Provision of a Mini-Grid Power Station with Battery Energy Storage for Husswain – Al-Mahrah
UNOPS
Provision of a Mini-Grid Power Station with Battery Energy Storage for Husswain – Al-Mahrah
Request for quotation
Reference:
RFQ/2026/65288
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
28-Oct-2026
Deadline on:
29-Nov-2026 07:00 (GMT 0.00)
Description
Provision of a Mini-Grid Power Station with Battery Energy Storage for Husswain – Al-Mahrah
-----------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
-----------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
New clarification added: Clarification# 105: 5. Software, Server, and Licensing Requirements- Please confirm whether the system shall be hosted on a local server or cloud platform and whether all software licenses, STS key management, database, and system integration costs must be included in the bid price.- Please also clarify whether any recurring annual license, subscription, or per-meter fees are permitted.Response: The bidder shall include in its proposal all necessary software, licenses, STS key management systems, databases, system integration, and any other associated components and services required to ensure the complete and proper operation of the Smart Metering System.The proposed solution shall be fully functional and operational, with all associated costs clearly identified and included in the bid price. ion.Clarification# 106: 6. Integration with the Power Plant Control SystemPlease confirm whether the Smart Metering System is required to interface with the plant SCADA/EMS or other control systems. If so, kindly specify the required communication protocols, interfaces, and data exchange requirements.Response: We confirm that the Smart Metering System must interface with the plant SCADA/EMSClarification# 107: 7. Installation and Commissioning Scope- Regarding the smart metering system, there is a communication option superior to LoRa or PLC which is LoRaWAN. Would you like us to submit a proposal based on the options outlined in the tender documents, or would you prefer the better alternative?- Please clarify whether BOQ Item 12 includes the physical installation of all 2,200 meters at customer premises, communication infrastructure, system commissioning, testing, and end-user training, or whether the scope is limited to supply and configuration.Response: LoRa refers to the physical Radio Frequency (RF) modulation technology; therefore, LoRaWAN is not considered an alternative communication technology but rather a network protocol operating over the LoRa physical layer.Accordingly, the proposed LoRaWAN solution may be considered under the RF communication option specified in the tender documents. Bidders shall ensure full compliance with the applicable technical requirements and the provisions of the Electrical BoQ, particularly Items 12.1.1.1, 12.1.1.2, and 12.1.1.3, which specify PLC/RF communication options.
Edited on:
15-Nov-2026 22:49
Edited by:
webservice@unops.org
New clarification added: Clarification# 96: the manufacturer wants to focus on the BESS and PCS skid. the manufacturer will provide his standard high-capacity 5MWh DC block and PCS skid are designed for medium-voltage (MV) coupling (e.g., 11kV or 33kV) to reduce current levels and maximize efficiency.Would the Husswain accept a medium-voltage coupling architecture for the BESS (e.g., PCS step-up to 11kV directly to the RMU) instead of the mandated 800V LV bus? If acceptable, the integration with the PV inverters (which output 800V) would require the PV side to step up independently.Response: The required BESS and PCS specifications shall be maintained as stated in the tender documents, comprising a battery energy storage system with a nominal capacity of 3.8 MWh and a PCS rated at 1.9 MW. All bidders are required to comply with these specified capacity requirements and the system configuration indicated in the tender documents. Any proposed alternative coupling architecture, including medium-voltage coupling, shall not be considered a basis for deviating from the specified requirements.Clarification# 97: If the manufacturer intends to offer a standard 5MWh container BESS, we want to know if the 3.8 MWh EOL requirement applies to the DC block before PCS/Transformer losses, or must it be measured at the AC side after the PCS step-up? We need to confirm the measurement boundary to ensure our 5MWh DC block guarantees the 3.8 MWh AC output at Year 10. ?Response: The BESS is 3.8 MWh nominal capacity as revised in all related documents mentioned below:"REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)."In addition, the BESS system includes (battery storage 3.8 MWh nominal capacity and PCS 1.9 MW) and bidders are required to meet this requirement.Clarification# 98: The manufacturer noticed that in the existing system electrical design is using 10 energy storage cabinets with 190KW/373KWh of each for the BESS and PCS part. Theoretically, the initial storage capacity is only 1.9MW/3.73MWh, which doesn't meet the requirement of at least 3.8MWh EOL capacity.However, the manufacturer's solution uses a 5MWh battery container with 5MW PCS, which can meet the relevant requirements even considering the EOL after 10 years. Can you accept it?Response: 1. BESS is 3.8 MWh nominal capacity as revised in all related documents mentioned below:"REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)."2. The BESS system includes (battery storage 3.8 MWh and PCS 1.9 MW) and bidders are required to meet this requirement.Clarification# 99: Q 1- Item 1.2.1 (Civil BoQ): You mentioned this "The steel used will be galvanized with a minimum galvanized thickness as per iso coating standard for M4 corrosion category and medium life span using polyethylene/ zinc rich or equivalent materials." The question is can we use polyethylene-coated steel profiles for bridge and column structures?Response: No. Polyethylene-coated steel profiles are not acceptable for bridge and column structures. The steel members shall comply with the specified galvanization requirements and applicable ISO coating standards for the M4 corrosion category and medium durability.Clarification# 100: Q 2- What is the system nameplate nominal capacity as the mentioned capacity at end of life?Response: BESS is 3.8 MWh nominal capacity as revised in all related documents mentioned below:"REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)."Clarification# 101: Q 3- Item 12 (Ele. BoQ): Smart Metering System.To ensure full technical compliance and accurate pricing for BOQ Item 12 Smart Metering System, we kindly request clarification on the following points:1. Customer Interface Unit (CIU)The BOQ specifies 2,100 single-phase meters and 100 three-phase meters, while the CIU quantity is indicated as "1 System."Please clarify whether a separate CIU is required for each of the 2,200 meters or whether the stated quantity refers to one centralized system.Response: Dedicated 1-to-1 Deployment (No Centralized Architecture):The CIU will be a separate physical unit for each individual customer meter, covering all 2,200 meters (2,100 single-phase and 100 three-phase).No centralized or shared CIU architecture will be used. Because the meters utilize a split-meter configuration (with the measuring unit installed externally on poles or boundary enclosures), every consumer premise requires its own dedicated indoor CIU keypad for token entry and monitoring. The BoQ line item listing "12.1.1.3" represents the overall metering package header and requires pricing for 2,200 individual CIU unitsClarification# 102: 2. Scope of the Complete Smart Metering SystemPlease confirm whether the contractor shall supply a complete AMI/prepayment solution, including HES, MDMS, STS Vending System, key management, servers, software licenses, communication gateways, and all necessary accessories, or whether any of these components will be provided by the Employer.Response: The Contractor shall supply and deliver all components, equipment, software, licenses, and accessories explicitly specified in the BoQ. This includes the complete AMI/prepayment system components listed therein, such as HES, MDMS, STS Vending System, key management system, servers, software licenses, communication gateways, and all associated accessories, as applicable. Any items specified in the BoQ are within the Contractor's scope of supply and shall be delivered in accordance with the tender requirements.Clarification# 103: 3. Communication TechnologyThe specifications mention GPRS/4G, NB-IoT, and RF-Mesh communication options.Please confirm whether a specific communication technology is mandatory or whether any of these technologies is acceptable, provided that the complete system operates reliably and meets the technical requirements.Response: We confirm that the specific communication technology is mandatory.Clarification# 104: 4. Meter ConfigurationPlease clarify the required rated voltage, maximum current (80A or 100A), and connection type for both single-phase and three-phase meters, particularly whether the three-phase meters shall be direct-connected or CT-operated.Response: The rated voltage of both single-phase and three-phase meters shall be compatible with the applicable system voltage. The maximum current rating shall be proposed by the bidder based on the selected meter model and the manufacturer's specifications, ensuring suitability for the intended application.Regarding three-phase meters, either direct-connected or CT-operated configurations may be proposed, subject to the manufacturer's recommendations and the technical requirements of the installation.
Edited on:
15-Nov-2026 22:48
Edited by:
webservice@unops.org
New clarification added: Clarification# 87: Could you please extend the tender deadlineResponse: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 88: We kindly request an extension of the tender closing date by further ten days, as some of the manufacturers are still in the process of reviewing the required technical specifications and prepare their offersResponse: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 89: Regarding Point 2: String Inverters with Mounting Support and Concrete Foundation, kindly clarify whether the required inverters should be conventional on-grid string inverters or hybrid inverters.Section B) Hybrid System Interoperability mentions hybrid compatibility, which has caused some confusion.Should we propose on-grid string inverters or hybrid inverters ?Response: Conventional on-grid string inverters are required. Hybrid inverters are not required under this item. The reference to hybrid compatibility in SectionB) concerns system interoperability and does not change the specified inverter type. Bidders are required to meet this requirement.Clarification# 90: Q1: Regarding the item 5.2 (0.8 kV LV Switchgear) the details and capacity of the circuit breakers are NOT MATCH with the [drawing no E1-08 - page 11 - Annex 5B in switchgear box], shall the contractor put price consideration according to the drawing or BoQ specifications.IN ADDITION, the 0.8kV side of the Auxiliary transformer 25kVA shown in the drawing is protected by an MCCB rated by 6300A which is not logic. Please confirm the MCCB capacity.Response: The technical specifications required for each type of circuit breaker and the requirements necessary to ensure proper system protection is reflected in the Electrical BoQ Item No. 5.2 "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities" which has been revised to match Single Line Diagram (SLD) drawing E1-08 and as follows:a. Incoming Circuit Breakers: (15 x 400 A, 4-pole MCCBs) and (10 x 250 A, 4-pole MCCBs)b. Outgoing Circuit Breakers: (1 x 6300 A ACB) and (1 x 63 A MCCB)For Auxiliary transformers 25kVA is protected by 63 A MCCB capacity as mentioned above.Clarification# 91: Q2: There are differences in the specifications in Annex 2 and BoQ. For example, the DC Bus voltage in batteries [Annex 2 – Title 4.2 – state DC Bus Operating Range 1040V to 1512V] but in the BoQ [item 3.5 – state Rated DC voltage: ≥ 1500VDC]. Please confirm.Response: The DC bus operating voltage range specified in Annex 2, Section 4.2 (1,040–1,512 VDC) represents the battery system's operational voltage range, while the voltage specified in BoQ Item 3.5 (≥1,500 VDC) refers to the required rated DC voltage of the battery system. Bidders shall ensure that the proposed system satisfies both requirements.Clarification# 92: Q3: Regarding the inverters Item 2.1, the required limit of the THD < 1% at rated power, whereas in the Annex 2 [Title 3.5 – 𝑇𝐻Di < 3% at rated power]. Please confirm.Response: THD above 1% is not accepted.Clarification# 93: Q4: Regarding the Optical Ground Wire (OPGW) item 6.1, it is not stated to install electrical poles, and they did not exist now. How to install it?Response: The overhead transmission line installation activities are excluded from the contractor’s scope of work and shall be carried out by the relevant authorities in Al-Mahrah (PEC).The contractor’s responsibilities are strictly limited to the supply of the complete Optical Ground Wire (OPGW) fiber-optic conductor, supervision of its installation by PEC, and subsequent testing and commissioning.Accordingly, the scope of work has been revised to clearly distinguish the contractor’s obligations from PEC’s installation responsibilities, ensuring a clear definition of the contractual division of responsibilities and avoiding any potential ambiguity during implementation. "REV 1 - Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station"Clarification# 94: Q5: Regarding Smart Prepayment Meter item 12.1.1, it is not mentioned to install this item, shall the contractor supply them only? IN ADDITION, is calibration of the Smart Prepayment Meter enough in the manufacture?Response: The Contractor's scope includes the supply and installation of the part smart prepayment meters, as well as providing the necessary capacity-building and training for the relevant authorities to ensure proper installation for the remaining meters, operation and management of the meters.Furthermore, all supplied smart meters shall be accompanied by valid manufacturer-issued calibration certificates. Calibration at the manufacturing stage is acceptable, provided that the corresponding certificates are submitted with the meters.Clarification# 95: Regarding the subject, could we please have answers to the queries below?1. The quantity for the Base-Course in the BOQ item number 1.1.2 is showing 700 cubic meters, and I believe the quantity is more than that.2. The electrical SOW and BOQ, item number 6.1, state that 3 km of 11 kV OHL should be supplied and installed, but there is no drawing showing the line's route or specification for the poles and foundations. This is critical work with a high cost, and the missing information will affect the tender price.3. Regarding the implementation period, five months is a short duration given the project's location and the unstable situation in the Middle East. These issues are likely to affect the project deadline, so we ask that you consider allowing more time.4. Could you extend the clarification period by one week and move the submission date for this RFQ from 22 November 2026 to 06 December 2026?Response: 1. The quantities indicated in the BoQ are based on the current site conditions and the assessed requirements at the time of preparation. Should additional quantities be required during implementation due to actual site conditions, such variations shall be assessed, verified, and addressed in accordance with the applicable provisions and procedures of the Contract.2. The required OPGW cable length is 2 km for the overhead transmission line to be implemented by PEC to connect the solar power plant to the existing generation station. The OPGW cable shall have 24 fiber-optic cores, in accordance with the revised "Rev 1- Annex 4 – Husswain Mini-Grid Solar Power Station Bill of Quantities", Item No. 6.1.3. Please note that the work plan has been amended from 5 months to 8 months. The document REV 1 - RFQ-2026-65288- Solicitation, Sections II, III, IV, V has been amended to reflect this accordingly.4. Please be advised that the clarification deadline has been extended to 17-November-2026 @ 12:00 AM.
Edited on:
15-Nov-2026 22:45
Edited by:
webservice@unops.org
New clarification added: Clarification# 76: With reference to Annex 2 – Electrical Technical Specifications, Section 7.7 (Optical Ground Wire (OPGW) & Fiber Optic Infrastructure), we note that the tender documents do not specify the required Overall Diameter or Rated Tensile Strength (RTS) of the OPGW cable.In this regard, we kindly request UNOPS to clarify the following:Overall Diameter: Kindly confirm the required overall diameter of the OPGW cable.Rated Tensile Strength (RTS): Kindly confirm the required minimum RTS of the OPGW cable.Response: The required OPGW cable shall have 24 fibre-optic cores as mention in tender document (BoQ, Electrical Specifications). The overall diameter and Rated Tensile Strength (RTS) shall be determined by the manufacturer based on the proposed cable design, ensuring compliance with the applicable technical standards and project requirements.Accordingly, bidders shall propose an OPGW cable with 24 fibre-optic cores for 11kV transmission line and clearly indicate its overall diameter and RTS in their technical submissions.Clarification# 77: 1. Extension of the Clarification PeriodExtend the clarification period by at least 10 calendar days, allowing bidders and manufacturers sufficient time to assess the requirements and submit additional technical questions.Response: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 78: 2. Extension of the Tender Submission DeadlineExtend the current deadline of 22 November 2026 by at least 21 calendar days, to 13 December 2026, allowing bidders to incorporate UNOPS clarifications and finalize their proposals.Response: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 79: 3. Extension of the Project Implementation Period from 5 to 8 MonthsWe request that the implementation period be extended to 8 months, consistent with the timeframe referenced in the project's Environmental and Social Management Plan (ESMP).The current five-month period presents significant practical challenges, particularly considering:International banking delays: Wire transfers from Yemen can take approximately one week due to Central Bank review procedures. Additional sanctions-related compliance checks and enhanced due diligence by Chinese receiving banks can extend payment processing to approximately one month in some cases.Uncertain maritime shipping schedules: Ongoing instability affecting regional shipping routes has increased uncertainty in vessel availability, transit times, and delivery schedules.Equipment manufacturing and integration: Major components, particularly BESS, PCS, transformers, switchgear, and microgrid controllers, require manufacturing, factory testing, shipping, installation, and integrated commissioning.Response: Please note that the work plan has been amended from 5 months to 8 months. The document REV 1 - RFQ-2026-65288- Solicitation, Sections II, III, IV, V has been amended to reflect this accordingly.Clarification# 80: Regarding this tender, we would appreciate your clarification on the following points:Item 3.2 (Ele. BoQ): Please specify the total required quantity of container, as the text mentions both two 20HQ containers and one 40HQ container.Response: Only one container 20 HQ is required for BESS and all related documents already revised. (REv 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities, REV 1 - Annex 6 - Technical specifications for Goods and REV 1- Comparative Data Table and Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)Clarification# 81: Item 6.1 (Ele. BoQ): Please confirm whether the supply and installation of wooden poles are included under this item in accordance with the technical specifications.Response: The overhead transmission line installation activities are excluded from the contractor’s scope of work and shall be carried out by the relevant authorities in Al-Mahrah (PEC).The contractor’s responsibilities are strictly limited to the supply of the complete Optical Ground Wire (OPGW) fiber-optic conductor, supervision of its installation by PEC, and subsequent testing and commissioning.Accordingly, the scope of work has been revised to clearly distinguish the contractor’s obligations from PEC’s installation responsibilities, ensuring a clear definition of the contractual division of responsibilities and avoiding any potential ambiguity during implementation. "REV 1 - Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station"Clarification# 82: Deadline Extension: Given the scope and technical depth of this tender, we respectfully request an extension of the submission deadline to finalize our bid accurately.Response: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 83: Regarding Item 3.4, could you please confirm whether the PCS output voltage must be exactly 800V, or whether we can offer a different voltage (e.g., 400V) with a suitable step-up transformer to achieve the required 800V mini-grid voltage?Response: The proposed modification will not be accepted. The specified system voltage of 800 VAC shall be maintained without any deviation. Introducing a 400 VAC PCS would require additional equipment, including an isolation/coupling transformer, which would alter the approved system configuration and introduce unnecessary complexity. Furthermore, PCS equipment compatible with the specified 800 VAC system voltage is commercially available in the market.Clarification# 84: We kindly request an additional extension of at least ten (35) days beyond the current submission deadline to allow sufficient time to complete and submit a comprehensive and competitive proposal.Response: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.Clarification# 85: Regarding the BESS system, in the technical questionnaire the configuration was mentioned as 3.8MWH battery & 1.9MWH PCS as one set, whereas on the drawings it was mentioned something else. The configuration on the drawings was described as 10 sets of batteries 380KWH connected to 190KW PCS, does this mean you are flexible with any configurationResponse: The BESS system includes (battery storage 3.8 MWh and PCS 1.9 MW) and bidders are required to meet this requirement.Clarification# 86: We kindly request an extension of the deadline for this bidResponse: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.
Edited on:
15-Nov-2026 22:43
Edited by:
webservice@unops.org
New clarification added: Clarification# 66: Q08 [CRITICAL] Annex 2 requires grid-following PV inverters and grid-forming BESS; Annex 6 appears to require grid-f…Tender reference: Annex 2 §3.4 p.9; Annex 6 String Inverter Item 2Please confirm that the 15 solar string inverters are required to operate in GRID-FOLLOWING mode and that grid-forming, virtual inertia and black start are PCS/BESS functions, not mandatory native PV-inverter functions.Response: - The 15 solar PV string inverters are required to operate strictly in standard Grid-Following (GFL) mode (current source, P/Q control, synchronized to the grid/microgrid reference).- Advanced network-forming attributes—specifically Grid-Forming (GFM) voltage-source control, virtual/synthetic inertia, and Black Start capability—are system-level functions allocated exclusively to the Battery Energy Storage System (BESS) Power Conversion System (PCS), and are not mandatory native requirements for the PV string inverters.Clarification# 67: Q09 [CRITICAL] ESMP expressly assigns the 0.9km 11kV power line (17 poles and phase conductor) to PEC and excludes i…Tender reference: Annex 7A ESMP §2.4.1 pp.6–8; Electrical BoQ 6.1; E1-08 SLD; Annex 1Clarification requested Please issue a definitive split-of-scope matrix confirming whether the 0.9km 11kV power line, 17 wooden poles, AAAC phase conductors, insulators, poles, foundations, erection, OPGW and fibre terminations belong to PEC or the EPC Contractor.Response: The overhead transmission line installation activities are excluded from the contractor’s scope of work and shall be carried out by the relevant authorities in Al-Mahrah (PEC).The contractor’s responsibilities are strictly limited to the supply of the complete Optical Ground Wire (OPGW) fiber-optic conductor, supervision of its installation by PEC, and subsequent testing and commissioning.Accordingly, the scope of work has been revised to clearly distinguish the contractor’s obligations from PEC’s installation responsibilities, ensuring a clear definition of the contractual division of responsibilities and avoiding any potential ambiguity during implementation. "Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station"Clarification# 68: Q10 [CRITICAL] OPGW quantity 3km versus PEC line length ~0.9km; 12-core communications mentioned elsewhere versus 24…Tender reference: Electrical BoQ 6.1; Annex 2 §§5.9, 7.7; Annex 7A §2.4.1Clarification requested Please confirm final OPGW length, 24- versus 12-fibre design, route, splice/ODF termination points, existing poles/tower mechanical data and whether the 3km includes spare/slack lengths or another network segment.Response: The required OPGW cable length is 2 km for the overhead transmission line to be implemented by PEC to connect the solar power plant to the existing generation station. The OPGW cable shall have 24 fiber-optic cores, in accordance with the revised Annex 4 – Husswain Mini-Grid Solar Power Station Bill of Quantities, Item No. 6.1Clarification# 69: Q11 [CRITICAL] Quantities for 3×1C×300 and 3×1C×630 cables use linear meter units with unclear measurement per phase/…Tender reference: Electrical BoQ 8.2.2–8.2.7; E1-08 SLDClarification requested Do BoQ lengths (e.g., 3330m for 3×1C×300 and 720m for 3×1C×630) represent route length per complete 3-phase set, or total aggregate conductor length? Please provide a cable schedule with route length, number of parallel sets and cable metres per core.Response: The quantities specified in the BoQ represent the total aggregate length of the conductors, not the length of an individual conductor.Clarification# 70: Q12 [CRITICAL] Single-core AC and MV cables specify steel tape armour (STA), which could induce excessive losses/hea…Tender reference: Electrical BoQ 8.2.2–8.2.7Clarification requested Please confirm that single-core AC/MV power cables may use compliant non-magnetic armour (e.g. aluminium wire armour / equivalent) and approved screening/bonding, instead of ferromagnetic steel tape armour.Response: The specified AC cables shall be copper conductors, and the proposed alternative cable types or materials will not be accepted. Bidders shall strictly comply with the cable specifications and requirements stated in the Electrical BoQ, with no deviations permitted.Clarification# 71: Could you please let us know the technical details of the existing genset plant that is already equipped with controllers ?Response: All details already included in the drawing SLD sheet No. E1-08 in "REV 1 - Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing " and DEIF controllers currently exist as controllers.Clarification# 72: Pls clarify the following:End-of-Life (EOL) Capacity:Discrepancy: Annex 2 states a requirement of at least 70% remaining capacity at 6,000 cycles. However, the Bill of Quantities (BoQ) and Annex 6 state a requirement of 80%.Clarification needed: Which of these target percentages should we follow for our compliance and pricing?Response: Please refer to the amended document "REV 1- Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications" and 80% capacity is requiredClarification# 73: Container Size:Discrepancy: The BoQ specifies 2 × 20 ft containers, whereas Annex 2 mentions a 40 ft container.Clarification needed: Could you please confirm the required container configuration and size?Response: Only one container 20 HQ is required for BESS and all related documents already revised. (REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities, REV 1 - Annex 6 - Technical specifications for Goods and Comparative Data Table and REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)Clarification# 74: Energy Basis (Nominal vs. EOL):Discrepancy: Annex 4 specifies 3.8 MWh nominal capacity, while Annex 2 specifies 3.8 MWh EOL (End of Life) capacity. An EOL requirement of 3.8 MWh implies that the system must maintain this capacity after 10 years of operation, which would necessitate a higher initial nominal capacity (approximately 4.5 to 5 MWh).Clarification needed: Please clarify whether the 3.8 MWh figure refers to the initial nominal capacity or the guaranteed EOL capacity.Response: The nominal energy capacity is 3.8 MWh as per the revised BoQ and drawings "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities and REV 1 - Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing No. E1-09."Clarification# 75: We are writing to formally request two weeks extension for the tender submission deadline to ensure we can deliver a highly competitive and comprehensive proposal that fully aligns with your requirementsResponse: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.
Edited on:
15-Nov-2026 22:41
Edited by:
webservice@unops.org
New clarification added: Clarification# 60: Q02 [CRITICAL] No advance; monthly certified work; Schedule V shows plant/materials delivered to site under monthly …Tender reference: Section IV Schedule 1, PDF pp.10–11; Section V 3.4, PDF p.24; Contract GCC 10.3–10.4Clarification requested Will certified major imported equipment (PV modules, PCS/BESS, transformer, RMU) be payable upon delivery and inspection at site, prior to installation? If not, specify payment milestones or a measurable payment schedule for manufacturing and equipment delivery.Response: In accordance with the contract payment modality, payments shall be made based on the actual activities completed and duly certified by UNOPS, as specified in the Contract. Accordingly, payment eligibility shall be determined by the achievement and certification of the applicable contractual milestones. Delivery of equipment to the site, in itself, does not constitute an independent basis for payment unless expressly provided for in the Contract.Clarification# 61: Q03 [CRITICAL] Annex 2 requires 3.8 MWh usable AC energy at YEAR 10, whereas Annex 6 / BoQ state >=3.8 MWh nominal D…Tender reference: Annex 2 §4.1 & §17, PDF pp.13,52; Annex 6 Item 3.1; Electrical BoQ 3.3 / 3.15Clarification requested Please confirm the binding battery acceptance criterion is ≥3.8 MWh NOMINAL DC at beginning of life (BOL), with degradation/warranty stated separately. Please issue a formal amendment removing the contradictory 3.8 MWh usable AC at end-of-life wording.Response: BESS is 3.8 MWh nominal capacity as revised in all related documents mentioned below:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications).Clarification# 62: Q04 [CRITICAL] PCS >=1.9 MW continuous grid forming at 800 VAC; 800 V PCS availability may be constrained.Tender reference: Annex 2 §§4.1–4.3, PDF pp.13–15; Annex 6 3.2; updated electrical SLD E1-08Clarification requested Will UNOPS accept a grid-forming PCS at 690 VAC connected to the specified 800 VAC common bus through a suitably sized isolation/coupling transformer (including losses, protection and black start), with 1.9 MW net continuous output at the point of interconnection? If yes, define approval/submittal requirements.Response: The proposed modification will not be accepted. The specified system voltage of 800 VAC shall be maintained without any deviation. Introducing a 690 VAC PCS would require additional equipment, including an isolation/coupling transformer, which would alter the approved system configuration and introduce unnecessary complexity. Furthermore, PCS equipment compatible with the specified 800 VAC system voltage is commercially available in the market.Accordingly, bidders shall comply fully with the specified 800 VAC requirement and submit a compliant grid-forming PCS solution without introducing any changes to the specified system voltage.Clarification# 63: Q05 [CRITICAL] Supplier requests clarification whether seamless switching is physical transfer within 20ms or sampli…Tender reference: Annex 2 §§4.3–4.7, pp.14–17; Electrical BoQ 3.4–3.6Clarification requested Please distinguish the required switching transitions (GFM PCS↔diesel-forming, PCS GFM↔GFL, utility↔island), and state any mandatory zero-break/≤20ms load-transfer performance, acceptable interruption duration and FAT/SAT measurement points.Response: The switching and transition methodology for the BESS requires seamless, zero-break coordination across multiple operational states. When the BESS transitions from its primary Grid-Forming (GFM) mode to a Grid-Following (GFL) and dynamic droop mode upon the startup and synchronization of the 1,250 kVA diesel generators, or when shifting between utility and islanded states, the control architecture maintains voltage stability within ±0.1 Hz steady-state precision. Critical performance metrics include an end-to-end control loop latency of ≤100 ms, a sampling rate of ≤20 ms for voltage and frequency, and an active power Fast Frequency Response (FFR) injection burst within ≤50 ms during major frequency deviations. Acceptable interruption duration is strictly zeroed for automated synchronizations, while a communication watchdog timeout exceeding 500 ms forces the BESS into an autonomous local frequency-watt droop fail-safe mode. Verification of these capabilities during Factory Acceptance Testing (SAT/FAT) requires measurement points across the 800 VDC battery racks, 800 VAC PCS terminals, 11 kV transformer and OHL distribution interfaces, and OPGW communication heartbeat loops. All above clarification already mentioned in REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications section 4.3 to 4.7Clarification# 64: Q06 [CRITICAL] Black start of 7 MVA step-up transformer and 11kV OHL is required from 1.9 MW PCS; transient/inrush a…Tender reference: Annex 2 §4.3–4.7, pp.14–17; E1-08 SLD; 7 MVA transformerClarification requested Please provide transformer inrush/magnetization and fault-level study, or confirm whether controlled pre-insertion, transformer energization device or staged energization may be incorporated; specify acceptable voltage/frequency limits and witness tests.Response: The BESS should utilize a firmware-driven controlled voltage ramp-up strategy, soft-ramping output AC voltage from 0 V to 800 V over a configurable time window to eliminate transient inrush spikes. This is executed through a strict staged energization sequence that powers the local 0.8 kV switchgear, ramps the 7 MVA transformer to 11 kV, and energizes the 11 kV OHL up to the RMU terminal before synchronization. Throughout these procedures, the system maintains strict operational limits, keeping steady-state frequency precision within ±0.1 Hz, steady-state voltage within ±2% and restricting transient dips. Compliance and performance are validated via mandatory witness tests during FAT and SAT, specifically verifying the transformer soft-ramp energization profile, end-to-end black-start isolation sequences, and response latencies against system fault levels. All above clarification already mentioned in REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications section 4.3 to 4.7Clarification# 65: Q07 [CRITICAL] Annex 2 THD ≤1% at nominal, but weak-grid section permits THDi <3%; commercial 350kW inverter measure…Tender reference: Annex 2 §3.3 p.9 & §3.5 p.10; Annex 6 String InverterClarification requested Please confirm whether the binding inverter THDi limit is <1% or <3% at specified rated conditions; clarify testing conditions (P, PF, grid impedance/SCR, background THD, load percentage) and update all relevant clauses consistently.Response: The required THD is ≤ 1%. and all testing conditions are as mentioned in REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications section 3.4 and no updates required.
Edited on:
15-Nov-2026 22:38
Edited by:
webservice@unops.org
New clarification added: Clarification# 50: 5. There are discrepancies between the BOQ Item No. 5.2 and the Single Line Diagram (SLD) regarding the number, type, and ratings of circuit breakers for the 0.8 kV LV Switchgear, as detailed below:a. Incoming Circuit Breakers:i. Drawings: (15 x 400 A, 4-pole MCCBs) and (10 x 250 A, 4-pole MCCBs)ii. BOQ: (24 x 300 A, 4-pole ACBs)b. Outgoing Circuit Breakers:i. Drawings: (1 x 6300 A ACB) and (1 x 6300 A MCCB)ii. BOQ: (1 x 6000 A ACB) and (1 x 1000 A ACB). Please clarify.Response: Electrical BoQ Item No. 5.2 "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities" has been revised to match Single Line Diagram (SLD) drawing E1-08The correction is as follows:a. Incoming Circuit Breakers: (15 x 400 A, 4-pole MCCBs) and (10 x 250 A, 4-pole MCCBs)b. Outgoing Circuit Breakers: (1 x 6300 A ACB) and (1 x 63 A MCCB)Clarification# 51: 6. In BOQ Item No. 10.1 (Earthing System), the note states that the existing earth pits are excluded from the item, and the contractor shall connect to the existing earth pits and provide additional earth pits as required. Kindly indicate the locations of the existing earth pits and provide the relevant layout drawings, if available.Response: bidder shall strictly adhere to the quantities specified in the Material Schedule Table under Section 9.6 of the Technical Specifications (REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications), specifically electrical BoQ Items 10.1 and 11.1 in REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities, covering the earthing and lightning protection systems, respectively. The BoQ explicitly refers bidders to the Technical Specifications for these requirements; therefore, the specified quantities shall be considered mandatory.Clarification# 52: 7. In BOQ Item No. 11.1, the lightning arrester length is specified as 1 meter, whereas Detail Drawing No. D-06 (Lightning Protection System Installation) indicates a length of 50 cm. Kindly clarify the required lightning arrester length .Response: Please refer to the updated BoQ (REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities) as the requirement is ESE and not air terminal arrester.Clarification# 53: We would like to inform you that we are dealing with Saba Bank to receive our financial payments transferred by UNOPS. We would also like to confirm that the bank continues to maintain a good liquidity position and has the ability to meet its financial obligations. We have not encountered any significant difficulties in receiving our payments through the bank.Based on our direct experience and ongoing dealings with Saba Bank, we consider it a suitable banking institution that continues to provide its banking services satisfactorily.However, should you have any concerns or reservations regarding dealing with Saba Bank, or if the bank is not approved by UNOPS, we kindly request that you inform us accordingly so that we may consider the matter and take the necessary steps.Response: Bidders are required to submit any financial documents issued from certified banks and banks that are not under any kind of sanctions.Clarification# 54: Regarding Point 2 – String Inverters, kindly clarify the following:a. THD: The tender requires THD below <1% at rated load. Would inverters with THD below <3% be acceptable?b. SPD: Would DC Type II and AC Type II SPDs be acceptable as an alternative to the specified integrated Class I+II (Type 1+2) protection?Response: a. THD above 1% is not accepted.b. Any alternative arrangement may be considered acceptable, provided that it delivers equivalent protection functionality and meets the required technical performance, safety standards, and applicable specifications.This has been revised under the following documents:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 55: Regarding Annex 6 – Technical Specifications for Goods and Comparative Data Table, kindly confirm whether we are required to submit datasheets only for the items specifically mentioned in Annex 6, rather than for all items listed in the BOQ.Response: The technical evaluation will be on the items mentioned in the technical questionnaire and the bidders should ensure attaching all required supporting documents, however, if a bidder wish to provide the catalogs/datasheets for the BoQ items there is no problem as long as they fulfill the TQ supporting documents.Clarification# 56: Regarding Point 3 – Battery Energy Storage System (BESS), kindly clarify whether the required container configuration is 20HQ or 40HQ.Would a single 40HQ container or two 20HQ containers be acceptable?Response: The requirements is only one container 20 HQ for the BESS. The documents have been revised to reflect this and are as follows:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 57: Regarding Point 3 – BattEnergy Storage System (BESS), kindly clarify whether the required the manufacturer shall be tier 1 or any good manufacturing have the same requirements certificateResponse: It should be tier 1 and grade A as mentioned in the documents:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 58: As per our meeting, you informed us that we are required to submit datasheets only for the items listed in the Technical Form Table, and not for all items included in the BOQ. Kindly please confirm usResponse: The technical evaluation will be on the items mentioned in the technical questionnaire and the bidders should ensure attaching all required supporting documents, however, if a bidder wish to provide the catalogs/datasheets for the BoQ items there is no problem as long as they fulfill the TQ supporting documents.Clarification# 59: Could you please let us know the technical details of the existing genset plant that is already equipped with controllers ?Response: All details are already included in the drawing SLD sheet No. E1-08 in "REV 1 - Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing " and DEIF controllers currently exist as controllers.
Edited on:
15-Nov-2026 22:34
Edited by:
webservice@unops.org
New clarification added: Clarification# 39: Can you support us with the following questions for this tender1. THDi: Annex 2 specifies THDi below 1% in some sections but below 3% in its weak-grid stability discussion. Which limit governs acceptance? Can less than 3% THDi accepted ?Response: THD above 1% is not accepted.Clarification# 40: 2. Grid-forming: Annex 6 requires grid-forming and black-start capability from the PV inverters, whereas Annex 2 describes them as grid-following. Can UNOPS confirm that:- Grid-forming and black-start functions are provided by the BESS PCS- Grid-following PV inverters are acceptable?Response: String inverters must be Grid Following operation as slaves to the BESS Grid Forming PCS or Diesel generators.Clarification# 41: 3. Surge protection: Can the SPD arrangement in Annex 2, Section 3.8, be accepted instead of the integrated Type I+II requirement in Annex 6, provided the complete installation has coordinated surge protection?Response: Any alternative arrangement may be considered acceptable, provided that it delivers equivalent protection functionality and meets the required technical performance, safety standards, and applicable specifications.This has been revised under the following documents:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitisREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 42: 4. AFCI: Is certified DC AFCI mandatory for the utility-scale string inverters, or can alternative string-fault detection, thermal monitoring and DC isolation protection be accepted?Response: Yes, if explicitly stipulated in the Employer's Requirements / Technical Specifications (typically referencing IEC 63027 or UL 1699B). In utility-scale installations, DC Arc-Fault Circuit Interruption (AFCI) has become a standard requirement by off-takers, lenders, and technical advisors (e.g., DNV, Fichtner) to mitigate thermal runaway and catastrophic fire risks across large DC string arrays.Clarification# 43: In item no.7 we review the SLD, the drawing said the new RMU will be 2 LBS and 1 VCB which is CCV configuration. but in the bill of quantity file, it said 2 VCB incomer and 1 VCB feeder. please comfirm which is correct.Response: The insultion voltage rating for the SC cables has been amended to read between 1.2 to 3 kV as per manufacturer recommendation of string inverters and other related equipment. Kindly refer to the revised electrical BoQ "REV 1- Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis" item No. 8.2.Clarification# 44: Regarding the BoQ an AC cable insulation rating of 1 kV. However, since the output voltage from the On-grid Inverters and PCS is 800 V AC, a 1 kV rating (U_0/U = 1/0.6 kV) does not provide an adequate safety margin for continuous operation and voltage transients.Could you please confirm the recommended insulation voltage rating for these AC cables?Response: The insulation voltage rating for the SC cables has been amended to read between 1.2 to 3 kV as per manufacturer recommendation of string inverters and other related equipment. Kindly refer to the revised electrical BoQ "REV 1- Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities" item No. 8.2.Clarification# 45: Regarding the Smart Transformer Station specifications for the 7 MW solar plant, the tender documents specify a low-voltage side of 800 V AC.However, according to standard international manufacturing practices, step-up transformers in this category are standardly rated at 1 kV on the low-voltage side to deliver an operational output of 800 V AC. To strictly meet the 800 V AC operational output under standard manufacturing block sizes, selecting a slightly larger capacity transformer station is often required.Could you please clarify if we are permitted to select the next standard available larger transformer capacity to ensure full compliance with international standards and optimal system matching?Response: There is flexibility with 30% extra as already revised in related documents:REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 46: With reference to the tender documents issued for the above-mentioned project, and following our thorough review of the Bill of Quantities (BOQ), Technical Specifications, and engineering drawings, we kindly request your clarification on the technical queries and discrepancies observed below to enable us to prepare our proposal accurately:1. In BOQ Item No. 7.2, the air conditioner capacity is specified as 1 Ton, whereas in BOQ Item No. 7.4, it is specified as 2 Tons. Kindly clarify the required capacity.Response: The required air conditioner capacity is 1 Ton as revised in electrical BoQ Item 7.4 (REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities)Clarification# 47: 2. There is a discrepancy between the Technical Specifications and the BOQ Item No.6.1 regarding the number of cores required for the OPGW – Optical Ground Wire. Kindly clarify the required number of cores?Response: The technical specifications and the BoQ both mention the required number of cores for the OPGW which is 24 fiber cores. Kindly refer to these documents.Clarification# 48: 3. Regarding Section 9.6 – Material Schedule for Earthing & Lightning Protection Systems (Material Schedule Table) in Electrical Technical Specification, should we follow the quantities specified in the provided schedule for both the earthing and lightning protection systems?Response: Yes, the bidder shall strictly adhere to the quantities specified in the Material Schedule Table under Section 9.6 of the Technical Specifications, specifically electrical BoQ Items 10.1 and 11.1 in REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities, covering the earthing and lightning protection systems, respectively. The BoQ explicitly refers bidders to the Technical Specifications for these requirements; therefore, the specified quantities shall be considered mandatory.Clarification# 49: 4. In BOQ Item No. 5.2, the total rated current of the circuit breakers exceeds the current-carrying capacity of the busbar. Please ClarifyResponse: Please refer to the revised documents REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsThe correction includes:The busbar must be sized as 1.25 x rated capacity
Edited on:
15-Nov-2026 22:31
Edited by:
webservice@unops.org
New clarification added: Clarification# 35: Part threeFollowing our review of the tender documents, drawings, BOQ, and technical specifications we kindly request clarification on the following technical points:5. Earthing System – Earth ResistanceAs per Tender BOQ – Annex 4:Supply, install, test and commission a complete earthing grid and bonding system for PV arrays, string inverters, BESS containers, 7 MVA Transformer station with 0.8 kV LV Switchgear, and 11 kV OHL, as per specifications and drawings.Minimum requirements:Earthing Grid Copper Conductor of minimum size 50 mm².Earthing Grid Depth: 0.5 Meter as per the specification and drawing.Earthing Grid Area: L: 166 m × W: 87 m.Earth electrodes/pits, copper conductors, bonding, clamps and couplers to all metallic parts.Target earth resistance: ≤ 1 Ohm (or lower if required by Employer).Exothermic welding or approved clamps; test links.Compliance: IEC 60364-5-54 / BS 7671 / IEEE80.Includes earth testing with calibrated tester and reports.Earth resistance should be tested in the presence of the UNOPS representative by a calibrated earth tester, and the earth resistance should not be more than 5 Ohm.Note: The item does not include the existing earthing pit, only connection to the existing pits and adding any additional earthing pits required.As per Annex 2:Resistance Limit: The main grid resistance must be ≤ 1.0 Ω (Calculated at 0.20 Ω).Request for Clarification:Please clarify the required earth resistance limit: ≤ 1 Ohm or 5 Ohm.Response: The earth resistance ≤ 1 Ohm as corrected in tender document "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis"Clarification# 36: 6. Lightning Protection System – Type of Lightning RodsAs per Tender BOQ – Annex 4:Supply, install, test and commission an ESE lightning protection system for the PV Area, BESS containers, 7 MVA Transformer Station with 0.8 kV LV Switchgear, and 11 kV Overhead Line, as per specifications and drawings.Minimum requirements:Design per IEC 62305, NFC 17-102 (2011); ESE Lightning Rods with Efficiency (ΔT): 60 μs.Down conductors, test joints, and earth termination.Bonding with earthing system; separation distance maintained.Includes risk assessment assumptions and as-built test records.Lightning protection materials per IEC 62305.Includes air terminals, down conductors (copper 50 mm² with saddles/clamps), test joints, and earth termination.Air terminals (Franklin rods) SS/Cu, 1 m height with base and fixings.Down conductor copper 50 mm² with saddles/clamps, test joints and bonding accessories.As per Annex 2:Quantity: 4 ESE Lightning Rods.Efficiency (ΔT): 60 μs (Model PDC 6.4 or equivalent).Mounting: 6 m elevation masts above the highest equipment point.Protection Radius (Rp): ≈86.7 m at Level II.Request for Clarification:Please clarify the required lightning protection rod type, considering that the BOQ refers to both ESE lightning rods and Franklin rods.Response: The required lightning protection rod type is ESE as corrected in tender document " REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis"Clarification# 37: 7. Lightning Protection System – Shadow EffectAs per Annex 2, the lightning rods shall be mounted on 6 m elevation masts above the highest equipment point.Request for Clarification:Has the shadow effect created by these 6 m elevation masts on the PV modules been considered in the project design?Response: All shading-related calculations and assessments have already been considered during the design stage. Accordingly, the bidder shall strictly comply with the minimum technical requirements specified in the tender documents, with no deviations permitted.Clarification# 38: In order to ensure the submission of a highly comprehensive, fully compliant, and competitive technical and financial proposal that meets the strict standards and detailed requirements of UNOPS, we kindly request a deadline extension of at least one (1) week.Due to the complex technical specifications and the coordination required with international manufacturers to assemble an integrated offer, this additional time is essential for us to finalize a high-quality submission.Response: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.
Edited on:
15-Nov-2026 22:27
Edited by:
webservice@unops.org
New clarification added: Clarification# 33: Part Two Following our review of the tender documents, drawings, BOQ, and technical specifications we kindly request clarification on the following technical points:3. 7 MVA Step-Up Transformer – Short-Circuit Impedance (Z%)As per Tender Drawing – Annex 5 and Tender BOQ – Annex 4:Rating: 7.0 MVA (Continuous Maximum Rating).Voltage Ratio: 11 kV / 0.8 kV.Cooling and Type: Oil-immersed with ONAN/ONAF cooling.Vector Group: Dyn11.Winding Material: High-grade electrolytic copper with Class A (105°C) insulation.Impedance: 6% at 75°C.Core: High-grade, grain-oriented silicon steel with mitred joints for low noise and minimal no-load losses.Tap Changer: Off-Circuit Tap Changer (OCTC) with a range of ±2 × 2.5%.Protection Devices: Buchholz relay (double-float), Magnetic Oil Level Gauge (MOG), Pressure Relief Device (PRD), and DGPT (Detection of Gas, Pressure, and Temperature).Conservator: Sized for expansion from -5°C to +100°C; includes a silica gel breather and sump for sludge.Valves: Tinned brass or stainless steel; includes drain, filter, and oil sampling valves.Winding: Electrolytic copper, paper-insulated, designed for high short-circuit strength.Bushings: Outdoor porcelain or resin-molded; 12 kV (MV) and 1.1 kV (LV) ratings.As per Standard Specification after Calculations:The same specifications are stated, except:Short Circuit Impedance at Rated Current Z%: 8% at 75°C as IEC 60076-5.Notes:Z%: 8% as IEC 60076-5.If they connect this system with the Public Grid, the transformer short-circuit current = 63.15 kA/1 sec at the 0.8 kV side, whereas it was 84.2 kA/1 sec at 0.8 kV and Z% = 6%.Request for Clarification:Please clarify and confirm the required Short Circuit Impedance at Rated Current Z% value, considering the above discrepancy between 6% and 8%.Response: Short Circuit Impedance at Rated Current 7% as revised in BoQ and drawing "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis and REV 1 - Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing No. E1-08."Clarification# 34: 4. 0.8 kV LV Switchgear – Circuit Breaker SpecificationsAs per Tender Drawing – Annex 5:Rating: 0.8 kV, 6300A, 50Hz, IP55.Busbars: Tinned high-conductivity copper, rated for 6300A continuous.Circuit Breakers: Low-Voltage Air Circuit Breaker (ACB), 4 or 3-Pole, withdrawable type, with motorized spring-charging mechanism with shunt trip and under-voltage release, rated continuous current: 1 × 6300A.Minimum 15 Pieces of 4-Pole, 300A Circuit Breakers (MCCBs).Minimum 10 Pieces of 4-Pole, 200A Circuit Breakers (MCCBs).Multifunction Meter: Digital device that measures, monitors, and displays multiple electrical parameters, such as voltage, current, power, energy, and frequency.Safety: Internal arc classification and mechanical interlocks to prevent breaker movement while in the "ON" position.SPD: Integrated Class I+II (Type 1+2) Surge Protective Devices located after the main ACB.As per Tender BOQ – Annex 4:Rating: 0.8 kV, 6300A, 50Hz, IP55.Busbars: Tinned high-conductivity copper, rated for 6300A continuous and 50kA (1 sec) short circuit, dimension 5 × (100 mm × 10 mm).Circuit Breakers: Vacuum (VCB)/Air withdrawable Circuit Breakers (ACB) with motorized mechanisms (1 × 6000A, 1 × 1000A ACBs), Minimum 24 Pieces of 4-Pole, 300A Air Circuit Breakers (ACB), Draw-out type.Mechanism: Motorized spring-charged with shunt trip and under-voltage release.Protection: Integrated microprocessor trip units with LSIG (Long-time, Short-time, Instantaneous, Ground fault) functionality.Multifunction Meter: Digital device that measures, monitors, and displays multiple electrical parameters, such as voltage, current, power, energy, and frequency.Safety: Internal arc classification and mechanical interlocks to prevent breaker movement while in the "ON" position.SPD: Integrated Class I+II (Type 1+2) Surge Protective Devices located after the main ACB/VCB.As per Annex 2:Circuit Breakers: One Vacuum (VCB)/Air Circuit Breaker (ACB) with motorized mechanisms, Minimum 25 Pieces of 4-Pole Air Circuit Breakers (ACB), Draw-out type.Mechanism: Motorized spring-charged with shunt trip and under-voltage release.Protection: Integrated microprocessor trip units with LSIG (Long-time, Short-time, Instantaneous, Ground fault) functionality.Safety: Internal arc classification and mechanical interlocks to prevent breaker movement while in the "ON" position.SPD: Integrated Class I+II (Type 1+2) Surge Protective Devices located after the main VCB/ACB.Feeder Recommendations:Main Transformer Outgoing: 6,300 A Air Circuit Breaker (ACB).Solar Inverters (15 units): 250 A MCCB or ACB.BESS Modules (10 units): 180 A MCCB or ACB.Auxiliary Transformer: 63 A MCCB.As per Standard Specification after Calculations:Rating: 0.8 kV, 6300A, 50Hz, IP55.Busbars: Tinned high-conductivity copper, rated for 6300A (50kA) continuous.Circuit Breakers: Low-Voltage Air Circuit Breaker (ACB), 4 or 3-Pole, withdrawable type, with motorized spring-charging mechanism with shunt trip and under-voltage release, rated continuous current: 1 × 6300A + 1 × 1000A.Minimum 15 Pieces of 4-Pole, 300A Circuit Breakers, 25kA (MCCBs).Minimum 10 Pieces of 4-Pole, 200A Circuit Breakers, 25kA (MCCBs).Multifunction Meter: Digital device that measures, monitors, and displays multiple electrical parameters, such as voltage, current, power, energy, and frequency.Safety: Internal arc classification and mechanical interlocks to prevent breaker movement while in the "ON" position.SPD: Integrated Class I+II (Type 1+2) Surge Protective Devices located after the main ACB.Notes:VCB only at MV.In the current network configuration, there is no problem in terms of short-circuit current. However, in the future, if they connect this system with the Public Grid, the short-circuit current will increase to (Isc): 84.2 kA at (0.8 kV & Z% = 6%) main busbar.Request for Clarification:Please provide the exact technical specifications required for each type of circuit breaker and the requirements necessary to ensure proper system protection.Response: The technical specifications required for each type of circuit breaker and the requirements necessary to ensure proper system protection is reflected in the Electrical BoQ Item No. 5.2 "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis" which has been revised to match Single Line Diagram (SLD) drawing E1-08 and as follows:a. Incoming Circuit Breakers: (15 x 400 A, 4-pole MCCBs) and (10 x 250 A, 4-pole MCCBs)b. Outgoing Circuit Breakers: (1 x 6300 A ACB) and (1 x 63 A MCCB)
Edited on:
15-Nov-2026 22:26
Edited by:
webservice@unops.org
New clarification added: Clarification# 30: Regarding Item No. 12 – Smart Metering System, we would like to seek your clarification on the communication technology.The tender specifications mention LoRa and PLC communication options. However, we would like to propose LoRaWAN, which offers an alternative communication solution with advantages in scalability, network management, and long-range connectivity.Could you please confirm whether we should submit our proposal strictly based on the communication options specified in the tender documents (LoRa or PLC), or whether UNOPS would accept an alternative proposal based on LoRaWAN, subject to meeting or exceeding the required technical specifications?Response: LoRa refers to the physical Radio Frequency (RF) modulation technology; therefore, LoRaWAN is not considered an alternative communication technology but rather a network protocol operating over the LoRa physical layer.Accordingly, the proposed LoRaWAN solution may be considered under the RF communication option specified in the tender documents. Bidders shall ensure full compliance with the applicable technical requirements and the provisions of the Electrical BoQ, particularly Items 12.1.1.1, 12.1.1.2, and 12.1.1.3, which specify PLC/RF communication options.Clarification# 31: Part one Following our review of the tender documents, drawings, BOQ, and technical specifications we kindly request clarification on the following technical points:1. HV Lithium Battery Energy Storage Unit (BESS)As per Tender Drawing – Annex 5:· Chemistry: LFP (Lithium Iron Phosphate) preferred.· Total Nominal Energy: Minimum (10 × 373 kWh = 3.73 MWh).· Nominal system voltage: Compatible with inverter HV battery range.· Built-in rack BMS with cell monitoring (V, T), balancing, alarms, and communication to master BMS.· Cycle life: ≥ 6,000 cycles @ 80% DoD (or better) with third-party report.· Operating temperature: -10°C to +50°C (with derating policy), storage -20°C to +55°C.· Safety: UL9540/IEC 62619 (or equivalent), integrated fuses/contactors, insulation monitoring.· Warranty: ≥ 10 years.· Includes racks, internal busbars, power and communication cables, and all accessories.As per Tender BOQ – Annex 4:The same requirements are specified, except:· Total Nominal Energy: Minimum 3.8 MWh.Request for Clarification:Please clarify the required minimum total nominal energy capacity: 3.73 MWh or 3.8 MWh.Response: The nominal energy capacity is 3.8 MWh as per the revised BoQ and drawings "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis and REV 1 - Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing No. E1-09."Clarification# 32: 2. Power Conversion System (PCS)As per Tender Drawing – Annex 5:· Bi-directional (10 × 190 kW) inverters system with native microgrid intelligence.· Grid-Forming (GFM / Virtual Synchronous Machine) Mode (Primary Mode): Serves as the primary voltage and frequency reference (800 V, 50 Hz) for the isolated mini-grid when operating without diesel generators.· Grid-Following (GFL) & Dynamic Droop Mode (Parallel/Charging State): When one or both 1,250 kVA diesel generators are running and master the 11 kV/0.8 kV bus, the PCS seamlessly switches or operates in dynamic P-f/Q-U droop mode to share real and reactive load or absorb surplus solar energy.· Controlled Soft-Start & Transformer Energization: Capable of black-starting the local 7 MVA (0.8/11 kV) step-up transformer and 11 kV OHL feeder from a de-energized state.· Voltage Ramp Control: Soft-ramps output AC voltage from 0 V to 800 V over a configurable window (1–10 seconds) to eliminate transformer magnetizing inrush currents and prevent over-current trips.· Hardware Reverse Power Protection: Coordinates with MGC control logic to enforce active power flow limits at the 0.8 kV switchgear, preventing unauthorized reverse power flow into running diesel generator sets (protecting directional power relays, ANSI 32).· Reverse Power Inhibition: Prevents exporting power to the 11 kV bus when the Diesel Generator is the sole grid-forming source.· SPD: Integrated Class I+II (Type 1+2) Surge Protective Devices located after the main ACB.As per Tender BOQ – Annex 4:· Bi-directional 1.9 MW inverter system with native microgrid intelligence.· The remaining operating mode and protection requirements are specified as described above.As per Annex 2 – Section 4.3:The Power Conversion System (PCS) shall be a bi-directional, utility-grade 1.9 MW, 800 VAC inverter system with native grid-forming (GFM) and grid-following (GFL) control modes, optimized for seamless transition and parallel operation with synchronous diesel generators.Additional requirements include:· Virtual Synchronous Machine (VSM) algorithms with programmable virtual inertia (H = 1.0–5.0 s) and synthetic damping.· Overload capability: ≥ 110% continuous for 10 minutes, and ≥ 150% for 10 seconds.· Grid-Following (GFL) and Dynamic Droop Mode when one or both 1,250 kVA diesel generators are running and mastering the 11 kV/0.8 kV bus.· Controlled soft-start and transformer energization, including black-start capability for the local 7 MVA (0.8/11 kV) step-up transformer and 11 kV OHL feeder.· Voltage ramp control from 0 V to 800 V over a configurable window of 1–10 seconds.· Hardware reverse power protection coordinating with MGC control logic to prevent unauthorized reverse power flow into running diesel generator sets (ANSI 32).Note:It is preferable to write in the BOQ:"Bi-directional (10 Units × 190 kW) inverters system with native microgrid intelligence."Request for Clarification:- Please clarify and confirm the required PCS configuration- Whether the BOQ should specify 10 units × 190 kW instead of only stating 1.9 MW.Response: - The PCS must be Grid Forming operation.- The requirement in BoQ specifies 10 units x 190 kW PCS and bidders must follow this requirement.
Edited on:
15-Nov-2026 22:23
Edited by:
webservice@unops.org
New clarification added: Clarification# 22: 10. Transformer winding material and voltage ratio wordingWith reference to the following items of tender documents:-• Electrical BoQ 5.1 / Tech Questionnaire 5.1: “Winding Material: High-grade electrolytic copper…” (repeated); Voltage Ratio stated as “11 kV (MV) / 0.8 kV (LV)” while plant LV bus is 0.8 kV stepping up to 11 kV.• No aluminium-winding option appears in the Questionnaire (copper mandatory), which is clear; ambiguity is mainly LV/MV order and CMR 7.0 MVA vs plant inverter AC ≈4.5 MVA + PCS 1.9 MW.Clarification question: Please confirm that- Copper windings are mandatory (aluminum not accepted),- That the transformer is 0.8/11 kV Dyn11 7.0 MVA CMR and whether the 7 MVA rating (vs ~6.4 MVA connected generation) is intentional for future expansion.Response: - The transforemer winding must be copper and aluminium is not accepted.- The 7 MVA can be raised with maximum flexcibilty of 30% extra to meet site conditions as amended in specifications in the documents:REV 1 -1 Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitisREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableREV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 23: 11. String inverter GFM requirement vs BESS as GFM masterWith reference to the following items of tender documents:-• Tech Questionnaire / BOQ. 2.1: string inverters require “Grid-forming capability: voltage/frequency regulation, black start, droop control” AND hybrid interoperability as high-speed slave under BESS GFM master.• BESS PCS (3.2): primary GFM / VSM at 800 V, 50 Hz when operating without diesel.Clarification question: Please clarify whether string inverters must themselves provide native GFM/black-start capability, or whether GFL operation as slaves to the BESS GFM PCS (and/or diesel) fully satisfies the technical criteria.Response: String inverters must be Grid Following operation as slaves to the BESS Grid Forming PCS or Diesel generators.Clarificartion# 24: 12. Missing / mis-numbered BOQ spare items and cleaning-robot sparesWith reference to the following items of tender documents:-• Electrical BOQ. spares jump from 23.2 (inverter spares) to 24.3 (transformer spares); items 24.1 / 24.2 appear missing (numbering).• Robots: main item 22.1 = 105 pcs; spare set 24.9.1 = 10 Sets — Which unit of measuring to be considered and what’s different?.• CCTV items 19.2 / 19.3 titles are “8MP” while description are “6MP”.Clarification question: Please issue a corrected BOQ spare-parts schedule (restoring any missing lines if any), and confirm the req. CCTVResponse: (a) The BoQ has been revised to correct the typographical error in the item numbering.(b) Additionally, Item 23.9.1 represents the spare parts associated with the main item 22.1.(c) CCTV items 19.2 and 19.3 have been revised accordingly. The required camera specification is 8 MP resolution.The amendment is under REV 1 -1 Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitisClarification# 25: 13. Kindly include the quantities of the stone Retaining wall as per drawing D-11- Annex 5CResponse: Please note that is is included in the BoQ "REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis item" under the Civil Work BoQ items# 1.4.2.2 and 1.4.2.3.Clarification# 26: 14. Please Specify and describe the responsibility and works / items to be done by beneficiary (end user) during implementation period of the project .Response: As per the UNOPS contract , the end user responsibility is to volunteerly facilitate the work of the contractor. Any requirements should be requested, it must be through the UNOPS assigned engineer.Clarification# 27: we kindly ask you to provide the actual load information of the existing Hasswain Mini-Grid, including:- Actual daily load profile (preferably at 15-minute intervals).- Maximum and average load demand (kW/kVA).- Daily energy consumption (kWh).- Daytime and nighttime load demand.to assess the mini-grid load requirements and evaluate the capability of the proposed BESS system to support the network.Response: The requested information is not relevant to the contractor's scope of work, as the contractor is not responsible for designing or determining the load requirements.The contractor's obligation is to execute and deliver the works strictly in accordance with the scope, specifications, and technical requirements set out in the tender documents. Accordingly, the requested load information does not constitute a basis for modifying or deviating from the specified contractual requirements.Clarification# 28: We kindly request clarification on the following items regarding the Load Information:- Peak load power (kW): Could you please clarify this requirement?- Percentage of inductive load (%): Could you please clarify this requirement?- Inductive load list: Could you please clarify this requirement?- Average load power (kW): Could you please clarify this requirement?- Load duration hour (h): Could you please clarify this requirement?- Motor type and Qty if applicable: Could you please clarify this requirement?Response: The requested information is not relevant to the contractor's scope of work, as the contractor is not responsible for designing or determining the load requirements.The contractor's obligation is to execute and deliver the works strictly in accordance with the scope, specifications, and technical requirements set out in the tender documents. Accordingly, the requested load information does not constitute a basis for modifying or deviating from the specified contractual requirements.Clarification# 29: We kindly request a 7-day extension of the bid submission deadline, until 29 November 2026.This additional time is needed to finalize supplier quotations and complete the technical proposalResponse: Please be advised that the submission deadline has been extended to 29-November-2026 @ 09:00 AM. Kindly ensure preparing your submissions ahead of this date to avoid any last minute submissions.
Edited on:
15-Nov-2026 22:22
Edited by:
webservice@unops.org
New clarification added: Clarification# 18: 6. BESS energyWith reference to the following items of tender documents:-• Annex 5B drawing E1-09 (SCADA Interface Schematic): 10 BESS units (BESS 01 … BESS 10) of about 373 kWh each ≈ 3.73 MWh total.• Annex 5B drawing E1-08 (Overall SLD): 10 PCS units PCS(1)…PCS(10) of 190 kW, 800 V (= 1.9 MW).• Electrical BOQ item 3.1 / Tech Questionnaire 3.1: nominal energy ≥3.8 MWh DC BOL.• No Annex 5B drawing states the number of BESS containers; E1-02 notes refer to a single “BESS Container” (weather station mounting), while BOQ 3.2 says “2x 20HQ” / “ISO 40HQ”.Clarification question: Please confirm(a) the minimum BESS energy (≥3.8 MWh DC BOL per BOQ, or 10 × 373 kWh ≈ 3.73 MWh per drawing E1-09), and whether it is nominal or usable;(b) whether the 10-unit / 10 × 190 kW PCS topology on E1-08/E1-09 is mandatory or indicative;(c) the required number and size of BESS containers, which no drawing shows.Response: (a) The BESS nominal energy capacity is 3.8 MWh as specified in REV 1 – Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing No. E1-09.(b) The relevant drawing has been revised accordingly under REV 1 – Annex 5-B: Electrical Drawings – Husswain Mini-Grid Power Station, Drawing No. E1-09.(c) The BESS installation comprises one container only. Therefore, there is no need to separately indicate the number of containers on the drawings, as this requirement is already clearly specified in the BoQ, technical questionnaires, and civil works.Clarification# 19: 7. BESS chemistry – LFP mandatory vs “preferred”With reference to the following items of tender documents:-• Technical Questionnaire / Comparative Data Table item 3.1: “Chemistry: Lithium Iron Phosphate (LFP), new and unused cells.”• Annex 1 Scope of Work Page 23 : “3.8 MWh Lithium Iron Phosphate (LiFePO4) BESS”.• Electrical BOQ item 3.3: “Chemistry: LFP (Lithium Iron Phosphate) preferred.”Clarification question: Please confirm whether LFP chemistry is mandatory (pass/fail) or only preferred, and whether any non-LFP chemistry would be accepted.Response: The required battery type is Lithium Iron Phosphate any other type is not accepted. all realted documents are revised. (REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis, REV 1- Annex 6 - Technical specifications for Goods and Comparative Data Table and REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications)Clarification# 20: 8. String inverter peak / rated powerWith reference to the following items of tender documents:-• Electrical BOQ item 2.1: “min Max. output power 330 (kW), Rated power 300 (kW)” and “parallel operation of 8 units”; quantity = 15 pcs.• Technical Questionnaire item 2: “Rated output power not less than 300 kW”; “Parallel operation of at least 8 units” — no explicit 330 kW peak requirement.• Annex 1 Scope of Work Page 23: “Fifteen (15) 300 kW” inverters; “each inverter manages exactly 21 strings.”• Drawing D-02 (DC Wiring SLD): “INVERTER RATING: 300 kW”; “TOTAL NOS. OF MPPT'S PER INVERTER: 15”; shows 21 strings per inverter.• Annex 5B drawings E1-03 (Inverters and String Zones), E1-04 (PV Array Layout & String Configuration) and E1-08 (Overall SLD: 15 × 300 kW inverters, “21 STRING / 24 PV per String Inverter, 504 MODULES”) , not state any MPPT count; the 15-MPPT figure appears only on Annex 5C typical drawing D-02.• Annex 5C drawing D-02 (DC Wiring SLD), notes 1–4: PV module 720 W; inverter 300 kW; 24 modules in series per string; “TOTAL NOS. OF MPPT'S PER INVERTER: 15”; 21 strings per inverter (String-1…String-21) — i.e. 15 MPPT confirmed on D-02, vs ≥6 MPPT minimum in Questionnaire/BOQ 2.1.Clarification question: Please confirm(a) whether a 330 kW maximum/peak output is mandatory in addition to 300 kW rated;(b) whether all 15 inverters must be capable of paralleling together (or only ≥8);(c) whether ≥6 MPPTs (questionnaire/BoQ) or 15 MPPTs (Annex 5C drawing D-02; not stated on Annex 5B E1-03/E1-04/E1-08) is the binding requirement.Response: (a) The string inverter specifications have been amended to read: "the maximum output power is 330 kW, while the rated output power is 300 kW" in the documents REV 1 - Annex 6 - Technical specifications for Goods and Comparative Data Table and REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications and Item 2.1 in REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis has been revised accordingly.(b) The string inverters shall be equipped with parallel operation capability, as required by the technical specifications. However, the actual paralleling connection and associated works are excluded from the current scope of work.(c) REV 1- Annex 5C - Typical Drawing - D-02- DC Wiring Single Line Diagram has been revised to reflect ≥6 MPPTs.Clarification# 21: 9. BESS usable energy / DoD / C-rate / EMS SoC windowWith reference to the following items of tender documents:-• Tech Questionnaire 3.1 / BOQ. 3.3: Nominal ≥3.8 MWh DC BOL; “usable energy at ≥90% DoD shall be declared”; cycle life ≥6,000 @ 80% DoD.• EMS (BOQ 3.6 / Questionnaire 3.4): nighttime discharge to 20% SoC; daytime charge to 90% SoC (70% usable window in operation).• PCS ≥1.9 MW with 3.8 MWh implies ~0.5C / ~2-hour duration, but no explicit C-rate or discharge-duration guarantee is stated as a pass/fail criterion.Clarification question: Please confirm- The guaranteed usable energy (MWh) and DoD basis for acceptance testing,- Whether EMS SoC limits (20–90%) override the ≥90% DoD declaration,- Whether any minimum discharge duration or C-rate is req.Response: - The BESS shall have a guaranteed nominal energy capacity of 3.8 MWh with a minimum Depth of Discharge (DoD) of 90%.- The EMS State of Charge (SoC) operating limits (20–90%) are defined by the control philosophy and do not supersede or modify the specified DoD requirement.- The BESS technical specifications explicitly emphasize the requirement for a C-rated battery.
Edited on:
15-Nov-2026 22:18
Edited by:
webservice@unops.org
New clarification added: Clarification# 15: 3. Diesel generators – 6 sets on drawing E1-08 vs 2×1250 kVA in BOQ linesWith reference to the following items of tender documents:-• Annex 5B drawing E1-08 (Overall Single Line Diagram), “HUSWAIN GENERATION STATION” / existing generation station block: 6 Cummins canopy diesel sets, 0.415 V 50 Hz – 2 × 1000 kVA + 4 × 1250 kVA (≈7,000 kVA total), all six labelled “GENERATOR-1”, with three 3 MVA Dyn11 step-up transformers.• Electrical BOQ items of BESS/PCS/EMS repeatedly requiring coordination with “one or both 1250 kVA diesel generators”, reverse-power ANSI 32, wet-stacking protection, and OPGW start signal to powerhouse 400 V breakers (i.e. 2 × 1250 kVA).• Annex 5B drawing E1-09 (SCADA Interface Schematic) also shows generator/MGC interface.• Annex 1 Scope of work – Page 24- MGC: coordinate “backup Diesel Generator”.• No diesel generator supply/install or interface items shown in the Husswain Electrical or Civil BOQ.Clarification question: Please confirm :(a) the number and rating of diesel generators the MGC/EMS must coordinate with (6 sets of 2×1000 + 4×1250 kVA per drawing E1-08, or 2×1250 kVA per cite in Electrical BOQ), and correct the meaning of “GENERATOR-1” in drawing of all generators; (b) Are all generators, their 0.415 kV switchgear and the 3 MVA step-up transformers are existing / Employer furnished;& (c) Kindly specify the Contractor’s exact interface scope to be quoted (point of connection, protection relays (ANSI 32 etc.), control/start signals, OPGW termination & Cables at the powerhouse, and any retrofit of existing generator controllers).Response: a- The Micro-Grid Controller (MGC)/Energy Management System (EMS) shall coordinate the operation of two existing diesel generators, each rated at 1,250 kVA (2 × 1,250 kVA), located in the existing power house. Refer to Clause 5, Micro-Grid Controller (MGC) & Energy Management System (EMS), of the document named "REV 1- Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications".b- All generation units, step-up transformers, and 11 kV RMUs indicated in the Single-Line Diagram (SLD) are existing equipment installed in the respective power houses.c- The communication requirements, network architecture, and interface configurations are comprehensively detailed in Clause 5.1, Communication System & Network Topology, of the document named "REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications"Clarification# 16: 4. PV plant ,size of mounting steel structureWith reference to the following items of tender documents:-• Annex 1 Scope of Work Page 24: Lightning Protection: ESE system “covering the 1,728-module field and BESS containers”. 1,728 modules would be only ≈1.24 MWp at 720 Wp — inconsistent with 5.44 MWp plant sizing required.• Annex 5D drawing S-11 (Solar Panels Distribution Plan- Mayfa city ?): the dimensions of each steel structure of each solar panels group (2x36=72 solar panels) are 9X5.4 m – 48.6 m length by 4.25 m width• Annex 5A drawing A-6 (Architecture Plan): Site area ≈ 277.3 × 256.8 m; shown dimensions ≈ 47.5 m long at 4.8 m width with 4.0 m spacing (vs 48.6 m x 4.25m on S-11).Clarification question:- Kindly confirm which length is correct 47.5 m or 48.6 m- The drawings of Annex 5D of Mayfa is valid to be used for Husswain area ?- Is the overall dimension of site will not effect due that confliction of length of each steel structure of each solar panels group- Clarify about the “1,728-module” and “36 PV Modules” references if erroneous.Response: - The typical drawings shows the maximum spacing that can be used between the solar panels to have the overall maximum width for the group that can be used in this typical to give maximum 48.6m. The width of solar are based on the offer and the total width of group will be based on the selected PVs type. The minimum spacing is 15-20mm- Yes, the drawing of Annex 5D is valid to be used for Husswain area.- The general drawings shows the overall dimensions using the minimum spacing of 19mm.- As per the contract scope and the contractual terms, the contractor is required to prepare shopdrawings prior the start of work and submit for approval and this will be based on the contractor PV offered brand.Clarification# 17: 5. BESS container size – 2×20HQ vs ISO 40HQ vs 6.06×2.4 m foundationsWith reference to the following items of tender documents:-• Electrical BOQ. item 3.2 title: “2x 20HQ container modified for BESS…”.• Same item 3.2 minimum requirements: “ISO 40HQ container, CSC plate…”.• Item 3.1 / 3.15: “all in one or two” containers.• Annex 1 Scope of Work Page 12: container foundations “(6.06 × 2.4 m containers for BESS)” (=20 ft footprint), not 40 ft.• Annex 5C drawing D-09 / CF-1 (Foundation of the Steel Container): one ring footing CF1 0.60 m × 0.30 m around a 6.7 × 3.0 m plan, i.e. a 20 ft footprint; no quantity stated.• Civil BOQ 2.0 Containers Foundations: the quantities — which equals roughly ONE Container Foundation CF1 as per drawing D-09, while the plant needs BESS (2 × 20HQ or 1 × 40HQ), LV switchgear container and RMU containers , therefore quantities are not enough.Clarification question:- Please clarify the mandatory BESS enclosure configuration (number of containers and 20HQ vs 40HQ)- Confirm how many container foundations (D-09 CF1, 6.7 × 3.0 m) are to be built and measured for BESS, LV switchgear and RMU containers with updating quantities of Civil BOQ , since Civil BOQ 2.0 quantities (RC 3 m³) cover only about one foundation; if 40HQ is required, please issue the corresponding foundation drawing.Response: - The required BESS container is 20HQ and all realted documents has been revised."REV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantitis, Electrical Work BoQ Item No. 3.2 "- Yes, we confirm that all foundations shall be constructed for the BESS, LV switchgear, and transformer (excluding the RMU), as specified in the Civil Work BoQ. The quantities shall be based on the requirements for two (2) 20-foot HQ containers.
Edited on:
15-Nov-2026 22:16
Edited by:
webservice@unops.org
New clarification added: Clarification# 10: Item 3.8: The tender specifications specify a water/glycol cooling system for the Battery Energy Storage System (BESS).Question? Would UNOPS accept an alternative, advanced technology such as an immersion liquid cooling system?Response: No alternative cooling system shall be accepted under any circumstances. The bidder must comply with the specified cooling system requirements as per technical specifications.Clarification# 11: Is it acceptable for the lead company to take on less than 50% of the project responsibilities?Response: There is no limit on the percentage of the JV membership. JV members should fill the returnable form schedule 0.3 Joint Venture Partner Information and according to the instructions.Clarification# 12: I have joined the pre-bid meeting but had unstable internet connection, will the meeting link be shared and the Q&A with us?Response: The pre-bi meeting minutes have been shared under amendment# 2. Please go to the "Documents" section and you will find the document named "Minutes for Pre-bid Meeting RFQ-2026-65288" for your reference.Clarification# 13: 1. (11) kV OHL scope missing from BOQ (conductors, poles) vs Scope / OPGW-only in BOQWith reference to the following items of tender documents:-• Annex 2 Scope of Work - Item NO. (7) Regarding 11KV Overhead Lines: requires 11 kV OHL with conductors size 150 mm² (e.g. ACSR “Wolf”), 11 m treated poles/structures, C5-M cross-arms, insulators, and 12 kV gapless surge arresters.• Electrical BOQ item 6.0/6.1: only “Optical Ground Wire (OPGW)… Minimum 24 fibers… Qty 3.0 km” —items for ACSR phase conductors, poles, cross-arms, insulators, or surge arresters for the OHL are not mentioned or required for quotation ??• Annex 1 Scope of Work Scope of works – Page 33 regarding: 11kV overhead Line Pre-Commissioning and Commissioning• Electrical BOQ Item No. 24.6 list OHL insulator/arrester/hardware spares Parts , implying an OHL exists, but main OHL construction items are not included in BOQ.Clarification question: Please confirm whether the 11 kV overhead line (poles, 150 mm² ACSR phase conductors, hardware and arresters) is part of this Tender ? and, if so, Please provide BOQ line items and quantities; or confirm that only 3 km of OPGW (shield wire/comms) is required and phase conductors/poles are Employer (End User) -furnished / out of scope.Response: The overhead transmission line (OHL) installation activities are not part of the contractor’s scope of work and shall be carried out by the relevant authorities in Al-Mahrah Public Electricity Corporation (PEC).The contractor’s responsibilities are limited to the supply of the complete Optical Ground Wire (OPGW) fiber-optic conductor, supervision of its installation by PEC, and subsequent testing and commissioning.Accordingly, the scope of work has been revised to clearly distinguish the contractor’s responsibilities from PEC’s installation responsibilities, ensuring a clear definition of the contractual division of responsibilities and avoiding any potential ambiguity during implementation. "REV 1 - Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station"Clarification# 14: 2. (11) kV OHL phase conductor type – AAAC (E1-08) vs ACSR (Scope)With reference to the following items of tender documents:-• Annex 5B drawing E1-08 (Overall Single Line Diagram): “11kV OHL - AAAC (150 mm²)” between the plant RMU and the existing generation station.• Annex 2 Scope of Work - Item NO. (7.3) Regarding 11KV Overhead Lines: “Conductors size 150mm2 (e.g., ACSR “Wolf””)”.• Neither conductor mentioned the quantities in BOQ .Clarification question: Please confirm 11 kV OHL phase-conductor type and size (AAAC 150 mm² per drawing E108 or ACSR 150 mm² “) and is in Scope of works or not , also, illustrate the route length, and the applicable standard (IEC 61089 / EN 50182), so that conductor, fittings and OPGW sag-tension coordination can be priced consistently.Response: The overhead transmission line (OHL) installation activities are not part of the contractor’s scope of work and shall be carried out by the relevant authorities in Al-Mahrah Public Electricity Corporation (PEC).The contractor’s responsibilities are limited to the supply of the complete Optical Ground Wire (OPGW) fiber-optic conductor, supervision of its installation by PEC, and subsequent testing and commissioning.Accordingly, the scope of work has been revised to clearly distinguish the contractor’s responsibilities from PEC’s installation responsibilities, ensuring a clear definition of the contractual division of responsibilities and avoiding any potential ambiguity during implementation. "REV 1 - Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station"
Edited on:
15-Nov-2026 21:24
Edited by:
webservice@unops.org
New clarification added: Clarification# 6: Can you clarify:- The requirements related to Joint Venture submissions between a local and an International company? Does the International Company need to be registered in the UNGM or is the registration of the local company is sufficient to be eligible?- Previous Experience Requirements: If one of the companies (the international company for example) meets the requirements in the same field, is it enough to have this as a JV or does both companies require to have independent previous similar experience to meet this criteria?Response: Please note: - The eligibility crteria states: The bidder is eligible as defined in Section I: Instructions to Bidders, Article 4 [Bidder Eligibility].In case of Joint Venture (JV) each joint venture member must meet the requirement. To establish this criteria by a bidder and his JV partner, they both need to be registered in the UNGM as suppliers and cleared from the UNGM ineligibility lists.- The previous experience criteria states: In case of Joint Venture (JV), all joint venture members combined must meet it. Thus, this criteria can be fulfilled either by merging the previous experiences of both the bidder and the JV partner or if one partner can provide all the required project experience.Clarification# 7: With reference to Annex 4 – Bill of Quantities, Item 12.1.1.3 (Customer Interface Unit – CIU), and the related requirements under Annex 2 – Electrical Technical Specifications, we kindly request clarification regarding the required quantity and configuration of the CIU system.The Bill of Quantities indicates the CIU quantity as “1 System”, while the project includes a total of 2,200 smart meters (2,100 single-phase and 100 three-phase).In this regard, we would appreciate UNOPS's clarification on the following:a. Is one CIU required for each individual customer meter, meaning a total of 2,200 CIUs, or is the requirement for one centralized/shared CIU system serving all customers?b. If individual CIUs are required, should each CIU be supplied as a separate unit and paired with its corresponding smart meter?c. If a centralized or alternative configuration is intended, kindly provide the expected system architecture and the required quantity of CIUs.d. Please confirm whether the CIU communication interface with the corresponding smart meter may utilize either RF or PLC communication, as indicated in the relevant BOQ requirements.Response: (a, b and c) Dedicated 1-to-1 Deployment (No Centralized Architecture): The CIU will be a separate physical unit for each individual customer meter, covering all 2,200 meters (2,100 single-phase and 100 three-phase). No centralized or shared CIU architecture will be used. Because the meters utilize a split-meter configuration (with the measuring unit installed externally on poles or boundary enclosures), every consumer premise requires its own dedicated indoor CIU keypad for token entry and monitoring. The BoQ line item listing "12.1.1.3" represents the overall metering package header and requires pricing for 2,200 individual CIU units.Programming, Binding, & Configuration: A dedicated CIU will be specified for each meter. Each CIU must be either pre-programmed at the factory or programmed/paired on-site to establish a secure, 1-to-1 logical binding with its assigned split meter before commissioning.(d) Communication Interface (PLC Primary with RF Option):Local communication between the indoor CIU and the outdoor smart meter shall be primarily via Power Line Communication (PLC), with the availability of an RF (Radio Frequency) option to accommodate varying site conditions, structural wall barriers, or localized electrical noise across the distribution grid.System Security & Authentication: The system must implement robust security and authentication protocols across the entire metering loop.All 20-digit STS (Standard Transfer Specification) tokens generated by the cloud platform (or local failover server) must be cryptographically secured using a Hardware Security Module (HSM) or equivalent software module. Mutual authentication between the CIU and its paired meter ensures that token transmission is protected against tampering, interception, or cross-meter credit transfer attempts.Clarification# 8: With reference to RFQ-2026-65288 – Provision of a Mini-Grid Solar Power Plant System for Husswain, Al-Mahrah Governorate, Republic of Yemen.During our technical review, we identified a number of differences and inconsistencies between the documents that require clarification to ensure that our proposed solution fully complies with UNOPS requirements.We would appreciate your clarification on the following points:1. BESS Energy Capacity – Nominal DC Capacity vs. Usable AC CapacityThe tender documents specify the BESS energy capacity differently:• Annex 2 requires a minimum usable energy capacity of 3.8 MWh AC-side at End of Life (EOL).• Annex 6, Item 3.1, specifies a minimum nominal energy capacity of 3.8 MWh DC at Beginning of Life (BOL), with usable energy at 90% DoD to be declared.• The updated electrical drawings (Annex 5B, Drawing E1-08) indicate 10 battery units, each rated at approximately 373 kWh, resulting in a total nominal capacity of approximately 3.73 MWh.Could you please confirm the governing BESS capacity requirement and clarify whether the minimum required capacity is 3.8 MWh usable AC-side at EOL, or 3.8 MWh nominal DC at BOL?Response: 1- BESS capacity requirement is 3.8 MWh nominal capacity. As revised in REV 1- Annex 2 - Electrical - Husswain Mini-Grid Technical SpecificationsClarification# 9: 2. BESS Cycle Life and Remaining Capacity at EOLWe also noted a difference in the required battery capacity retention:- Annex 2 specifies a minimum cycle life of 6,000 cycles at 80% DoD, with the remaining capacity at EOL specified as 70%.- Annex 6, Item 3.1, specifies at least 6,000 cycles at 80% DoD, with at least 80% remaining capacity under the specified test conditions, or equivalent warranted lifetime energy throughput.Please confirm the applicable minimum remaining capacity requirement at EOL and whether the 70% or 80% capacity retention requirement shall govern.Response: Please refer to the amended documents "REV 1 - Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications" and 80% capacity is required
Edited on:
15-Nov-2026 21:18
Edited by:
webservice@unops.org
New amendment added #2: Dear Bidders,This purpose of this amendment is to:Add the prebid meeting minutes to the eSourcing document tab The document RFQ-2026-65288- Solicitation, Sections II, III, IV, V is amended toExtend the implementation period from 5 months to 8 months as highlighted in yellow.The document Annex 1 - Scope of Work Husswain Mini-Grid Solar Power Station is amended toExclude the 11 kV OHL from the contractor’s scope of workThe document Annex 2 - Electrical - Husswain Mini-Grid Technical Specifications is amended toUpdate the battery capacity in page# 13: Section 4: Part 4.1: System overview and rating (BESS Capacity) as highlighted in yellow.Update the busbar rating in page# 27: Section 6.3: 0.8 kV LV Switchgear Specification as highlighted in yellow.The document Annex 4 - Husswain Mini-Grid Solar Power Station Bill of Quantities is amended toUpdate the technical specifications for items# 2.1 - 3.2 - 3.3 - 5.1 - 5.2 - 6.1 - 7.4 - 8.2.1 - 10.1 - 11.1 - 19.2 - 19.3 as highlighted in orange.Correct the numbering from items# 23.3 to 23.10 as highlighted in orange.The document Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station is amended to Update the drawing in sheets# E1-8 and E1-9.The document Annex 5C- Typical Drawings - D-02-DC Wiring Single Line Diagram is amended toUpdate the number of MPPTs from 15 to >/= 6.The document Annex 6 - Technical specifications for Goods and Comparative Data Table is amended toUpdate the technical specifications for items# 3.1 - 5.1 - 5.2 as highlighted in orange.eSourcing general tab is amended as followExtending the submission deadline from 22 November 2026 @ 10:00 AM to 29 November 2026 @ 10:00 AMExtending the clarifications deadline from 12 November 2026 @ 12:00 PM to 17 November 2026 @ 12:00 PMeSourcing particular is amended as follows Extending the expected contract award date from 22 December-2026 to 29 December-2026 (The contract award date is only anticipated and not binding)eSourcing Criteria tab under Technical Criteria section is amended as followsThe work plan criteria is extended from 5 months to 8 monthseSourcing Questionnaire tab is amended as followsQuestion 11 is amended according to the 8 months work plan.Therefore;eSourcing Document Tab is amended to add the following documents: Minutes for Pre-bid Meeting RFQ-2026-65288REV 1 - RFQ-2026-65288- Solicitation, Sections II, III, IV, VREV 1 - Annex 1 - Scope of Work Husswain Mini-Grid Solar Power StationREV 2 - Annex 1 - Electrical - Husswain Mini-Grid Technical SpecificationsREV 1 - Annex 4 - Husswain Mini-Grid Solar Power Station Bill of QuantitiesREV 1 - Annex 5B - Electrical Drawings - Husswain Mini-Grid Power StationREV 1 - Annex 5C- Typical Drawings - D-02-DC Wiring Single Line DiagramREV 1 - Annex 6 - Technical specifications for Goods and Comparative Data TableeSourcing General tab under description is updated to: Extending the submission deadline to read 29 November 2026 @ 10:00 AMExtending the clarifications deadline to read 17 November 2026 @ 12:00 PMeSourcing Particulars tab under scope of quotation is updated to:Extending the expected contract award date to read 29 December-2026 (The contract award date is only anticipated and not binding)eSourcing Criteria tab is amended to update the work plan criteria to 8 monthseSourcing Questionnaire tab Question 11 is amended to reflect the 8 months work planALL OTHER TERMS & CONDITIONS UNDER THIS TENDER REMAINS THE SAME ....
Edited on:
14-Nov-2026 10:00
Edited by:
webservice@unops.org
New clarification added: Happening now: The pre-bid meeting is held virtually now via the following link: (https://meet.google.com/fnj-zmfg-pbh). ALL interested suppliers are encouraged to attend the pre-bid meeting.
Edited on:
05-Nov-2026 09:05
Edited by:
webservice@unops.org
New clarification added: Clarification# 4: Please share the pre bid meeting link Response: Please note that the pre-bid meeting has been extended under amendment# 1 to read as below:The pre-bid meeting will be held on 05-November-2026 @11:00 am Sana'a, Yemen time virtually via the following link: (https://meet.google.com/fnj-zmfg-pbh).
Edited on:
01-Nov-2026 08:41
Edited by:
webservice@unops.org
New clarification added: Clarification# 5: Appendix 5B of the electrical drawings remains damaged as is, and no modifications have been made. Response: Ammendment# 1 has been published to replace the corrupted document named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station" with a correct version named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station - Updated". Kindly check the documents tab for the corrected document.
Edited on:
01-Nov-2026 08:38
Edited by:
webservice@unops.org
New amendment added #1: Dear Bidders,This purpose of this amendment is to:The document "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station" is corrupted and is replaced with the corrected version.eSourcing Particulars tab is amended as follows:Extending the pre-bid meeting date from 01 November 2026 @ 11:00 AM to 05 November 2026 @ 11:00 AMTherefore1. eSourcing Document Tab is amended to add the following documents: Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station - Updated2. eSourcing Particulars tab under description is updated to: Extending the pre-bid meeting date to read 05 November 2026 @ 11:00 AMALL OTHER TERMS & CONDITIONS UNDER THIS TENDER REMAINS THE SAME ....
Edited on:
01-Nov-2026 08:10
Edited by:
webservice@unops.org
New clarification added: Clarification# 1: We would like to inform you that the file "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station.pdf" appears to be corrupted and cannot be opened or viewed. We would appreciate it if you could kindly resend the file or provide an alternative download link at your earliest convenience to enable us to review the electrical drawings and proceed with our proposal preparation.Response: Ammendment# 1 has been published to replace the corrupted document named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station" with a correct version named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station - Updated". Kindly check the documents tab for the corrected document.Clarificaion# 2: Regarding the electrical drawing details, we would like to inform you that the electrical drawings for the mini-grid solar station are corrupted. Specifically, the words, legends, and figures appear distorted and have turned into random numbers and unreadable symbols/signs.Response: Ammendment# 1 has been published to replace the corrupted document named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station" with a correct version named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station - Updated". Kindly check the documents tab for the corrected document.Clarification# 3: With reference to the attached document “Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station.pdf,” we have noticed some typographical errors and unclear text in the drawings. We kindly request you to review the attached document and provide a corrected and clearer version, if applicable.Response: Ammendment# 1 has been published to replace the corrupted document named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station" with a correct version named "Annex 5B - Electrical Drawings - Husswain Mini-Grid Power Station - Updated". Kindly check the documents tab for the corrected document.
Edited on:
29-Oct-2026 09:57
Edited by:
webservice@unops.org