

Development increments for the Hotline System and Case Management System; source code; updated technical documentation; test results.

Milestone 2

Phase 3 – Testing and User Acceptance

System testing report; security review report with remediation evidence; User Acceptance Testing report with sign-off.

Milestone 3

Phase 4 – Training, Documentation and Handover

Training sessions; bilingual (Arabic and English) user and administrator guides; full source code and documentation handover.

Milestone 4

Phase 5 – Production Launch and Warranty

Production deployment; three-month warranty and stabilization period.

Milestone 5

 

Indicative milestones, within the six-month assignment duration (to be finalized against the firm's proposed schedule):

  • Milestone 1 (Week 2): mobilization and technical design approved.
  • Milestone 2 (Weeks 3–19): development increments delivered; mid-assignment review.
  • Milestone 3 (Weeks 20–23): system testing and user acceptance testing completed.
  • Milestone 4 (Weeks 24–25): training and handover completed.
  • Milestone 5 (Week 26): production launch; warranty period begins.

C.4 — Detailed Phases

Phase 1 — Mobilization and Technical Design

Goal: confirm the technical approach for implementing the approved requirements and prepare the development environment.

  • Review of the approved Business Requirements Document, Functional Specification Document and supporting requirements documentation provided by the International Organization for Migration.
  • Preparation of a system architecture and technical design document, including the data model, user roles and permissions, and system interfaces, consistent with the approved requirements.
  • Design of the hosting and network environment on FAVOT’s on-premises server within Egypt, including restriction of access to the FAVOT 's approved network.
  • Preparation of a quality-assurance and testing plan, and a development and release process.
  • Design of the security approach, including encryption of data at rest and in transit, activity logging, and automatic session expiry.

Deliverables: project and environment-setup plan; system architecture and technical design document; hosting and security design; quality-assurance and testing plan.

Phase 2 — System Development

Goal: build the Hotline System and Case Management System in accordance with the approved requirements and the technical design confirmed in Phase 1.

Technical expectations (indicative — the firm may propose an alternative approach meeting the same security and performance standards):

  • A back-end application, in a technology of the firm's choice, exposing a documented interface for data exchange.
  • A database, with all changes to its structure recorded and version controlled.
  • A responsive, web-based interface with full Arabic and English localization, including right-to-left text display for Arabic.
  • Integration with the FAVOT 's telephone system for call logging.
  • A deployment approach appropriate to the hosting environment, with encrypted data transmission throughout.

Development shall proceed in short iterations (one to two weeks), with a working increment demonstrated to the International Organization for Migration and the FAVOT at the end of each iteration.

Deliverables: working increment deployed to the test environment at the end of each iteration; updated technical documentation; test results; iteration demonstration.

Phase 3 — Testing and User Acceptance

  • System testing: end-to-end test scenarios covering the full functional scope defined in Section C.1.
  • Security testing: a vulnerability assessment of the deployed application, with any critical or high-severity findings resolved prior to acceptance.
  • Support for User Acceptance Testing by FAVOT 's hotline operators and case workers, including test scenarios, test data, and resolution of issues identified.
  • Preparation for production launch, including a launch plan and a rollback plan.

Deliverables: system testing report; security review report with remediation evidence; User Acceptance Testing report with sign-off; production launch plan.

Phase 4 — Training, Documentation and Handover

  • Training sessions for the FAVOT 's hotline operators, caseworkers, and system administrators, including a training-of-trainers approach.
  • Bilingual (Arabic and English) user and administrator guides.
  • Handover of the complete source code, technical documentation, data model diagrams, interface documentation, and administrative access credentials to the International Organization for Migration and the FAVOT.

Deliverables: training completion report; user and administrator guides; full source code and documentation handover.

Phase 5 — Production Launch and Warranty

  • Deployment of the system into production use.
  • A three-month warranty and completion period from the date of production launch, during which the firm shall: (a) correct any defects identified, (b) complete development of any approved functionality not fully delivered by the end of Phase 2, and (c) resolve technical issues identified during operation — all at no additional cost, in accordance with an agreed response-time schedule.

Deliverables: production deployment confirmation; warranty terms and support arrangement.

C.5 — Deliverables Breakdown

#

Deliverable (acceptance evidence)

Weight

A

Phase 1 – Mobilization and Technical Design

15%

A1

Project and environment-set-up plan completed

3%

A2

System architecture and technical design document completed, aligned with the approved Business Requirements Document and Functional Specification Document

6%

A3

Hosting and security design completed, including network access restriction and encryption approach

6%

B

Phase 2 – System Development (increments deployed to the test environment)

45%

B1

Case Management System core functionality built — case registration, assignment, status and lifecycle management, referral and forwarding, duplicate-record detection, calendar and reminders

20%

B2

Hotline System built — call logging integrated with the FAVOT 's telephone system

10%

B3

Security and access-control functionality built — role-based access control, encryption, activity logging, session expiry, network access restriction, Arabic and English interface

10%

B4

Reporting, dashboards, and data-extraction interfaces built

5%

C

Phase 3 – Testing and User Acceptance

20%

C1

System testing report completed — full functional scope tested end-to-end

8%

C2

Security review completed, with remediation evidence for any critical or high-severity findings

6%

C3

User Acceptance Testing completed and signed off by the FAVOT and the International Organization for Migration

6%

D

Phase 4 – Training, Documentation and Handover

10%

D1

Training delivered; user and administrator guides provided in Arabic and English

5%

D2

Full source code, technical documentation and access credentials handed over

5%

E

Phase 5 – Production Launch and Warranty

10%

E1

System launched into production use

5%

E2

Warranty period activated with agreed support terms

5%

 

C.6 — System and Quality Requirements

  • Hosting: hosting within FAVOT office in Egypt; at minimum, separate development, testing and production environments; access restricted to the FAVOT 's approved network by default.
  • Security and data protection: encryption of data at rest and in transit — including Transport Layer Security (TLS) encryption, version 1.2 or higher, and the Advanced Encryption Standard (AES) with a minimum 256-bit key length; role-based access control; activity logging; automatic session expiry; compliance with the data protection standards of the International Organization for Migration and applicable Egyptian regulations.
  • Performance and availability: targets to be confirmed with the firm and right-sized to the scale of the two systems — indicatively, availability of at least 99 percent during business hours, and page-load times of no more than three seconds.
  • Accessibility and language: full Arabic and English localization across the interface, forms and outputs, including right-to-left text display for Arabic.
  • Interoperability: a documented interface for data extraction and future exchange of information with other systems, without requiring manual re-entry of data.
  • Data quality: detection of duplicate beneficiary and service records at the point of data entry, with a review and merge process for authorized users.
  • Code quality: version-controlled source code, mandatory code review prior to release, and a reproducible build process.
  • Documentation: a developer guide, a deployment guide, an administrator guide, interface documentation, and data model diagrams.
  • Intellectual property and licensing: all intellectual property developed under this contract — including source code, documentation, database structures, interfaces, and configurations — shall be fully and exclusively assigned to the FAVOT and the International Organization for Migration upon acceptance of FAVOT The firm shall retain no ownership or reuse rights. Any third-party software components used must be explicitly listed with their licenses and must not create future financial, legal or operational dependencies for the FAVOT.

C.7 — Roles and Responsibilities

  • Firm: design, build and deliver the two systems in accordance with the approved requirements; meet the security and quality requirements defined in this Terms of Reference; provide evidence of completion for each deliverable.
  • International Organization for Migration and Business System Analyst: provide the approved requirements documentation; review and approve deliverables; lead User Acceptance Testing; approve each milestone.
  • The FAVOT: provides focal points, test data and scenarios, access to its telephone system for integration, and supports the operational adoption of the two systems.

D. Institutional Arrangement

Under the supervision of the International Organization for Migration's Protection Team in Egypt and the technical guidance of the Business System Analyst, the selected firm shall be responsible for the development, testing, and initial deployment of the Hotline System and Case Management System for the FAVOT, in coordination with the FAVOT 's designated focal points.

 

 

 

 

E. Payment Terms

Payments shall be made as a percentage of the total contract value, upon the review and written approval of the corresponding deliverables by the International Organization for Migration. The firm shall propose the corresponding financial amounts for each instalment as part of its financial proposal.

Instalment

Terms

Share of Contract Value

1st

Upon approval of the Phase 1 deliverables — project and environment-setup plan; system architecture and technical design document; hosting and security design; quality-assurance and testing plan.

15%

2nd

Upon approval of the Phase 2 deliverables — Hotline System and Case Management System increments deployed to the test environment, covering the complete functional scope.

45%

3rd (Final)

Upon approval of the Phase 3 deliverables — system testing report, security review with remediation evidence, and User Acceptance Testing sign-off.

 

Upon approval of the Phase 4 deliverables — training completed, and full documentation and source code handover.

 

Upon approval of Phase 5 deliverables — production launch confirmed and warranty period activated.

40%

 

F. Duration of Assignment

The assignment shall be completed within six (6) months from contract signature, covering mobilization and technical design, system development, testing and user acceptance, and training and handover. The three-month warranty and completion period defined in Phase 5 begins at the date of production launch and runs beyond this six-month window, at no additional cost. The total engagement, from contract signature through the end of the warranty period, is therefore approximately nine (9) months. The final schedule shall be confirmed based on the firm's technical proposal and agreed at Milestone 1.

G. Performance Indicators for the Evaluation of Results

  • Timely delivery of deliverables in accordance with the agreed schedule.
  • Completeness and quality of deliverables against the approved requirements and technical design.
  • Responsiveness to review comments and timely resolution of defects identified during testing and the warranty period.
  • Compliance with the data protection, security and hosting requirements defined in these Terms of Reference.
  • Quality of documentation, training materials and knowledge transfer provided to FAVOT 's staff.
  • Professionalism and quality of communication and reporting throughout the assignment.

H& I. Proposal Submission Requirements & Evaluation Criteria

Proposal Submission Requirements

  • Company profile and relevant references for web-based case management or hotline system development.
  • Technical approach by phase, and the proposed project team, including the composition and relevant experience of key personnel (project lead, developers, and quality assurance).
  • Delivery plan (development schedule, risk management, and quality-assurance and security approach).
  • Hosting and security approach for deployment on FAVOT’s on-premises server within Egypt.
  • Compliance matrix against the system and quality requirements in Section C.6.
  • Samples of similar previous work (presentation slides, case studies, or accessible demonstration links where confidentiality permits), illustrating system architecture, dashboards, and integrations.
  • Financial proposal and payment schedule, tied to the instalment structure in Section E.

Evaluation Criteria

Evaluation Criteria

Score Weight

Company profile and relevant references for web-based case management or hotline system development

10%

Technical approach by phase, and the proposed project team

15%

Samples of previous similar work (case management, or hotline systems)

20%

Delivery plan (development schedule, risk management, and quality-assurance and security approach)

10%

Hosting and security approach

10%

Compliance matrix against the system and quality requirements (Section C.6)

10%

Financial proposal and payment schedule

25%

 

Annex A — Systems Feature List

The following 14 features constitute the full and exclusive scope of this contract.

#

Feature

Category

System

1

Unique Victim/Beneficiary Code Generation

Identity & Data Integrity

Both

2

Role-Based Access Control (RBAC) & Data Encryption

Security & Compliance

Both

3

Audit Trail, Event Logging & Change Logging (basic)

Security & Compliance

Both

4

Case Assignment — Automatic & Manual

Case & Workflow Management

CMS

5

Calendar, Notifications & Reminders

Scheduling & Communication

CMS

6

Deduplication — Beneficiaries & Services

Identity & Data Integrity

Both

7

Session Expiry (timeout)

Security & Compliance

Both

8

Referral & Case Forwarding (core: internal handover + direct RBAC access for government partners)

Case & Workflow Management

Both

9

Data Extraction & API Integration

Integration & Interoperability

Both

10

Multi-Language Support (Arabic/English)

Usability & Accessibility

Both

11

Case Status & Lifecycle Management

Configurability & System Governance

Both

12

Hotline Call Log & CTI Integration

Configurability & System Governance

HS

13

Reporting & Dashboard Module (basic)

Reporting

Both

14

Network-Restricted Access (IP whitelisting)

Security & Compliance

Both

 

Annex B — Frequently Asked Questions (FAQ)

#

Item

Response / Action

1

Total number of hotline agents (call takers).

10 Agents

2

Number of supervisors monitoring the hotline.

3 supervisors

3

Maximum number of concurrent calls expected at peak time (calls in progress and waiting in queue).

100 Concurrent calls

4

Expected number of calls per day, and average call duration.

80 Calls per day / 5 mins each

5

Hotline working days and hours.

7 days / 9:00AM to 7:00 PM___

 

6

Number of shifts per day and agents per shift.

__1___ shifts ___10__ agents/shift

7

Are outbound calls required (call-backs and follow-up with victims)?

Yes

8

Do any agents work remotely or from another FAVOT location?

 “Restriction of system access to the FAVOT 's approved network by default: system access is restricted to the Fund's approved network by default; role-based access control is enforced with full encryption of data at rest and in transit to ensure least-privilege access; and users marked as out of office are automatically limited to creating new entries and viewing a limited, non-sensitive subset of information on existing entries, with full access resuming once the user is marked active.”

9

Languages for the voice menu (IVR) and recorded announcements.

It is required in both languages

 

3. Hotline Number and Telephony

The Terms of Reference require call logging integrated with FAVOT's telephone system.

#

Question

Response / Action

1

Does FAVOT have an existing telephone system (PBX / IP-PBX)? Please state make and model.

Grandstream UCM as the telephony platform tied to the hotline.

2

Does the telephone system provide an interface for call-logging integration (CTI / API)? Please state the system vendor or maintainer.

Yes

3

Hotline number type.

Short code 5 digits

4

Has the hotline number been approved by NTRA and assigned by the operator?

Yes

5

Is a SIP trunk from Telecom Egypt already installed or ordered?

Installed

6

Number of SIP trunk channels (simultaneous calls) contracted or planned.

50 channels

7

Number of DID (direct) numbers required in addition to the hotline number.

3 Numbers

8

Which party will contract and pay for the SIP trunk and call charges?

 BY FAVOT

9

Is call recording required? If yes, the retention period.

Yes, 6 months

10

Agent devices.

IP DESK, Softphones on PC, headsets is requiered.

 

4. Local Network Readiness

#

Question

Response / Action

1

Internet link type and bandwidth at FAVOT.

200 Mbps, fiber

2

Definition of FAVOT's approved network for system access (office LAN only, or also branches / VPN users).

The system allows the user to access the case’s data entry outside the office

3

Will secure remote access (VPN) be provided to the development team during the project?

Yes

4

Are the network equipment and agent positions protected by UPS?

Yes

 

5. Local Hosting Hardware Readiness

#Question

Response / Action

1 Is a server already available for the systems? Please provide make, model, CPU, RAM and storage.

Dell PowerEdge R760xs, 3.5" Chassis with up to 12 Hard Drives (SAS/SATA) PERC11, 2xintel Xeon Silver 4514Y 2G, 16C/32T, 16GT/s, 30M Cache, Turbo, HT (150W), 4x32GB RDIMM 5600MT s, Dual Rank,, 3x1.92TB SSD SATA, PERC H755 Low Profile, Dual, Hot-Plug, Power Supply, 1100W MM (100-220Vac) Titanium, Redundant (1+1), iDRAC9, Enterprise 16G, Front PERC Mechanical Parts, front load, Motherboard with Broadcom 5720 Dual Port 1Gb On-Board LOM, Broadcom 57416 Dual Port 10GbE BASE-T Adapter, OCP NIC 3.0, High Performance Fan X5, Ready Rails Sliding Rails With Cable Management Arm, No Systems Documentation, No Open Manage DVD Kit, Riser Config 1, Half Length, Low Profile, 3x16 + 1x8 + 2x16 (Gen5), Trusted Platform Module 2.0 V3, Power Saving BIOS Settings, Unconfigured RAID, (PowerEdge 2U LCD Bezel), Quick Sync 2, 3Yr warranty ProSupport and Next Business Day Onsite Service.

 Windows Server Standard 2022 Full Package with CD 32 core (from Local Market)

2 Virtualization platform.

Proxmox

3 Can the three environments (development, testing, production) run as virtual machines on the same host?

 In consultation with the vendor during Phase 1 technical design.

4 Operating system and database licenses available.

Operating system is Ubuntu, and database is PostgreSQL database.

The whole solution should use open source tools and framework.

5 Backup solution and backup storage available.

Yes

6 Is a disaster-recovery or secondary site required?

Yes

7 Is integration with an existing directory (Active Directory) required for user sign-in?

Multi factor authentication

8 Is an e-mail server (SMTP) available for system notifications and reminders?

Yes

9 Is an SMS gateway required for reminders to case workers or beneficiaries?

Not required in this phase

 

6. Server Room Readiness

The servers and telephony equipment need a suitable room at FAVOT to meet the availability target in the Terms of Reference.

#Question

Response / Action

1 Is a dedicated server room or IT cabinet available at FAVOT for the hotline and hosting equipment?

Server room

2 Rack space available for the servers, network and telephony equipment.

Yes

3 Is there a dedicated power circuit with proper earthing for the IT equipment?

yes

4 UPS protecting the server room: capacity and backup time.

10kva / 10 mins

5 Is the building supported by a standby generator?

yes

6 Cooling: dedicated air conditioning for the room, and its operating hours.

24/7

7 Physical security of the server room.

Access control

8 Fire protection in the server room.

Smoke detection

9 Is temperature and humidity monitoring installed, with alerts?

No

10 Is the network backbone from the server room to the hotline area ready?

Fiber

 

7. Case Management Users and Data

# Question

Response / Action

1 Number of Case Management System users by role (case workers, supervisors, administrators).

10 / 3 / 2

2 Number of government partner institutions that will receive direct access for referrals.

__6___ institutions

3 Will partner institutions access the system from outside FAVOT's network?

 

NO

4 Expected number of new cases per month.

40 Cases per month

 

8. Project and Commercial Clarifications

#Question

Response / Action

1 Is a site visit to FAVOT possible before submission?

Yes

2 Proposal currency and VAT treatment.

EGP

3 Proposal submission deadline and submission method.

Two weeks after publishing