Supply, Delivery and Commissioning of 400 KVA generator for Al-Qusayr pumping station and 100 KVA generator for industrial borehoel in Syria
UNOPS
Supply, Delivery and Commissioning of 400 KVA generator for Al-Qusayr pumping station and 100 KVA generator for industrial borehoel in Syria
Request for quotation
Reference:
RFQ/2026/65223
Beneficiary countries or territories:
Syrian Arab Republic
Registration level:
Basic
Published on:
02-Nov-2026
Deadline on:
19-Nov-2026 09:00 (GMT 0.00)
Expired
Description
Tender description: [Supply, Delivery and Commissioning of 400 KVA generator for Al-Qusayr pumping station and 100 KVA generator for industrial borehoel in Syria.]
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
New amendment added #3: Amendment No. 3 has been issued to provide the revised Technical Specifications and BOQ for both the 100 kVA and 400 kVA units, reflecting an update in the ingress protection rating from IP44 to IP23 (written in red)
Edited on:
16-Nov-2026 09:04
Edited by:
webservice@unops.org
New clarification added: Dear bidders,Kindly find the clarifications below and UNOPS responses:Q18: Are both gensets for Homs water establishment- Al Quasyr water unit i.e same address but in two different locations within the premises.UNOPS response: Both generators will be offloaded at the same site, the water unit in the city of Al-Qusayr.Q19: Where to upload Section_II_ScheduleofRequirementsUNOPS response: Section II (Schedule of Requirements) is provided for informational and technical specification purposes and does not need to be uploaded as a standalone document. Please note that all documents requested under the Checklist tab must be submitted.Q20: Please elaborate more on the form Delivery plan stating the lead time in calendar weeks per itemUNOPS response: Bidders are required to submit a delivery plan specifying the lead time in calendar weeks, noting that the delivery period is 60 days.Q21: Company "X" is a Syria based company and does not have a local representative. What do we need to upload under mandatory documents : Agreement between the bidder and its local representative, where applicableUNOPS response: You may upload a signed letter on company letterhead confirming that the company is legally registered in Syria and that this requirement is not applicableQ22: Company "X" is a Syria based company and does not have a local distributor. What do we need to upload under mandatory documents : Where the bidder supplies through a local distributor, the authorization form issued by the local distributor to the bidder, together with the manufacturer authorization issued to that distributorUNOPS response: You may upload the direct Manufacturer's Authorization Form along with a brief declaration stating that you supply directly without an intermediary local distributor.Best regards
Edited on:
15-Nov-2026 11:34
Edited by:
webservice@unops.org
New clarification added: Dear bidders,Kindly find the clarifications below and UNOPS responses:Q14. Document name : Where the bidder supplies through a local distributor, the authorization form issued by the local distributor to the bidder, together with the manufacturer authorization issued to that distributor. This is a mandatory document but does not apply to us. We do not supply through a local distributor. As a matter of fact we are an authorized distributor for regional and global gensets. Please advise since it’s a mandatory document. Same applies to your clarification published to our previous question stating such a requirement applies exclusively to bidders not registered in Syria and we are not. Bottom Line if any of the mandatory documents does not apply to us as you clarified, shall we just pass it ? are we still able to submit our quote? UNOPS response: In accordance with the criteria for Legal status and registration: "Bidder shall possess a valid business registration or commercial license in Syria, or in its country of establishment, valid at the date of quotation submission. A bidder not registered in Syria shall provide evidence of an authorized local agent or representative in Syria."Q15: For all Forms A to G as mandatory documents. All those forms are in Section III: Returnable Bidding Forms. Do we cut each requested form and paste in a separate sheet and then upload or we upload the whole Section III: Returnable Bidding Forms each time. UNOPS response: The returnable file is available in Word format, you may fill out each form and submit it separately under the placeholder for each Form.Q16: Please clarify more Delivery plan stating the lead time in calendar weeks per item. What is needed exactly UNOPS response: Bidders are required to submit a delivery plan specifying the lead time in calendar weeks, noting that the delivery period is 60 days. Q17: While the original technical specifications specify IP44 as the minimum protection rating, your response to Q10 recommends IP23.To avoid any ambiguity during technical evaluation, could you please explicitly confirm whether IP23-rated acoustic canopies will be considered fully technically compliant and acceptable for both the 100 kVA and 400 kVA generator sets, without requiring IP44?UNOPS response: The correct IP is IP23 and please find attached the amended document under documents tab - Amendment No.3Best regards
Edited on:
15-Nov-2026 10:06
Edited by:
webservice@unops.org
New clarification added: Dear bidders,Kindly find the clarifications below and UNOPS responses:Q12: ATS and Master Paralleling SystemThe published response to Q8 indicates that separate external ATS and Master Paralleling System cabinets are excluded from this RFQ. However, subsequent statements in the same response appear inconsistent.Please confirm whether the supplier is required to provide only the generator-mounted control panels with the necessary interfaces for external ATS integration, without supplying separate ATS or Master Paralleling System cabinets.UNOPS response: A separate external ATS and Master Paralleling System cabinet is **not** included in the scope of supply of this RFQ (it will be implemented under the installation package). However, the generator control panels provided under this tender must feature the necessary interfaces and control capabilities (including dry contacts/signals) to integrate with an external ATS and paralleling system.Q13: Additional 1,000 A Circuit Breaker – 400 kVA GeneratorThe BOQ specifies a 3×630AF MCCB under Item 1.1 and a separate four-pole circuit breaker rated at not less than 1,000 A under Item 4.1.We understand that both items are required.Please confirm whether the supplier's responsibility for the additional 1,000 A circuit breaker is limited to supply and delivery, with its physical installation and electrical connections to be performed by the separate installation contractor, as indicated in the response to Q7.UNOPS response: The generator supplier’s responsibility is limited to supply, delivery to site, offloading, and conducting testing and commissioning. Physical installation will be carried out by the separate installation contractor.Best regards,
Edited on:
12-Nov-2026 19:35
Edited by:
webservice@unops.org
New amendment added #2: Amendment No. 2 is hereby issued to extend the submission deadline from November 15 to November 19, 2026, and the clarification deadline to November 15, 2026
Edited on:
12-Nov-2026 09:56
Edited by:
webservice@unops.org
New clarification added: Dear bidders,Kindly find the clarifications below and the UNOPS responses:Q10: IP rating of the generator canopy: Is the IP rating of the generator canopy/44/ mandatory? If so, what is the minimum required IP rating.UNOPS response: The enclosure (canopy) to be supplied with the generator sets is designed for sound attenuation and weather resistance; it must ensure adequate ventilation, the exhaust of gases, and protection against rain and the ingress of dust. Accordingly, an IP23 protection rating—as per the international standard IEC 60529—is the recommended specification.The rating "IP23" indicates that the generator set is protected against the entry of solid objects larger than 1 mm in diameter (such as wires, large insects, and coarse dust)and provides complete protection against water splashes from any direction.Q11: Control panel and synchronization between the two generators: Is it required that the generators' control panel be dedicated to synchronization between the two generators, noting that the two generators have different capacitiesUNOPS response: Since each unit will be installed at a separate, remote location—meaning they will be situated in two geographically distant sites—there is no need for the control panel on either generator to be of a type designed for synchronization; each generator will operate independently at its own respective location. Please clarify whether actual parallel operation (synchronization / load sharing) between the two generators is required, or whether independent control panels for each generator without synchronization would be acceptable. If synchronization is required, please specify its scope and the related technical requirements.UNOPS response: Each generator functions as a completely independent power generation unit. The primary output of an alternator is 400 volts (3-phase), and its voltage level is locally regulated—adjusted upward or downward—by its own Automatic Voltage Regulator (AVR).Since the two generators are located at geographically distinct and entirely separate sites, with no interconnection or synchronization via a common busbar, there is no electrical link or mutual influence between their respective voltage systems.Best regards,
Edited on:
12-Nov-2026 09:17
Edited by:
webservice@unops.org
New clarification added: Dear bidders, Kindly find the following clarifications and UNOPS responses: Q5: Operating Temperature – 400 kVA GeneratorSection II specifies an operating temperature range of +5°C to +55°C, while the Detailed Technical Specifications (§2.4, Service Conditions) indicate −15°C to +50°C.Could you please confirm which temperature range shall govern the technical evaluation?UNOPs Response: The operating temperature ranges between -15 degrees and 50 degrees in accordance with Section II (Detailed Technical SpecificationsQ6: Day Tank Capacity – 400 kVA GeneratorSection II (400 kVA, Fuel System) requires an integrated day tank with a minimum eight-hour capacity at full load. However, the Detailed Technical Specifications (§2.7, Fuel Supply System) specify a day tank providing four hours of operation at full load, with a maximum capacity of 50 gallons.Could you please confirm which requirement shall apply to the 400 kVA generator's day tank?We understand that the separately specified 2,000 L external fuel tank remains an additional requirement.UNOPS response: The integrated base day tank for the 400 kVA generator must have a minimum capacity sufficient for eight (8) hours of continuous operation at full prime load, superseding any conflicting mention in §2.7. In addition, the separately specified 2,000 L external fuel tank remains an active and mandatory requirement, as detailed in the tender documents and BOQ.Q7: Installation, Testing, Commissioning, Acceptance and Defect ResponsibilitySection II indicates that installation will be carried out by a separate contractor within a four-month period, while the generator supplier is also required to undertake testing and commissioning activities.Could UNOPS please clarify the respective responsibilities of the generator supplier and the installation contractor, particularly regarding installation supervision, mechanical/electrical connections, on-site testing, commissioning and final acceptance?UNOPS response: The scope under this contract includes the supply, delivery to site, offloading, and conducting testing and commissioning of the generator sets. Physical installation, civil base works, cable laying, and building ventilation are executed by a separate contractor. The supplier is expected to coordinate during commissioning.Furthermore, while we acknowledge the stipulated 72-hour response and 14-day corrective-action requirements for manufacturing or factory defects, we would appreciate clarification on how responsibility would be determined where equipment defects or failures arise during installation by the separate contractor.In particular, what assessment or verification procedure would apply in cases where the cause of a defect is unclear or disputed between the parties, and how would the corrective-action timelines be managed in such circumstances?Finally, please confirm the event that formally establishes the commencement of the warranty period.UNOPS response: If the inspection determines that the defect is intrinsic to factory manufacturing, we will fulfill our warranty obligations within the agreed timeframes.If the root cause is determined to be improper handling, incorrect installation, or deviations from our supplied installation manuals/specifications, liability will rest with the installation contractorQ8: ATS and Master Paralleling System – Scope of Supply (100 kVA and 400 kVA)The Detailed Technical Specifications for both the 100 kVA and 400 kVA generator sets (§1.1 and §2.15) refer to Automatic Transfer Switches and a complete Master Paralleling and Control System, including provisions for multiple generators and PV integration. However, these are not separately identified in the respective BOQs.UNOPS response: A separate external ATS and Master Paralleling System cabinet is **not** included in the scope of supply of this RFQ (it will be implemented under the installation package). However, the generator control panels provided under this tender must feature the necessary interfaces and control capabilities (including dry contacts/signals) to integrate with an external ATS and paralleling system.Could UNOPS please confirm whether the complete physical ATS and Master Paralleling and Control System are required for both generator sets, or whether providing generator control systems with the necessary ATS/paralleling interfaces and capabilities would be sufficient?UNOPS response: included in the scope of works; rather, it is listed as a separate item in the bill of quantities not in this packageWhere separate physical equipment is required, please clarify the intended scope and whether its cost should be included within the respective generator prices.UNOPS response: Its list it in the BOQ as a spare partQ9: Authorized Local Representation in SyriaSection II (Item 2.9) requires bidders not registered in Syria to provide evidence of an authorized local agent or representative. Section III (Form C, Item 2.9) additionally addresses local support for testing, commissioning and warranty services.Where a bidder appoints a Syria-based service provider that is officially authorized by the generator manufacturer to undertake testing, commissioning, after-sales support and warranty services, would such an arrangement also satisfy the requirement for the bidder's authorized local agent/representative in Syria?Alternatively, must the bidder establish a separate local agency or representation arrangement in addition to the manufacturer's authorized service provider?We would also appreciate confirmation of the documentary evidence required where the same local entity fulfils both functions.UNOPS response: A Syria-based service provider officially authorized by the generator manufacturer is fully eligible to perform local testing, commissioning, and warranty services. The bidder may utilize this same entity as its authorized local representative, provided that: (1) proof of the manufacturer's authorization to the service provider is submitted, and (2) an official representation/engagement agreement between the bidder and the local service provider is provided with the bidBest regards
Edited on:
12-Nov-2026 09:10
Edited by:
webservice@unops.org
New clarification added: Dear bidders,Kindly find the below clarifications and UNOPS responses:Q1: Under the Financial Offer Details tab, do we insert the total for both Gensets?UNOPS answer: Bidders may specify individual prices for each itemQ2: The tender is about supply, deliver to site and commissioning after installation by a 2nd party. Please confirm that the bidder will not be responsible for Installation, handling and off load including logistics within the premises eg. Crane. Also please confirm that the contractor is not responsible for any contracting extra works like foundation, adequate ventilation, etc.. UNOPS response: The bidder is responsible to deliver a two Generators to the site and use a crane to offloading the generator to the site with Initial testing, the bidder not responsible for installation or ventilation Q3: The BOQ form has a typo at item 1.1 where it mentions 400KVA and not 100KVA- we will amend this from our end.UNOPS response: It mentioned 400V, 3 Ph, 50 Hz, 100 kVA Prime Power with 10% overload capacity, including MCCB 3x200AF. for 100 KVA generator and Generator , 400 V, 3 Ph, 50 Hz, 400 kVA Prime Power with 10% overload capacity, including MCCB 3x630AF. Q4: We kindly require further clarification for the requirement and forms in regards to the (Data Check List)4.1: Agreement between the bidder and its local representative, where applicableUNOPS response: This requirement applies exclusively to bidders not registered in Syria. In accordance with Criterion 3.1:Bidder shall possess a valid business registration or commercial license in Syria, or in its country of establishment, valid at the date of quotation submission. A bidder not registered in Syria shall provide evidence of an authorized local agent or representative in Syria.4.2: Delivery Requirements and Comparative Data Table, completedUNOPS response: This table is available in both "RFQ_Section_III_ReturnableBiddingForms" and Section II Schdule of Requirements4.3: What is the difference between Form D: Previous Experience Form and your point 6. Client References: Completion certificates, purchase orders, contracts, or invoices with delivery notes, for the referenced contractsUNOPS response: Under Form D, the bidder must declare all relevant experience and projects executed during the past 3 years. The completion certificate (or client reference document) is distinct supporting evidence required to substantiate that at least one of those contracts was successfully completed4.4: Where the bidder supplies through a local distributor, the authorization form issued by the local distributor to the bidder, together with the manufacturer authorization issued to that distributor UNOPS response: UNOPS confirms that whenever a bidder supplies equipment through a local or third-party distributor rather than directly from the Original Equipment Manufacturer (OEM), both documents are mandatory. The bidder must submit: (1) the manufacturer’s authorization issued to the local distributor, and (2) the local distributor’s authorization issued to the bidder. This documentation is required to establish an unbroken, verifiable chain of authorization and ensure full manufacturer warranty and supportBest regards
Edited on:
11-Nov-2026 13:17
Edited by:
webservice@unops.org
New amendment added #1: This amendment # 1 is issued to upload the Technical Specifications for Generators documents. The updated documents are available under Documents tab under the name: Technical Specifications for Generator Set (100kVA)- Version 1 and Technical Specifications for Generator Set (400kVA)- Version 1
Edited on:
03-Nov-2026 09:24
Edited by:
webservice@unops.org