ITB Construction Contract for Small Works - Construction of Cat IV Housing Units in Ninewa and Anbar Governorates, Iraq
UNOPS
ITB Construction Contract for Small Works - Construction of Cat IV Housing Units in Ninewa and Anbar Governorates, Iraq
Invitation to bid
Reference:
ITB/2024/54987
Beneficiary countries or territories:
Iraq
Registration level:
Basic
Published on:
04-Dec-2024
Deadline on:
22-Dec-2024 07:00 (GMT 0.00)
Description
Tender description: Construction of Cat IV Housing Units in Ninewa and Anbar Governorates, Iraq
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
81101513
-
Building construction management
New clarification added: Question:Carification regarding the Ceiling Fans and Wall Fan indicated in the electrical drawings (E101). Specifically:Ceiling Fans (3 units) and Wall Fan (1 unit) are shown in the drawings but are not mentioned in the Bill of Quantities (BOQ).Could you kindly confirm if these fans are included under Section 6.3 of the electrical works?If not, please clarify how these items should be addressed in the BOQ, and what Section 6.3 specifically includes.UNOPS reply:Supplying ceiling and wall fans is part of the contract and is mentioned in the BOQ as shown in the description of item 61. Fans: Shall be heavy duty and rigid KDK or equivilant)2. Outlets: Contractor shall supply, install, test and commission new power point with fan includes wiring and raceways connect up to distribution board, includes wiring (size as noted on drawings) routed in exposed PVC conduit/trunks, backboxes, termination from both side with all works and necessary fixation accessories required to complete this item.Filling factor of conduits shall not exceed 40%, maximum quantity of 7 wires 2.5mm2 inside 20mm dia. UPVC conduit
Edited on:
18-Dec-2024 10:11
Edited by:
webservice@unops.org
New clarification added: Question:In Section V, 3.1 Scope of Works,- Item 3 - Renovation; It is marked by N/A. Does that mean that Demolition is for the complete Housing Units and all the work is new? Please adviseUNOPS reply:The demolition of housing units and disposal of debris at a designated dumpster assigned by the local municipality are the contractor's responsibilities. Therefore, it is concluded that the contractor should perform this activity. Please refer to the ITB - Section IV - Schedule 2
Edited on:
18-Dec-2024 10:07
Edited by:
webservice@unops.org
New amendment added #2: This amendment is made to upload the GPS coordinates for both lots. Please refer to the Documents tab on eSourcing.All other terms and conditions remain the same
Edited on:
17-Dec-2024 09:17
Edited by:
webservice@unops.org
New clarification added: Question:This is to clarify that GPS coordinates for the houses are not provided in the tender documents.UNOPS reply:The GPS coordinates of the selected housing units will be uploaded via an amendment shortly. Please refer to the documents tab on eSourcing. Please note that these housing are not final and changes could be made in the future but within the same locations.
Edited on:
16-Dec-2024 10:52
Edited by:
webservice@unops.org
New amendment added #1: This amendment is made to upload the pre-bid meeting minutes and revised BoQ for both lots. Changes made in the BoQ are marked in redPlease refer to the Documents tab on eSourcing.All other terms and conditions remain the same
Edited on:
15-Dec-2024 12:33
Edited by:
webservice@unops.org
New clarification added: Question:Please, can you update the BOQ files for both Lots, because the old files didn't work.UNOPS reply:The BoQs are uploaded as xlsx (Microsoft Excel). Bidders shall download the file and ensure they have the software (Microsoft Excel) to access the file
Edited on:
05-Dec-2024 10:11
Edited by:
webservice@unops.org