Description
Tender description: Rehabilitation of Sioufi Garden, Lebanon
The Rehabilitation of Sioufi Garden Project has set sustainable objectives that encompass various aspects. The project aims to create a harmonious balance between environmental conservation, social inclusivity, and economic viability. By implementing sustainable practices and measures, the project seeks to minimize its ecological footprint and promote long-term environmental sustainability. It focuses on enhancing accessibility, ensuring that the garden is welcoming and easily accessible to individuals of all abilities. Safety and security are prioritized, guaranteeing a secure and enjoyable experience for visitors. Additionally, the project incorporates renewable energy sources, such as solar panels, to reduce reliance on non-renewable energy and contribute to a cleaner energy system. Overall, the public garden rehabilitation project aspires to create a sustainable and vibrant space that benefits the environment, the community, and future generations.
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
The Rehabilitation of Sioufi Garden Project has set sustainable objectives that encompass various aspects. The project aims to create a harmonious balance between environmental conservation, social inclusivity, and economic viability. By implementing sustainable practices and measures, the project seeks to minimize its ecological footprint and promote long-term environmental sustainability. It focuses on enhancing accessibility, ensuring that the garden is welcoming and easily accessible to individuals of all abilities. Safety and security are prioritized, guaranteeing a secure and enjoyable experience for visitors. Additionally, the project incorporates renewable energy sources, such as solar panels, to reduce reliance on non-renewable energy and contribute to a cleaner energy system. Overall, the public garden rehabilitation project aspires to create a sustainable and vibrant space that benefits the environment, the community, and future generations.
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
77111603
-
Land rehabilitation services
New amendment added #6: This amendment is made to upload the Site visit report.
Edited on:
22-May-2024 10:54
Edited by:
webservice@unops.org
New clarification added: Question:Mechanical division:Rehabilitation of trench drain : It is required only cleaning and minor maintenance, or it is should replace frame and covers.Electrical division: Some of CCTV cables might exceed 90 meters in length, please advise.UNOPS Answer:- As per mechanical b.o.q item 2.6, the rehabilitation of the trench drain includes only cleaning and minor maintenance, and connection to piping system (if exists). - The maximum allowed run for the Cat6A is 100 meters. Also note that location of CCTV camera and industrial switch for fiber optic shall adjusted according to actual site condition and as per specialist recommendation.Regards,
Edited on:
21-May-2024 15:01
Edited by:
webservice@unops.org
New clarification added: Question:Regarding the new BOQ sent from your side, we need more time for pricing, especially for items in Mechanical and Electrical divisions (Fire Pumping System, Generators etc...) in addition to the civil and architectural works modified in the BOQ. So we are requesting an extension of time for the deadline of the bid.UNOPS Answer:Please note that the deadline of the bid was already extended till Monday 27 May 2024. However, the ITB amendment including the fire fighting system was issued 14 May,so bidders have approximately 2 weeks to price the subject items.Regards,
Edited on:
21-May-2024 13:28
Edited by:
webservice@unops.org
New clarification added: Question:Please clarify levels for the area between fences and cafeteria building. Thank youUNOPS Answer:Please note that the new pathway level is higher than the existing fence level. The drawings (Cafeteria GF Plan - A102b (hatched in Gray), Cafeteria Section BB - A-301a , Cafeteria wall section 02-03 - A-400) show the location of the pathway and the new fence height. Modifications of the fence height is already mentioned in the BOQ in Landscape Part.Regards
Edited on:
21-May-2024 13:22
Edited by:
webservice@unops.org
New clarification added: Question:1. We kindly request an extension for the deadline of the bid because of the new amendments sent from your side in order to have more time for the pricing procedure. 2. We kindly request an extension of time as you have added new items to the BOQ for pricing.UNOPS Answer:Please note that the deadline was already extended till Monday 27 May 2024The ITB amendment including the firefighting system was issued 14 May, so bidders have aproximately 2 weeks to price the subject itemsRegards
Edited on:
21-May-2024 13:17
Edited by:
webservice@unops.org
New clarification added: Question:Following our site visit today and our inspection of the Old Metal Slides mentioned in item 9.9.2, we found that they are beyond repair due to extensive damage and concrete stains. Therefore, may we exclude this item from our scope of work?UNOPS Answer:The old metal slides referenced in item 9.9.2 cannot be removed, as they are deemed an artistic installation integral to the garden's original design vision, hence its rehabilitation is very minor restricted to keeping the slides as monuments and not for use.
Edited on:
21-May-2024 13:09
Edited by:
webservice@unops.org
New clarification added: Dear Bidders,Thank you for attending the site visit and the report will be published soon.Regards,
Edited on:
21-May-2024 13:03
Edited by:
webservice@unops.org
New amendment added #5: This amendment is made to extend the deadline for bid submission.Please refer to the General tab on eSourcing,All other terms and conditions remain the same
Edited on:
16-May-2024 13:34
Edited by:
webservice@unops.org
New amendment added #4: This amendment is made to:Upload revised ITB_Section_II_III_IV_V REV1. Please refer to the Documents tab on eSourcing. All changes are marked in red fontModify the similar experience criteria under Qualification criteria. Please refer to the Criteria tab on eSourcing and the “ITB_Section_II_III_IV_V REV1” in the Documents tab on eSourcing.Upload Revised Tender package REV1. Please refer to the Documents tab on eSourcing Extend the deadline for submission. Please refer to the general tab on eSourcing Extend the deadline for clarifications. Please refer to the general tab on eSourcing Confirm the second site visit details. Please refer to the Particulars tab on eSourcingAll other terms and conditions remain the same
Edited on:
14-May-2024 16:08
Edited by:
webservice@unops.org
New clarification added: PLEASE NOTE THE FOLLOWING CORRECTION TO THE CLARIFICATION POSTED ON 2024-05-13 AT 13:09 UTC:Question:1. Could you please confirm that H-WP1 and H-WP2 cover CB2, not CB3, and that H-WP3 & H-WP4 cover CB3?UNOPS reply (corrected):1. CB2 is only a concrete bench, only CB3 has wooden prototypes full coverage or partial coverage, hence H-WP1 and H-WP2 covers CB3 while the woodenprototype partially covers the CB3 concrete blocks and H-WP3 and H-WP4 covers CB3 as well
Edited on:
14-May-2024 12:29
Edited by:
webservice@unops.org
New clarification added: Question: please provide us more details regarding the exterior library: Type H-LBUNOPS reply: please refer to the image in this link, provided in the Tender package as an example of the exterior library. The material should be hard wood with its necessary fixations. Once the ground works on site have been mostly completed by the Contractor, the Engineer will select the adequate tree in Zone A , and prepare the detailed drawing with the exact measurements for implementation.
Edited on:
13-May-2024 15:20
Edited by:
webservice@unops.org
New clarification added: Question: 1. Could you please confirm that H-WP1 and H-WP2 cover CB2, not CB3, and that H-WP3 & H-WP4 cover CB3?2. and please confirm that the H-CB1 is to be placed directly on the floor without a metal structure.UNOPS reply: 1. Confirmed.2. The entire bench, made of precast concrete, is designed to be placed directly on the ground.
Edited on:
13-May-2024 15:13
Edited by:
webservice@unops.org
New clarification added: Question: Could you please clarify the location of the steel tree grid in the BOQ? I have noticed it in the drawings but couldn't find it listed in the BOQ.UNOPS reply: Kindly specify which tree grid is being referred to in the drawings, and annotate it on an image for clarity.
Edited on:
13-May-2024 15:06
Edited by:
webservice@unops.org
New clarification added: Question: Could you please provide us with more details regarding the H-WB1 and H-WB2 drawings? Specifically, we would like to know if the tables and benches are made of precast concrete and if the tables are covered with wood. Additionally, could you clarify the details regarding the steel structure?UNOPS reply: The seating and the table surface are Wood.The steel structure is for the structure of the table.Catalogues for similar items could be submitted.H-WB2 may require customization in case of unavailability in market.Please check this link
Edited on:
13-May-2024 15:00
Edited by:
webservice@unops.org
New clarification added: Question: We would like to clarify item number 11.7.8, H-P08. The quantity as per the BOQ is 6, while the image on the drawing indicated 8. Could you please confirm the quantities?UNOPS reply: Kindly refer to the BOQ quantity
Edited on:
13-May-2024 14:52
Edited by:
webservice@unops.org
New clarification added: Question: We would like to clarify item number 11.7.8, H-P08. The quantity as per the BOQ is 6, while the image on the drawing indicated 8. Could you please confirm the quantities?UNOPS reply: Kindly refer to the BOQ quantity
Edited on:
13-May-2024 14:49
Edited by:
webservice@unops.org
New clarification added: Question: Could you please clarify the following three items:Backgammon Table 260*60cmBackgammon Table 60*60cmBackgammon Bench width 40cmWe would like to know if you only require the precast concrete or if you also need the gaming kits. Could you please provide us with more details?UNOPS reply: the board game is engraved on the table
Edited on:
13-May-2024 14:45
Edited by:
webservice@unops.org
New clarification added: Question: could you please provide us more details and drawings regarding the Wood Tree Swings: 11.5.1, 11.5.2, 11.5.3, 11.5.4,11.5.5UNOPS reply: The swings not to be customized. Contractor shall submit catalogues for such items upon the phase of furnishing, aligned with the BOQ description and UNOPS to decide the most suitable option.
Edited on:
13-May-2024 14:38
Edited by:
webservice@unops.org
New clarification added: Question:1. Can you please provide a drawing for H-CB42. Concerning item 11.2.8, is the table in question a support for the backgammon board game, or should the game be engraved on the table.UNOPS reply:1. Kindly Refer to the enclosed CAD File (H-CB4)Link 1Link 22. Yes, the board game is engraved on the table
Edited on:
13-May-2024 14:29
Edited by:
webservice@unops.org
New clarification added: Question: Kindly find below Questions regarding the "Electrical Part".1) The generator rating is 120kVA as per drawings , however its 130kVA as per BOQ. Please Clarify2) Please specify the routing of the exaust steel pipes of generator with elevation from roof levelUNOPS reply:This part related to the generators has been revised in the ITB amendment to be issued shorlty:1) The generator rating Size is updated to the 150 KVA and it quantity is updated to 2 NOS ( one Standby\ one Backup for the standby).2) The exhaust steel pipes from generator are conducted in the shaft of the fire pump room with an elevation of 1.5 meters above roof level. Please refer to DWG M-501.
Edited on:
13-May-2024 14:17
Edited by:
webservice@unops.org
New clarification added: Question:We would like to request an extension of time?In previous clarifications it was mentioned that an updated BOQ will be shared, also a new site visit will be conducted, please advise knowing that in the latest clarification it was mentioned that: “Yes we have dissociated the concrete from the steel reinforcement in the BOQ.Yes, footings under the solar structure to be quoted seperately under item 3.1.2.9”. Is this item in the revised BOQ?UNOPS reply:Please note an ITB amendment will be posted shortly with the new bid submission deadline, site visit date, and revised ITB documents.Please note this item will be in the revised BoQ in the upcoming amendment
Edited on:
13-May-2024 08:55
Edited by:
webservice@unops.org
New clarification added: Question:Can you please clarify the following:· Please specify which materials are TB1-TB2-TB3 made of· Items 11.1.5 and 11.2.7 both mention H-CP1 (which in the landscape drawings show a concrete planter). Please clarify if both items are the same concrete planter.· Concerning H-CB6, in the section it is shown to have a diameter of 45cm, however in the plan view it is shown to have a diameter of 6.4m, which dimension should we use?· Can you please provide a drawing or specifications for the exterior library?· For TS1-TS2-TS3, what is the acceptable thickness required for the swings?UNOPS reply:. TB1 -TB2 – TB3 : Precast concrete trash bins. Please refer to BOQ for accessories material and fixation. Items 11.1.1 -11.1.2 – 11.1.3Prototype example: Trash Bin-Type H-TB1 (Diam 60cm , 70 cm Height) – Complete 11.1.1Image hereFixation example: Trash Bin-Type H-TB2 (Diam 30cm) Fixed on painted metal Post (included) – Complete 11.1.2 - 11.1.3Image here. H-CP1 – Precast Concrete planter, quantity of 4.. H-CB6 – It is a circular concrete bench of width 45cm & height 43cmThe diameter of the bench is 6.4m, around the existing circular parapet in Zone A – L111Image here. You can refer to this image here, provided in the Tender package as an example of the exterior library. The material should be hard wood with its necessary fixations. Once the ground works on site have been mostly completed by the Contractor, the Engineer will select the adequate tree in Zone A , and prepare the detailed drawing with the exact measurements for implementation.. The swing thickness can be 2.5 to 3cm of hard wood.
Edited on:
09-May-2024 15:32
Edited by:
webservice@unops.org
New clarification added: Question:During the site visit, it was requested to increase the contract duration, and it is mentioned in the site visit report that it shall be amended. Can you please update us on this subject?UNOPS reply:The amended duration will be seven months. Please refer to the upcoming ITB amendment to be posted shortly
Edited on:
09-May-2024 14:27
Edited by:
webservice@unops.org
New clarification added: Question:All items under point 3.1: cast in place concrete shall be quoted as concrete only without steel reinforcement? Please advise.Concrete footings under the solar system structure shall be quoted separately?UNOPS reply:Yes we have dissociated the concrete from the steel reinforcement in the BOQ.Yes, footings under the solar structure to be quoted seperately under item 3.1.2.9
Edited on:
09-May-2024 14:23
Edited by:
webservice@unops.org
New clarification added: Question:Please note that for the UPS, its mentioned in the BOQ that its should be single phase, or in the specifications its mentioned that it should be three phase. Please advise.UNOPS reply:The UPS is mentioned in BOQ as single phase. The sizing of the ups shall be 6 Kva as per calculation notes according to single phase. Specs will be updated accordingly
Edited on:
09-May-2024 14:18
Edited by:
webservice@unops.org
New clarification added: Question:Type of New Natural stone listed below BOQ items ( 4.2.1- .2- .3- .4) in architectural Works.Type of Marble threshold listed below BOQ items (9.2.5.1- .2- .3) in architectural Works.Type of New Natural Stone Wall Cladding listed below BOQ items ( 4.2.1- .2- .3- .4) in landscape works.Type of New Natural Stone listed below BOQ items ( 9.3.1.1- .2- 9.3.2.1 ) in landscape works.UNOPS reply:All new natural stone types to be similar to existing types on site (cladding, floor tiles..) both for architectural and landscape works.For its minimal clean finish adequate for public areas, we suggest Carrara marble. Final approval, from the engineer, will be given upon material submittalsAll new natural stone types to be similar to existing types on site (cladding, floor tiles..) both for architectural and landscape works.All new natural stone types to be similar to existing types on site (cladding, floor tiles..) both for architectural and landscape works.
Edited on:
09-May-2024 14:14
Edited by:
webservice@unops.org
New clarification added: Question:What are the types of paint CP1 to CP5 ?Item (9.5.1.6 CT-5 type 5 (waterproofing special treatment)) is mentioned in m3, please confirm that this item should be priced as m2.UNOPS reply:CP1, CP4, CP5 are acrylic-based paints, CP2 and CP3 are oil-based paint, since they serve the wet areas and technical areas. All paints as per BOQ should be lead-free and Low VOC.Confirmed, unit is m2
Edited on:
09-May-2024 14:09
Edited by:
webservice@unops.org
New clarification added: Question:Can we substitute the 670W panels requested with 600W panels knowing that we keep the same total peak power.UNOPS reply:Please use the 670 W panels as per the Desin, BOQ and Specs
Edited on:
09-May-2024 13:56
Edited by:
webservice@unops.org
New clarification added: Question:Are there still going to be another scheduled site visit? or another extension of time for submittals of bids?UNOPS reply:Please note an ITB amendment will be posted shortly concerning this matter.
Edited on:
09-May-2024 13:47
Edited by:
webservice@unops.org
New clarification added: Question: In the file "Small_Works_ITB_Section_VI_Returnable Schedules", can you please clarify what is requested to be filled in Schedule 4.1.B [Daywork Schedule].UNOPS reply:4.1.B Daywork Schedule(Details in accordance with Sub-Clause 9.4 of the General Conditions):(a) For work of a minor or incidental nature, the Employer may instruct that a Variation shall be executed on a daywork basis. The work shall then be valued in accordance with Sub-Clause 9.2 [Valuation of Variations].(b) The Contractor shall keep records of hours of labour and Contractor's Equipment and quantities of Plants and/or Materials used.
Edited on:
06-May-2024 08:55
Edited by:
webservice@unops.org
New amendment added #3: This amendment is made to extend the deadline for bid submission and the clarifications deadline.Please refer to the General tab on eSourcing,All other terms and conditions remain the same
Edited on:
30-Apr-2024 09:41
Edited by:
webservice@unops.org
New clarification added: Question: Could you please provide us with the codes for items 5.2.1 and 5.2.2 ( Emergency Gate and service gate)? Are these RSG01 and RSG02? Please confirmUNOPS reply: confirmed
Edited on:
29-Apr-2024 11:52
Edited by:
webservice@unops.org
New clarification added: Question: Could you please confirm if we have the option to utilize local manufacturing or Chinese brands for the Outdoor Gymnasium equipment and Kids & Interactive Playsets as alternatives to the pictures requested?UNOPS reply: There are no restrictions on the country of origin as long as the specifications requirements stipulated in the tender documents are met
Edited on:
29-Apr-2024 11:48
Edited by:
webservice@unops.org
New clarification added: Question: After reviewing BOQ, specifications and drawings, we kindly ask you to clarify the following issues in order to submit our quotation accordingly.1- Roofs:BOQ page 1/1 item 7.1 calls for:- 4mm thick SBS waterproofing membrane complete with primer.- Geotextile protection layer.- Gravel/stamped concrete.Specifications (division 07, pages 184 and 185 of 402) call for:- Single layer of 1.5mm thick EPDM waterproofing membrane.- Cartonal protection sheet.Drawing # A-901 detail 5 calls for:- 4mm thick waterprooting membrane.- Geotextile protection layer.- 5cm thermal insulation- Protection board.Please specify which system to adopt in order to price accordingly- Type of requested membrane whether SBS or EPDM.- Type of protection layer (geotextile, cartonal or both of them)- Clarify whether the insulation is required or not.2- Old Basement Walls:BOQ page 1/1 item 7.3 calls for:- Two layers of bituminous liquid waterproofing- Cartonal protection- 10cm concrete block wall.Specifications (division 07, pages 178 and 179 of 402) call for:- 1.5mm thick self-adhering waterproofing membrane- Protection course type Cartonal.Drawing # A-901 detail 1 calls for:- Waterproofing membrane- Protection layer Cartonal- Masonry 10cmPlease specify which system to adopt in order to price accordingly. i.e.:- Type of requested membrane whether liquid waterproofing or self-adhering membrane- Thickness of the requested protection boardUNOPS reply: Kindly refer to the system provided in the BOQ for both roof and basement walls.
Edited on:
29-Apr-2024 11:45
Edited by:
webservice@unops.org
New clarification added: Question: Please give some further details about the list of queries below related to Signage:Some signage missing dimensions in drawing, and the specifications do not include the type of wood requested or the thickness of the aluminum sheet for engraving. Please advise.please note that the specifications on page 351 mention general items related to anti-shatter and anti-blast film, but these items were not found in the BOQ. Kindly provide feedback on the above in order for us to send our quotation accordingly UNOPS reply:Regarding the first point, for reference to dimensions, please consult Sheet Number L-920.For enhanced clarity, pertinent details are outlined below:kindly consult the dimensions of one unit to ascertain the width for Signage 1 through 6. Each signage includes a reference indicating the number of units it contains.Signage 7 equals to 3 width units therefore width is 630 cm.Signage 8 – 9 – 10: Width 300cmType of Wood Requested: OakThickness of the Aluminum Sheet: Range between 1.2 to 1.5 mmRegarding the second point, these are general items, kindly refer to all items in BOQ.
Edited on:
29-Apr-2024 11:38
Edited by:
webservice@unops.org
New clarification added: Question: Please Specify the system to adopt in order to price accordingly and prevent contradiction:1. RoofBOQ page 1/1 item 7.1 calls for:-4mm thick SBS waterproofing membrane complete with primer.-Geotextile protection layer.-Gravel/ stamped concrete.· Specifications (division 07. pages 184 and 185 of’ 402) call for:-Single layer of 1.5mm thick EPDM waterproofing membrane.-Cartonal protection sheet.· Drawing # A-90 I detail 5 calls for:-4mm thick waterproofing membrane.-Geotextile protection layer.-5cm thermal insulation-Protection board.2. Old Basement Walls· BOQ page 1/1 item 7.3 calls for:- Two layers of bituminous liquid w waterproofing-Cartonal protection-10cm concrete block wall.· Specifications (division 07. pages 178 and 179 of 402) call for:-1.5mm thick self-adhering waterproofing membrane-Protection course type Cartonal.· Drawing # A-901 detail l calls for:-Waterproofing membrane-Protection layer-Cartonal Masonry 10cmUNOPS reply:Kindly refer to the system provided in the BOQ for both roof and basement walls.
Edited on:
29-Apr-2024 11:32
Edited by:
webservice@unops.org
New clarification added: Question:You mentioned that the deadline for bid submission will be extended, please advise.You mentioned that a new site visit will be scheduled, please advise.UNOPS reply:Please note the deadline for bid submission will be extended and a new site visit will be scheduled.The new dates will be communicated shortly.
Edited on:
25-Apr-2024 11:18
Edited by:
webservice@unops.org
New clarification added: Question:You mentioned that the deadline for bid submission will be extended, please advise.You mentioned that will be new site visit will be scheduled, please advise.UNOPS reply:The new site visit and bid submission dates will be communicated shortly.
Edited on:
24-Apr-2024 15:03
Edited by:
webservice@unops.org
New clarification added: Question:After reviewing the BOQ and specifications we couldn’t find the dimension of the ceramic, please advise.UNOPS reply:For dimension guidelines: General areas should have a minimum dimension of 60 cm x 60 cm, while wet areas should be sized at either 30 cm x 30 cm or 30 cm x 60 cm. The final dimensions for ceramic installations will be determined conclusively during the contractor's material submittal and shop drawings, subject to engineers' approval.
Edited on:
24-Apr-2024 15:00
Edited by:
webservice@unops.org
New clarification added: Question:Telecom System for CCTV, specify the note that there is a mismatch between the riser and the BOQ:Kindly specify If the cables needed are Cat6 UTP or Cat6A UTP or FTP (cannot have connection of both), And regarding the fiber optic cables is it single mode or Multimode? If Multimode please specify if OM3 or OM4? (Also, the patch panel and the cable cannot be each different from the other)?UNOPS reply:The Cable used for CCTV shall be Cat6A UTP. Regarding the Fiber Optic Cables the selection shall be multi-mode cables Classification OM3.
Edited on:
24-Apr-2024 14:57
Edited by:
webservice@unops.org
New clarification added: Question:CCTV System: Is Chinese brand in general accepted?UNOPS reply:There are no restrictions on the country of origin as long as the specifications requirements stipulated in the tender documents are met
Edited on:
24-Apr-2024 14:54
Edited by:
webservice@unops.org
New clarification added: Question:Could you please provide clarification on the importance of conducting a soil investigation, especially considering that a soil investigation report has already been included in the tender documents?UNOPS reply:the contractor is required to conduct the necessary tests to determine the average soil absorption rate (permeability) only.
Edited on:
24-Apr-2024 14:52
Edited by:
webservice@unops.org
New clarification added: Question:After reviewing the drawings and the Bill of Quantities (BOQ), discrepancies in quantities were identified between the schedules and the BOQ. For instance, certain curtain walls and windows listed in the aluminum schedule on drawing A-710 were not accounted for in the BOQ.UNOPS reply:In general, in the case of discrepancies, the more stringent requirement applies, however the quantities are to be remeasured. Regarding this specific discrepancy, this was rectified in the ITB amendment that will be posted shortly, and the BOQ aligns with the aluminum schedule.
Edited on:
24-Apr-2024 14:48
Edited by:
webservice@unops.org
New clarification added: Question: We are kindly requesting your approval to make a site visit to the site.UNOPS reply: A new site visit will be scheduled shortly. The date will be posted in an ITB amendment that will be posted shortly.
Edited on:
22-Apr-2024 14:09
Edited by:
webservice@unops.org
New amendment added #2: This amendment is made to:Upload the 8th April Site Visit Report. Upload the files "L-800" and "L-801" which have been updated with better resolution images. Upload the PDF Files “SIOUFIGARDEN_MILESTONE-5-GymPics-7163264” and “SIOUFIGARDEN_MILESTONE-5-fixturesheet3-7163267" (L-920) which have been converted to JPG format for easier access.Upload Landscape PDF FilePlease refer to the Documents tab on eSourcing.All other terms and conditions remain the same.
Edited on:
22-Apr-2024 12:39
Edited by:
webservice@unops.org
New clarification added: Question:Kindly we're requesting an extension to the project deadline. UNOPS reply:The deadline for bid submission will be extended. Please refer to the ITB amendment that will be posted shortly.
Edited on:
21-Apr-2024 11:41
Edited by:
webservice@unops.org
New clarification added: Question:Reference to the experience required, it is mentioned that the contractor must have "Works contracts entailing construction/rehabilitation of multipurpose and recreational facilities and cafeterias including the procurement and installation of all kitchen equipment with a cumulative area of at least 1000 m2", and reference to the BOQ, there are no kitchen equipment items to be supplied and installed. We have only kitchen cabinets to be supplied and installed. Kindly clarify. UNOPS reply:The kitchen equipment and items will be procured by the operating entity, the contractor is responsible of the scope of work entailed in the tender package. This will be modified in an ITB amendment shortly
Edited on:
21-Apr-2024 11:27
Edited by:
webservice@unops.org
New clarification added: Question:Reference to the fire protection requested items, according to BOQ the request is based on European standard and according to specifications the request is based on UL American standard . Could you please clarify which standard to follow. UNOPS reply:The standard to follow is UL American Standard. This will be corrected in an ITB amendment shortly.
Edited on:
21-Apr-2024 11:13
Edited by:
webservice@unops.org
New clarification added: Question:Kindly note that the plant selection in drawing L-800, L-801 are not clear. PDF Files: “SIOUFIGARDEN_MILESTONE-5-GymPics-7163264”, “SIOUFIGARDEN_MILESTONE-5-fixturesheet3-7163267 ” are not opening. Answer:L-800, L-801 have been updated with better resolution images. New documents will be posted in an ITB amendment shortly.The PDF files have been converted to JPG format for easier access (L-920). New documents will be posted in an ITB amendment shortly.
Edited on:
21-Apr-2024 11:04
Edited by:
webservice@unops.org
New amendment added #1: This amendment is made to extend the deadline for bid submission and the clarifications deadline.Please refer to the General tab on eSourcing,All other terms and conditions remain the same
Edited on:
09-Apr-2024 08:44
Edited by:
webservice@unops.org
New clarification added: Question:Please advise if you can schedule another site visit, if not please confirm if we can still submit our offer.UNOPS reply:Please note bidders can still submit an offer even if not attending the site visit. Please refer to the Particulars tab on eSourcing: "the Location inspection is not mandatory but is strongly encouraged to avoid the risk of non-compliant quotations."
Edited on:
08-Apr-2024 13:02
Edited by:
webservice@unops.org
New clarification added: Question:Please note that due to the official holidays, kindly can you postpone the deadline of the above mentioned project.UNOPS reply: Please note the deadline for bid submission will be extended until 30 April 2024. Please check the ITB amendment that will be posted shortly
Edited on:
08-Apr-2024 11:18
Edited by:
webservice@unops.org
New clarification added: Dear sir, madam,A kind reminder that the Site visit/inspection date is on Monday 08-04-2024 at 09:00 AM UTC.Location: Sioufi Garden, Achrafieh , BeirutKind regardsUNOPS
Edited on:
07-Apr-2024 09:02
Edited by:
webservice@unops.org