Design, Construction and Commissioning and related Works of the Philippine Coast Guard Vessel Support Facility Wharf, Buliluyan Port, Palawan, Philippines

UN Secretariat
Design, Construction and Commissioning and related Works of the Philippine Coast Guard Vessel Support Facility Wharf, Buliluyan Port, Palawan, Philippines Request for EOI

Reference: EOIUNOV24758
Beneficiary countries or territories: Philippines
Registration level: Basic
Published on: 02-Oct-2026
Deadline on: 18-Oct-2026 23:59 (GMT -4.00)
Description
The Procurement Unit (PU) of the United Nations Office at Vienna (UNOV), representing the United Nations Office on Drugs and Crime (UNODC), is inviting qualified vendors to submit their Expression of Interest (EoI) for Design, Construction and Comissioning of the wharf and related works at the Buliluyan Port, Palawan, Philippines. Key Points: • Purpose: This EoI is intended to identify qualified vendors interested in participating in the solicitation process. It is NOT a request for a bid or proposal. • Who Can Apply: Global Suppliers. • Scope: Construct a new wharf to provide additional operational support at the existing Local Government Unit (LGU), Local Government of Bataraza, facility at Buliluyan Port, Palawan, Philippines. • Submission Requirements: Interested vendors must complete and submit the attached Vendor Response Form, including their UNGM Vendor Registration Number. • Selection Process: UNOV/UNODC will review the EoIs to select vendors for the competitive bidding process. Submission of an EoI does not guarantee an invitation to bid. • UNOV/UNODC Rights: UNOV/UNODC reserves the right to modify or cancel any part of this requirement or Scope of Work (SOW) at any stage of the EoI or solicitation process, without liability to any respondent. UNOV/ UNODC does not guarantee any volume, quantity or value of works. Further details will be provided to vendors who express interest through the official tendering documents. Specific Requirements/Information The scope of works includes preparatory works; site establishment and management for construction of the pier, trestle and associated works; construction; and post-construction requirements. I. Preparatory works, including: • Topographic and hydrographic survey. • Geotechnical survey, report and design. • Design of the underground, underwater, wharf, access, trestle, appurtenances, electrical and other installations, not to exceed the contract value nor time-frame. • Alterations to the design to obtain the Environmental Compliance Certificate (ECC), which will be secured by consultants appointed by the UNODC, not to exceed the contract value nor time-frame. • Certification by the Designer of Record (DOR) that designs comply with Philippine legislation and regulations, contractual requirements and specifications. • Permitting and approvals. II. Site establishment and management for construction of the pier, trestle and associated works, including: • Mobilization, demobilization and cleaning. • Rental of temporary site office and residence. • Maintain temporary site office and residence. • Provide construction safety and health program. • Provide insurances, guarantees, warranties. • Provide construction management, contract management, reporting, quality assurance, environmental compliance, project and work schedule management to ensure the construction phase does not exceed the contract value nor time-frame. • Other. III. Construction of the pier, trestle and associated works, including: • Supply and deliver 610mm vibrated driven Precast Prestressed Concrete (PSC) piles. • Install 610 mm piles. • Chip/cut and dispose of piles. • Supply and place 5000psi concrete for pile cap. • Supply and place 5000psi concrete Light Pole Foundation. • Supply and place 5000psi concrete for deck (Includes thickened Slab at Fenders). • Supply and place 5000psi concrete for deck curb. • Supply and place reinforcement for above. • Supply and install hot-dipped galvanized 100mmx100mx10mm angle bar. • Supply and deliver rubber dock fender (1250 x 850) . • Install rubber dock fender. • Supply and deliver rubber dock fender 1.4 m width x 4 m Fender Panel. • Install rubber dock fender. • Supply and deliver 70T mooring bollard. • Install mooring bollard. • Supply and deliver 6-bolt dock cleat. • Install dock cleat. • Supply and Deliver Solar Powered Light Poles. • Install Solar Powered Light Pole. • Guardrail at trestle. IV. Post-construction, including: • Operation and maintenance documents. • Operation and maintenance training. • Environmental management training. • As-built drawings. • Certify compliance with Philippine legislation and regulations, contractual requirements and specifications. • Defect liability period.

Mrs. Akku Sansyzbayeva-Saha, Procurement Officer , UNOV/UNODC