Emergency Procurement: Supply of Prefabricated Concrete Transformer Substations (PCTS) 6.3/10.5 kV to Ukraine
UNOPS
Emergency Procurement: Supply of Prefabricated Concrete Transformer Substations (PCTS) 6.3/10.5 kV to Ukraine
Request for quotation
Reference:
RFQ/2026/65209
Beneficiary countries or territories:
Ukraine
Registration level:
Basic
Published on:
29-Oct-2026
Deadline on:
19-Nov-2026 21:59 (GMT 0.00)
Expires within 1 days
Description
Request for Quotation for Supply of Prefabricated Concrete Transformer Substations (PCTS) 6.3/10.5 kV to Ukraine.
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
New amendment added #3: Dear Bidders,Please be advised that RFQ/2026/65209 has been revised and amended.Requirements 1.7.1 and 1.7.3 have been revised as follows:1.7.1. Provide an operating power supply for the 6.3 kV and 10.5 kV switchgear, ensuring reliable uninterruptible power supply to all relay protection devices, control and signalling circuits, including by means of an operating power cabinet with a storage battery for autonomous supply of these systems.The battery capacity shall be calculated for a load of 2 kW during not less than 7 hours (i.e. not less than 14 kWh of usable energy).1.7.3. Substation auxiliary power network: provide an LV auxiliary switchboard for the PCTS own needs and auxiliary control circuits supply. The LV auxiliary switchboard shall be supplied only from the external 0.4 kV supply provided by the Recipient, via one incoming terminal; an automatic transfer switch (ATS) is not required. Provide an uninterruptible power supply for the LV auxiliary switchboard; it may be implemented as one common system with the operating power supply per Clause 1.7.1.The following documents have been replaced with the updated versions:1) Document RFQ_2026_65209_Section_II_Schedule of Requirements_Revision 01has been replaced with the documentRFQ_2026_65209_Section_II_Schedule of Requirements_Revision 022) DocumentRFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 01has been replaced with the documentRFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 02Please use the revised version of this document when preparing and submitting your quotation.The bid submission deadline for this RFQ has been extended to 23:59 (Kyiv time), 19.11.2026.Thank you.With best regards,UNOPS Procurement Team__________________________________________Шановні учасники!Повідомляємо, що до RFQ/2026/65209 було внесено зміни та доповнення.Вимоги 1.7.1 та 1.7.3 було переглянуто наступним чином:1.7.1 Передбачити наявність оперативного струму в РП 6,3 та 10,5 кВ із надійним безперебійним живленням усіх пристроїв РЗА, кіл керування та сигналізації зокрема з використанням шафи оперативного струму (ШОС) з АКБ для автономного живлення систем. Ємність акумуляторних батарей розраховується на навантаження 2 кВт протягом не менше 7 годин (тобто не менше 14 кВт·год корисної енергії).1.7.3. Мережа власних потреб підстанції: передбачити щит власних потреб НН для живлення власних потреб БКТП та допоміжних кіл керування. Щит власних потреб НН живиться лише від зовнішнього вводу 0,4 кВ, що забезпечується Отримувачем, через один ввід; автоматичне введення резерву (АВР) не потрібне.Передбачити джерело безперебійного живлення для щита власних потреб НН; воно може бути виконане як єдина система з оперативним живленням за п. 1.7.1.Наступні докумнети було замінено оновленими версіями:1) Документ RFQ_2026_65209_Section_II_Schedule of Requirements_Revision 01замінено документом RFQ_2026_65209_Section_II_Schedule of Requirements_Revision 022) Документ RFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 01замінено документом RFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 02Будь-ласка, використовуйте оновлену редакцію документів під час підготовки та подання тендерної пропозиції.Кінцевий термін подання пропозицій за цим запитом цінових пропозицій (RFQ) продовжено до 23:59 (за київським часом) 19.11.2026.Дякуємо.З повагою,UNOPS Procurement Team
Edited on:
17-Nov-2026 12:41
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,Please find below the additional clarifications regarding the Schedule of Requirements of this RFQ:1) Should a separate cubicle with a load-break switch, fuses and a 6(10)/0.4 kV auxiliary transformer be added to the 6(10) kV switchgear for the main supply of the LV auxiliary switchboard?No. A separate cubicle with an auxiliary transformer is not required. The LV auxiliary switchboard shall be supplied only from the external 0.4 kV supply provided by the Recipient (Clause 1.7.3).2) What is the logic and configuration of the automatic transfer switch (ATS) in the LV auxiliary switchboard, given that the PCTS has one power transformer and one incoming supply?An ATS is not required. The requirement for the ATS function in Clause 1.7.3 is deleted.3) Which UPS model and characteristics shall be considered?The UPS/operating power supply model is not specified and shall be selected by the Manufacturer. The UPS of the LV auxiliary switchboard (Clause 1.7.3) and the operating power cabinet with storage battery (Clause 1.7.1) may be implemented as one common system. The battery capacity shall be calculated for a load of 2 kW during not less than 7 hours (i.e. not less than 14 kWh of usable energy).Please consider these clarifications while preparing your tecрnical proposal.Thank you. With best regards,UNOPS Procurement Team _________________Шановні Учасники,Нижче наведено додаткові уточнення стосовно Технічного завдання цього запиту RFQ:1) Чи потрібно додати до складу РП-6(10) кВ окрему комірку з вимикачем навантаження, запобіжниками та ТВП 6(10)/0,4 кВ для основного живлення щита власних потреб?Ні. Окрема комірка з ТВП не потрібна. Щит власних потреб живиться лише від зовнішнього вводу 0,4 кВ, що забезпечується Отримувачем (п. 1.7.3). 2) Яка логіка роботи та конфігурація АВР у щиті власних потреб, враховуючи, що в БКТП один силовий трансформатор і один ввід?АВР не потрібен. Вимога щодо функції АВР у п. 1.7.3 вилучається.3) Який ДБЖ (модель, характеристики) слід враховувати? Модель ДБЖ/обладнання оперативного живлення не регламентується та обирається виробником. ДБЖ щита власних потреб (п. 1.7.3) та шафа оперативного струму з АКБ (п. 1.7.1) можуть бути виконані як єдина система. Ємність акумуляторних батарей розраховується на навантаження 2 кВт протягом не менше 7 годин (тобто не менше 14 кВт·год корисної енергії).Будь ласка, візьміть дані уточнення до уваги при підготовці Ваших технічних пропозицій.Дякуюємо.З повагою,UNOPS Procurement Team
Edited on:
17-Nov-2026 11:08
Edited by:
webservice@unops.org
New amendment added #2: Dear Bidders,Please be informed that the bid submission deadline for this RFQ has been extended to 17:00 (Kyiv time), 18.11.2026.Thank you.With best regards,UNOPS Procurement Team__________________________________________Шановні учасники!Повідомляємо вас, що кінцевий термін подання пропозицій за цим запитом цінових пропозицій (RFQ) продовжено до 17:00 (за київським часом) 18.11.2026.Дякуємо.Дякуємо.З повагою,UNOPS Procurement Team
Edited on:
13-Nov-2026 16:18
Edited by:
webservice@unops.org
New clarification added: The 6.3/10.5 kV 1600 kVA (EKO2) transformer is a non-standard, made-to-order item, and its manufacturing lead time may be up to 6 months. Would it be acceptable to deliver the transformers as a separate batch, with the rest of the equipment delivered within 120 days? __CLARIFICATION RESPONSE__ Dear Bidder, Thank you for your clarification request. This delivery is performed within an international technical assistance project, and the delivery timeline is determined by the project completion date, accounting for the lead time required to process contractual payments. Consequently, the bidding documents require that the full delivery has to be completed within 120 calendar days. While a project extension may occur, it cannot be guaranteed at this stage as it remains outside of UNOPS’s control. With best regards, Procurement Team
Edited on:
11-Nov-2026 13:01
Edited by:
webservice@unops.org
New amendment added #1: Dear Bidders,Please be advised that RFQ/2026/65209 has been revised and amended:1) Document RFQ_2026_65209_Section_II_Schedule of Requirementshas been replaced with the documentRFQ_2026_65209_Section_II_Schedule of Requirements_Revision 012) DocumentRFQ_2026_65209_Section_III_Form G_Technical Bid Formhas been replaced with the documentRFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 01Please use the revised version of this document when preparing and submitting your quotation.Thank you.With best regards,UNOPS Procurement Team__________________________________________Шановні учасники!Повідомляємо, що до RFQ/2026/65209 було внесено зміни та доповнення.1) Документ RFQ_2026_65209_Section_II_Schedule of Requirementsзамінено документом RFQ_2026_65209_Section_II_Schedule of Requirements_Revision 012) Документ RFQ_2026_65209_Section_III_Form G_Technical Bid Formзамінено документом RFQ_2026_65209_Section_III_Form G_Technical Bid Form_Revision 01Будь-ласка, використовуйте оновлену редакцію документів під час підготовки та подання тендерної пропозиції.Дякуємо.З повагою,UNOPS Procurement Team
Edited on:
30-Oct-2026 10:27
Edited by:
webservice@unops.org