New amendment added #4: The RFQ is amended in order:1. To add the amended BoQ for Lot 3, (pavement works part 2 for Bani Al Nahari Branch).
Edited on:
28-Jul-2022 08:45
Edited by:
webservice@unops.org
New amendment added #3: The RFQ is amended in order:1. To add the pre-bidding conference minutes.2. To add the amended BoQs for the four lots, removing the requirement of handing over the vehicles to UNOPS after competition of the project.3. To add the document (Appendix tech specific for all Lots).
Edited on:
26-Jul-2022 17:40
Edited by:
webservice@unops.org
New clarification added: Question 21: Our bank is CAC Bank, and we have onother account in Saba Islamic Bank ,are those banks acceptable??when we should fill out the form of bank guarantee? Befor or after win??Answer: Yes, it should be acceptable. Bank Guarantee is required upon the contract signature. Question 22: Is the elctronic sign &stamp acceptable ? Or we shoud print the quotation and sign it then make it pdf & uplod it??Answer: Yes, electronic signature and stamp is acceptable Question 23: Regarding to items of excavation & backfilling , you mentioned refer to annex A & and this document does not exist in documents of tenders , Kindly advice us ?Answer: Please refer to the document called (General Specifications) attached to this RFQ.Question 24: Kindly provide us by drawings of cross 0+.25 - 7+000 in Bajil road tender.Answer: Please refer to the RFQ documents, drawings. Question 25: With regard to the deliverables section of the terms of reference, we expect the project to be completed within a year and six months from the date of receiving the project.Answer: Yes, this is for Lot 4: ELC-RAP-HOD-001 (Rehabilitation and Upgrading of Bajel- Al Janadia- Al Salif 33.30 Km) Question 26: Please confirm that there is no bidding security guarantee request for submittion.Any chance of offering an advance payment, especially with newly road construction?Answer: No. Question 27: Please clarify in the paper (Land Works 1) Item No. 3 and 4 Is each a separate item or is it a single item?Answer: If you refer to the Lot 3, yes, there are two parts, but in one lot. The supplier must offer for both parts. Failure to do so, it will disqualify the bidder’s offer Question 28: With regard to diesel, the price of a liter in the commercial market is 1,000 riyals. Does the contractor depend on its market pricing, or will UNEPS ask the Yemeni Oil Company to provide the price of diesel to the contractor at the official price?Nswer: It is the contractor responsibility.Question 29: In vendor submission section documents checklist there is no window for uploading key personnel so is it required or notAnswer: Please upload the document you intend to upload and make sure you name it clearly. Question 30: السؤال: في حالة تغير أسعار المواد الأساسية مستقبلاً خلال فترة تنفيذ الأعمال مثل المحروقات (خاصة الديزل) والأسفلت ، فهل يتم احتساب فروق زيادة الأسعار بالنسبة للمقاول وقت التنفيذAnswer:ليس من الممكن احتساب اي فروقات سعرية Question 31: the event that the prices of basic materials change in the future during the period of implementation of the works, such as fuels (especially diesel) and asphalt, will the differences in price increase be calculated for the contractor?Answer: No this is not possible Question 32: in the event that the prices of basic materials change in the future during the period of implementation of the works, such as fuels (especially diesel) and asphalt, will the differences in price increase be calculated for the contractor?Answer: No, the prices must be fixed and the same during the entire life of the project. Contractor is not allowed to to ask for any changes and UNOPS will not accept any request for changing prices. Question 33: Surrey we have to comment regarding our Question NO. 1 We mean lot NO. 4NOT LOT NO. 3 as you mentioned in your answer.Please confirm us regarding the presence of two similar bill of quantities in lot NO.4 and not LOT NO. 3. Shall we quote for both of them or only one in lot NO 4.Answer: Thanks, only the BoQ Lot 4 uploaded. Question 34: 1- في مناقصة باجل البند رقم Facilities A-B-C-D محدد الوحدة Monthy rate المعدل الشهري هل المقصود معدل ايام السكن والسيارات ومعدل الزيارات ومعدل المعدات والعمل بها ؟ Answer: المعدل الشهري هو ما سيدفعه الجهة المتعاقدة للمقاول مقابل ايجار الخدمات المطلوبة خلال الشهر Question 35: الوقت ليس كافي لدراسة المناقصة يرجى اعادة النظر في مدة الوقت اللازم لاعداد ودراسة المناقصة بشكل صحيح Answer: لقد تم التمديد حتى 3 اغسطس 2022 Question 36: How long are the contracts of (Rehabilitation and Upgrading of Bajel- Al Janadia- Al Salif 33.30 Km) & (Rehabilitation and Upgrading of Albaida - Mokal - 10.40 KM) ?Answer: It is for 18 months, please review the RFQ documents carefully. Question 37: In the vendor submission, Documents Chicklist part, there is no place for submitting schedule 4.4 (Key personal, schedule), 0.5 (Format for Resume of Proposed Key Personnel), female CVs and orginazation chart Answer: Please feel free to upload your documents in any place which the above requirements falls under.
Edited on:
26-Jul-2022 14:02
Edited by:
webservice@unops.org
New clarification added: Question 15: 1 Dears, After checking the BoQs of Lot 3_ Hajja, There is no Subgrade preperation in the BoQ of Bani Al Nahari Branch (2.075 km). is it mistakinly dropped or the subgrade layer is already prepared? Answer: Thanks, the BoQ for Earthworks 2, for Lot 3, part 2, has been corrected and added. Question 16: 2. Tn whom that the property of survey, laboratory equyipment, site office and housing facilities will be after completion of works. Answer: The property of all engineer’s facilities will be the contractor(s). Question 17: Regarding to BoQ no(1) (Engineer's facilities) we don't find the specification No.(1.2 a,b,c and d) in the file, so we don't find any detail about that facilities such are :-2.1 Specification, size and sort of what vehicles, in addition to specify whether the cars will be land cruiser or pickup Answer: The technical specifications are already provided and attached to this RFQ in a document called (Technical Specification Part A) 2.2 Area and construction materials that are required for each of the site office and house in addition to specify whether caravan or structional building? Answer: Construction of engineer’s office and housing is not required, The Engineer's office and housing can be rented in the nearest town or village. 2.3 List about all facilities that are required for site office such as (furniture, office equipment etc.) including the quantity for each item, in addition to show the monthly services and requirments that are required. Answer: Please refer to the attached uploaded document called ((Technical Specification Part A) 2.4 Ditto but for housing?Answer: Please refer to the attached uploaded document called (Technical Specification Part A) 2.5 Ditto but for survey equipment?Answer: Please refer to the attached uploaded document called (Technical Specification Part A) 2.6 Ditto bot for laboratory equipment incliding to show the area and sort of the lab. house?Answer: Please refer to the attached uploaded document called (Technical Specification Part A) Question 18: We don't find the specification no.(807.A and 809.A) in the file.Answer: 807A & 809A are uploaded to this RFQ in a document called (Appendix tech specific for all Lots).Question 19: There is no any drawing about the glavanized steel fences (Handrails) whithin the volume 4A in addition its specification no.(6.12 A) is not findAnswer: This is available in the (Appendix tech specific for all Lots). Question 20: Refering to engineer facilities, should the rented site office be in project site ? Or in Bajil as it will be the nearst distcrit to the project and we can find the suitable place thereAnswer: The Engineer's office and housing can be rented in the nearest town or village.
Edited on:
26-Jul-2022 13:58
Edited by:
webservice@unops.org
New amendment added #2: The RFQ is amended in order to extend the duration.
Edited on:
25-Jul-2022 18:32
Edited by:
webservice@unops.org
New clarification added: Question 11. The time period is not enough, so we kindly ask you to extend an additional ten days so that we can study and prepare the tender properly and completely.Answer: Sorry; we cannot extend the deadline. The case is emergency and we need to start as soon as possible.Question 12 Do we have to bid in all lots or we can choose one ? Can you extand the deadline time ?Answer: Yes you can choose one lot or more. The evaluation ia done per lot. As for the extension of deadline, the case is emergency and we need to start as soon as possible.
Edited on:
22-Jul-2022 14:00
Edited by:
webservice@unops.org
New amendment added #1: This RFQ is hereby amended in order: 1. To add the document: Lot 4_Small_Works_RFQ_Section_II_III_IV_V2. To add the document: UNOPS Minimum Health and Safety Requirements for Contractors - EN3. To add the amended BoQ for Lot 1: Lot 4_BoQ_Bajil- AL Gonaydeah- Assalif - amended
Edited on:
21-Jul-2022 16:08
Edited by:
webservice@unops.org
New clarification added: Question 1: The date is insufficient because the reason is the lack of time between the publication of the bid and the deadline for submission, because this requires visiting the sites and studying the bid and others.Answer: Sorry, this is an emergency and we cannot extend the deadline for offers submission.Question 2: Following our study of the project tender documents we found some confusion and miss - understanding which can be briefly explained as follows : - The presence of two similar bill of quantities acquiring the same title and quantity of works, so that shall we quote for one or for both of these two bill of quantities .Answer: Lot three has two parts and there is no any separate or duplicated BoQ. For example, part one refers to Al Aman- Suqe Al Amshah (9.55 km), and part two refers to Bani Al Nahari Branch (2.075 km). Here, the supplier must offer for both part 1 and part 2, ref. Sub-project #. ELC-RAP-HAJ-001Question 3 The missing of the following tender documents;- UNOPS minimum health and safety requirements and - 5-6 solicitation RFQ 04 sections II ,III ,IV and V.:Answer: It is uploaded once the amendment is madeQuestion 4: Where is the pre – tendering meeting:Answer: the pre-bidding conference will be held in Sanaa at UNOPS office on Sunday, 24 July 2022 at 10.00am as indicated in our RFQ.Question 5: Where is - Small works – 1 instrument of agreement:Answer: Please refer to our RFQ_Section_II_III_IV_V for every single lot. You can find it in section 3. Question 6: Where is Preamble to the bill of quantities.Answer: There is no preamble to BoQ.Question 7: Where is Scope of work regarding the 0 start point and the final project end station. Answer: Sorry, we did not understand your question. What do you mean by start point.Question 8: Question: we have notes about the differences between the number's Small_Works_RFQ_Section_VI_Returnable Schedules and vendor confirmation number's document checklistfor example : IN Small_Works_RFQ_Section_VI_Returnable Schedules number is 4.9 [Insurance Details and Insurances] RIGHT IN vendor confirmation number's document checklist number is 4.4[Insurance Details and Insurances] wrongSchedule 0.6 [Dispute Details] wrong Schedule 0.10[Dispute Details] RIGHTmost of them like that Answer: Please refer to the RFQ documentQuestion 9: I would like to draw your attention that, we don't find the file “Lot4_Small_Works_RFQ_Section_II_III_IV_V” in the tender documents.Answer: It is uploaded once the amendment is madeQuestion 10: We want to know about the Time for Completion in Lot 4_Bajil- AL Gonaydeah- Assalif because there is not attached that Lot _Small_Works_RFQ_Section_II_III_IV_V with download file document Answer: It is hereby attached, and the completition time is 18 months as indicated in the uploaded Lot 4 _Small_Works_RFQ_Section_II_III_IV_V, and amended BoQ
Edited on:
21-Jul-2022 14:52
Edited by:
webservice@unops.org