New amendment added #2: Dear bidders;Following changes have been made to the tender. The deadline for submission has been extended to 8th June 2026.The deadline for clarification has been extended to 3rd June 2026.Regards,UNOPS
Edited on:
02-Jun-2026 09:08
Edited by:
webservice@unops.org
New amendment added #1: Dear bidders;Following changes have been made to the tender.eSourcing document tab:The minutes of the prebid meeting has been uploaded.Rev1, the BoQ for LOT 2 (Injil CHC) has been revised and uploaded.Rev1, the BoQ for LOT 4 (Sang-e-Kotal CHC) has been revised and uploaded.Please consider the changes in your bid submission.Regards,UNOPS
Edited on:
31-May-2026 22:13
Edited by:
webservice@unops.org
New clarification added: C#1:In LOT4 Annex 4_ BoQ Sang e Kotal.xlsx, Component 7: Solar Works, Items 7.01 and 7.02 refer to a total installed capacity of 35 kW, and Item 7.03 refers to 117 kWh battery backup. However, Item 7.05, PV Mount Roof Top Structure, refers to total installed capacity required of 55 kW. Kindly confirm whether the required PV mounting structure for Lot 4 should be designed and priced for 35 kW or 55 kW.R#1:It is confirmed that the total installation capacity for the PV modules is 35 kW. Additionally, the 117 kWh battery backup is confirmed. The PV mounting structure must be designed with the specific capacity to accommodate the number of PV units required to generate 35 kW. Please refer to annex 3 drawing number 4983-161 PV 4E17 00, 4983-161 PV 4E18 00, 4983-161 PV 4E19 00, 4983-161 PV 4E 20 00 and 4983-161 PV 4E 21 00.C#2:For waste disposal reference is made to “Municipality of Sinjar”. We believe this is a copy paste error since this project is in Herat not Iraq. Please confirm. (You may add this as a correction and not as our clarification question) R#2:This is a typo. The project location is Herat, Afghanistan.C#3:In the BOQs for Lots 1–4, Section 11, Item 11.01, Provision of Temporary/Rental Space for Healthcare Services, the item refers to temporary prefabricated 20-foot conex units and states that it is a Provisional Sum to be executed only upon written instruction, with payment based on approved actual quantities and agreed rates. Kindly confirm how bidders should price this item in the BOQ: should it be priced as a lump sum based on the minimum number of units stated for each lot, as a provisional allowance, or with a unit-rate breakdown for supply/transport/installation/monthly rental/maintenance/dismantling? Please also confirm the assumed rental duration, number or units and whether utilities, HVAC, internal partitions, furniture, water/sanitation connections, and security are to be included.R#3:Bidders shall quote "lump sum" for the item. Please for the details of the services in the same BoQ item for consideration of your price.C#4:The similar contract requirements stated requires completed construction or rehabilitation contract for a clinic, health facility, or hospital with value not less than USD 300,000 during 2021–2025. This is too specific with very high value in a small market like Afghanistan and would result in many capable companies to not qualify resulting in loss of quality and value for UNOPS. Can companies with complex construction experience (including plumbing, electrical etc…) other than clinics or health facilities apply? Please advise?R#4:The evaluation criteria for similar experience remains unchanged. The tender has been posted on an open competition basis and potential bidders are encouraged to submit bids.
Edited on:
26-May-2026 14:10
Edited by:
webservice@unops.org