CANCELLED Invitation to bid for Construction of Health Facilities in Hlaing Thar Yar Township in Yangon, Myanmar
UNOPS
CANCELLED Invitation to bid for Construction of Health Facilities in Hlaing Thar Yar Township in Yangon, Myanmar
Invitation to bid
Reference:
ITB/2020/18011
Beneficiary countries or territories:
Myanmar
Registration level:
Basic
Published on:
14-Dec-2020
Deadline on:
10-Jan-2021 07:30 (GMT 0.00)
Description
Tender description: Invitation to bid for Construction of Health Facilities in Hlaing Thar Yar Township in Yangon, Myanmar
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
This procurement opportunity integrates considerations for at least one sustainability indicator. However, it does not meet the requirements to be considered sustainable.
Gender issues
Social
The tender contains sustainability considerations addressing gender equality and women's empowerment.
Examples:
Gender mainstreaming, targeted employment of women, promotion of women-owned businesses.
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72121403
-
Hospital construction service
Tender cancelled on 2021-04-23 10:12 UTC. Dear Sir/Madam,We would like to inform you that UNOPS cancelled this ITB.Thank you.Best regards,MMOC Procurement Unit.
Edited on:
23-Apr-2021 12:12
Edited by:
webservice@unops.org
New clarification added: Questions:1. Can we insert the row in the BOQ if we have to give a discount?2. In Returnable Bid Schedule (1), shall we need to be left blank or change in the sentence for bid sercurity? UNOPS Answers:1. Bidder shal not alter or tamper the BOQ. If the bidder want to give discount, it can be distributed among the BOQ items.2. The bidder can leave it blank or fill "NOT APPLICABLE" for bid security.Best Regards,MMOC, Procurement Unit
Edited on:
08-Jan-2021 07:06
Edited by:
webservice@unops.org
New clarification added: Question:We would like to confirm that one number of temporary office is sufficient for the UNOP. Please confirm. UNOPS Answer:Yes, one number of temporary office is suffecinet for UNOPS team.Best Regards,MMOC, Procurement Unit
Edited on:
08-Jan-2021 07:03
Edited by:
webservice@unops.org
New clarification added: Questions:1) Please clarify that submission to authorities (YCDC) shall be fully taken care by contractor or not as well as the duration of submission & approval shall be included in 12 months period or not.2) If Contractor has to do authorities submission; will Client provide AutoCAD design drawings inorder to fit in submission format? Do we need to include authorities submission cost in Tender Sum? UNOPS Answers:1. Submission to YCDC shall be handled by the contractor with the support of MOHS/Yangon region health department and UNOPS. Yes, it is included in the 12 months construction period.2. Yes, UNOPS will provide AutoCAD design drawings. Bidder should not add any additonal lines and tamper the tender BOQ. The cost of YCDC sumission, if any, shall be be distributed among the rates and prices entered for the bill items.Best Regards,MMOC, Procurement Unit
Edited on:
08-Jan-2021 06:58
Edited by:
webservice@unops.org
New clarification added: Questions:We found the variable speed for booster and transfer pump in BOQ, but in the drawing (19C-MEP) mentioned float switch for transfer pump and pressure switch for booster pump. Please clarify. We found the underground isolation valves from underground water tank (02-MEP), but not found the items in BOQ. Please clarify. UNOPS Answers:1. Yes, the requirments is variable speed for booster and transfer pump. This is not related to the switches. The float switch is for the tank and the pressure switch is automation system of the pumps.2. BOQ 17.5 for underground tank is a lump sum item for all undrground water tank works as per the drawing 02-MEP.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 15:05
Edited by:
webservice@unops.org
New clarification added: Question:In BoQ , we do not find Item 13.2 ,13.3 and 13.4 in the Archi Drawing . So Please kindly indicate the place where we see. UNOPS Answer:The information tables (Information Maps) for floors and Rooms shall be as per Architectural drawings 9-AR to 13-AR and size shall not be leass than 3' x 2'. The information tables (Information Maps) for fire escape shall be as per fire fighting drawings 55-MEP to 58B-MEP and shall not be leass than 3' x 2'. Detail working drawings shall be provided by the selected bidder during construction.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 15:00
Edited by:
webservice@unops.org
New clarification added: Questions:Shall we use 6100kCal/hr instead of 8000-8500kCal/hr (MINOR OT - DENTAL ROOM - NCD ROOM - STAFF ROOM), because wall mounted indoor capacity is up to 6100kCal/hr? Please clarify. Shall we use PVC pipe class 13.5(local made) instead of UPVC PN 10, DIN 8062, because we can’t find as per DIN 8062 standard. Please clarify.In BOQ Item no 12.3, We would like to request the size detail of "STAFF", "VISITOR", "AMBULANCE" for Parking mark. UNOPS Answers:1. Bidder should qouate as specified in the BOQ and Drawings. Selected bidder shall recieve approval of the the air-con equipment during construction as required by the drawings and specification.2. Bidder should use only the specified pipe types that complies with the requirment. Local products can be used if it complies with the contracual requirements. Contractor shall provide test result or manufacturors certificate and seek approval from UNOPS during construction.3. The size of the parking marks should be as indicated in drwings 06AR and should have standard dimensions, visible and fit in each parking lot.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:57
Edited by:
webservice@unops.org
New clarification added: Question:We found in plastering work for the walls and stairs in the interior with gypsum plaster In BOQ Item no.(11.5).Could we use cement plaster instead of gypsum plaster?Please specify the type of plaster.UNOPS Answer:Plastering shall be as specified in the BOQ and drawing. If needed this will be ammended during construction.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:52
Edited by:
webservice@unops.org
New clarification added: Questions:In Returnable Bid Schedule 12, Declaration, What kind of qualification must have to become as ''Authorised Witness'' ? What is the meaning of "UN Global Compact Participant" in the file of DRiVE _ Supplier Substainability Questionnaire Form ? UNOPS Answers:1. In a Declaration, qualification is not specifically required but normally bidder can propose close person of representative. 2. Firstly please read the instruction ,for the Drive Questionnaries tab, please go to G column and every question should be answered with one of perferable answer out of four, mentioining in right coorner of cell with down arrow key staring from G7 until last answer.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:49
Edited by:
webservice@unops.org
New clarification added: Questions:1. In the returnable Bid Schedule 8- d , bank statements mean current month (December 2020) ?2. In the returnable Bid Schedule 8- e , at equipment form, “A separate Form shall be prepared for each item of equipment listed, or for alternative equipment proposed by the Bidder”. How to provide for that?UNOPS Answers:1. We would like to see your statements for at least the past six months. 2. It will be great if you could provide us with seperate document of evidence to your equipment offer mentioned in the equipment form.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:43
Edited by:
webservice@unops.org
New clarification added: Questions:In BOQ Item no 13.2 the information tables for floors and groups,We would like to request the size of this. In BOQ Item no 13.3 the the information tables for rooms,We would like to request the size of this. In BOQ Item no 13.4 the information tables for fire escape routes,We would like to request the size of this.In BOQ ,Item No.17.14 ,Please specify the detail drawing ( size ) for the sign board.Please provied the detail drawing ( The Size of the Steel member )for the emergency stair. (Reference document Drawing No 36-AR)We would like to request more detail drawing for placement pit.Please advise what kind of information shall be provided for the outline of statement mentioned in the returnable bid schedule 11. UNOPS Answers:1.The information tables (Information Maps) for floors and groups shall be as per Architectural drawings and shall not be leass than 3' x 2'2.The information tables (Information Maps) for rooms shall be as per Architectural drawings and shall not be leass than 3' x 2'3.The information tables (Information Maps) for fire escape shall be as per fire fighting drawings and shall not be leass than 3' x 2'4. The size of permanent signboard is (2'-0"x1'-6") as per BoQ.5. The sizes of steel members are shown in drawing, dwg no. 36-AR. UPN240 is (C240x85x9.5x13) and UPN120 is (C120x55x7x9).6. The placement pit detail is as per drawing no. 37-AR.7. The outline statement shall include method statement setting out how you intend to stage and construct the works and coordinate with the local authorities in order to obtain all required authorizations and make sure that the project will be implemented on schedule.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:36
Edited by:
webservice@unops.org
New clarification added: Questions:We found 2-1/2”PE pipe for water supply distribution pipe from underground water tank in MEP drawing: 02-MEP, but not found 2-1/2 PE pipe in BOQ. Please clarify.In Dwg 34 MEP show 400kVA (11/0.4) kV transformer with 100kVAR Capacitor bank. Normally, government could accept 400kVA (11/0.4) kV transformer with 120kVAR/135kVAR Capacitor bank. Please clarify.In BOQ (C-Electrical Installation) 18.27 & 18.28 show DB-X Ray & DB-Lift. But we could not found the single line diagram for DB-X Ray & DB-Lift. Please provide.Shall we use ready-made cast iron cover for underground isolating valve box’s cover? Because we found PVC cover in the drawing: 02-MEP and removable pit cover in specification. Please clarify.We found the flange type gate valve for water supply system in the drawing, but we found use of water supply pipe size is 40mm and 32mm. Flange type is matched for over 50mm pipe and screw type is matched for this pipe size. Please clarify.We found the rain water pipe size 2” in the BOQ (Item No.22.30) and 4” in the drawing (19-MEP). Please clarify.UNOPS Answers: 1. Please refer to 02_MEP and 06_MEP for Main Distribution Pipes from underground water tank to Buildings 1 & 2 with 1-1/4" and 1-1/2" and BOQ item 20.2 & 20.3.2. Contractor need to quote the capacitor bank as per Local Rules and Regulation stated in the BOQ item 18.32.3. The DB -X-Ray should be just only the main breaker for X-ray as per drawing number 27_MEP and DB_Lift should be submitted as per requirement from Lift Supplier.4. Please provide the your price as per detail drawing.5. Please provide the price as per drawing and BOQ.6.Contractor need to provide the price for rain water down pipe as per drawing 19_MEP as stated in the instrument of agreement of General Conditions of contract. The Drawing have precedence over the BOQ.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 14:32
Edited by:
webservice@unops.org
New clarification added: Question:In BOQ Notes Item 7 states "The Contractor shall provide with his Tender submission a detailed breakdown of all priced items of Bills. This breakdown of the items shall be in a format, which also clearly identifies any "Set - Up", "Time Related" and "Dismantling Elements" of the costs". Could you please clarify more what is required to submit? Is that submission required after tender award? Otherwise, is there any format related to that Item 7 available. UNOPS Answer:The cost breakdown will not be required at the time of submission. The bidder shall submit this when requested during or after bid evaluation.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 13:30
Edited by:
webservice@unops.org
New clarification added: Questions:We would like to know……1. estimated commence date of project.2. the issue for removal of squatter building around the project area.3. For precast pile (10”x10”)-108 points, Pile Load Test require or not? If required, how many pile points to test load? In the BOQ item 4.3, Pile Load test cost consider or not?If considered, how many points?4. According to the BOQ item 19.2, Overhead tank requirement is 5000 liters x 10 nos. According to the drawing 05 MEP & 06 MEP, 1000 Liters x 10 nos. Which one must be follow?5. In the BOQ item 10.1 ~10.19, Window specification is a little difference between Provided BOQ and the detail drawing 35-AR. Which one must be follow? And we would like to know the thickness of glass for all slide and fixed windows.UNOPS Answers:1.The project will be commenced immediately after completion of bid evaluattion and award.2. The project is limitted to the compound already fenced. The people staying inside the compound are MOHS staff and will be living immediately after award of the contract. There will be no removal of the people squattering arround the area.3. Individual piles shall comply with the load requirement specified in BOQ Item 4.3. However, CQHP requirements may also apply.4. Please submit your price as required by the BOQ. If needed this will be ammended during construction.5. Please submit your price as required by the BOQ and the thickness of glass varries and is provided in each BoQ item and drawings.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 12:52
Edited by:
webservice@unops.org
New clarification added: Question: I would like to clarify about the a specific document on Tender ITB/2020/18011 which is under Document section (2. ITB_Section_II_Returnable Bid Schedules .docx). The document seems abit different from what I saw in the Pre-Bid Meeting presentation file (words and pages arrangements are very messy in the docx file) which makes it abit hard for us to fill in the file properly. Could you please look into the matter and change a new document file? UNOPS Answer:Thanks you for your information, we had revised and uploaded the new corrected form in the system.Best Regards,MMOC, Procurement Unit
Edited on:
07-Jan-2021 12:48
Edited by:
webservice@unops.org
New amendment added #3: The tender is hereby amended as follow;- Remove an existing document - 2. ITB_Section_II_Returnable Bid Schedules and upload revised correct one.
Edited on:
07-Jan-2021 07:59
Edited by:
webservice@unops.org
New clarification added: Question:Please explain about the returnable schedule7. What information do we need to fill out in this table?UNOPS Answer:The bidder should circle YES if it is going to provide all the three insurance policies for the proejct in the event when selected for this work.Best Regards,MMOC, Procurement Unit
Edited on:
03-Jan-2021 05:23
Edited by:
webservice@unops.org
New clarification added: Questions:1. In the drawing No. 27 -MEP;UPS 3.2 kW Single Line Drawing (2 Nos) was found but cannot find in BOQ. According to provided BOQ, how do for that item in the construction stage?2. In the BOQ No.18.25;Distribution Boards (8 Nos) was found but cannot find in the drawing. Please provide the distribution boards drawing for calculation.3. In BOQ No.18.29 & Drawing No.20,23,24-MEP;Cable Tray is required and please provide us.4. ACMV System, Equipment Schedule is required and please provide us.5. In BOQ No. 4.3 (10” x 10”) Square precast pile was found and then in the Drawing No. 04A STR (Dia. 1’-10”) Circle Pile was found. Please provide pile approval and detail drawing.6. Are Precast Pile controlled by Length or by Capacity?7. In the Returnable Bid Schedule 7 – Insurances, (a) For overall company? (b) For project? (c) Please explain to fill Table form.8. In the Returnable Bid Schedule-1, Serial no. 6 is not required?9. Specification in provided BOQ, do available equivalent specification mention in submitted BOQ?UNOPS Answers:1. UPS 3.2 kW is indciated in the BOQ Item 18.8.2. Please refer to 27_MEP and the distribution boards are for main UPS panel and seperate panles for ELV system (CCTV,PABX,PA,LAN,FR)3. Cable tary is included in the BOQ item 18.29. Bidder should claculate the cable tray size required and quote the price accordingly4. Wall mounted multi split air conditioning system is the only ACMV system for this tender. The BoQ items 23.2 to 23.13 indicates the schedules of these air conditioning systems.5. Please refer to structural drawing 03-B and 04-B for the pile type. The circular pile or drawing 04A is omitted already in the latest drawing in the tender. Only square precast piles are included in the tender and please down load the updated drawings.6. Piles will be controlled by both length and capacity.7. The question is not clear. But the bidder should circle YES if it is going to provide all the three insurance policies for the proejct in the event when selected for this work.8. Bid security is not applicable9. The comment is not clear. However, The bidder should quote for the specified items in each BOQ and should not change or tamper the tender BOQ.Best Regards,MMOC, Procurement Unit
Edited on:
03-Jan-2021 05:11
Edited by:
webservice@unops.org
New clarification added: Questions:According to the information at the Clarifications /Pre bid Meeting on 22 Dec 20 , the tender clarification deadline will accept until 28 Dec 2020. Please confirm the tender clarification date as the date in e-soucring is not yet changes. We would like to attach the file at Request a clarification in UNOP e sourcing. Is it possible to attach ?UNOPS Answers:The tender clarification deadline was extended up to 12:00 pm, Myanmar Time, 8 Jan 2021.Yes, You can also attach in the e-sourcing.Best Regards,MMOC, Procurement Unit
Edited on:
29-Dec-2020 08:59
Edited by:
webservice@unops.org
New amendment added #2: The tender is hereby amended as follow;- Upload pre-bid meeting minutes and presentations.- Extend the ITB to 10 Jan.21.
Edited on:
29-Dec-2020 07:34
Edited by:
webservice@unops.org
New clarification added: Questions:We can’t find sputum production-B(EXT-2)’s location in drawings, but water supply pipe direction to this building in the MEP drawing:02-MEP. Please clarify.We found compressor well pump for tube well in MEP drawing:02-MEP and submersible pump for tube well in the BOQ. Please clarify.Tube well drilling fees is included or not in our scope? We found the tube well in drawing, but not found in BOQ. Please clarify.UNOPS Answers:Please refer to drawing no 38-AR and 6 - AR for location.Please submit your quoatation as specified in the BOQ.Drilling of tube well is included in the BOQ as Item 14.3.Best Regards,MMOC, Procurement Unit
Edited on:
28-Dec-2020 15:36
Edited by:
webservice@unops.org
New clarification added: Questions:May we assume the contractor scope is start from Transformer and the incoming line to Transformer is excluded in drawing No: 34-MEP? Please clarify.May we assume the synchronization Panel and PV System in Drawing No: 34-MEP is not contractor scope? Please clarify.Hoist way size in drawing shown as 1600mm (width) x 1701mm (depth) only. According to our Hitachi standard, 630 kg (8) person (1 person = 75kg) need to get hoist way 1850mm (width) x 1750mm (depth). So, we would like to know can we deviate hoist way size?For PABX System, IKE Brand is described in your provided Schematic Diagram . Please advice can we proposed with other Brand ( eg. NEC ) or not ?For the Data Cabling System, in tender specification that mentioned to use for CAT6E Cable but the schematic diagram mentioned as CAT6A , So Please clarify which type of cable should we need to quote ??For Main DB is included in both drawing No: 27-MEP and drawing No: 34-MEP. But Main Breaker size is different. So, please clarify that issue.Shall we use FRP or PE water tank instead of polyester tank? We couldn’t find polyester tank in local market. Please provide. Water treatment system is included or not in our scope? We found the water treatment system in drawing no:06-MEP, but not found in BOQ. Please clarify.Please provide limestone chip’s specification for Neutralization tank, because we can’t see clearly in drawing:37B-AR. UNOPS Answers:The contractor scope for installation of trasformer includes tapping/connecting to the main electric source all inclusive.PV system is omitted from the scope and 34-MEP is not in the scope of the bidder.This will be decided during construction whether your proposed option has equivalent specification or not. Please follow the Hoist way size in the BOQ for quoatation.Contractor can provide the equivalent specification for PABX system as per specification & drawing and recieve approval during construction. However, bidder should quote for the materials stated in the BOQ.For network cabling system Contractor should follow BOQ item CAT6A.The Main Circuit Rating is 4P,400A, MCCB as per 34_MEP.Contractor should quoate price for polyster tank. However, a tank with quivalent specification of polyester may be accepted during construction subject to prior approval.Water treatement system is not part of the scope of the works at the moment. However, decission will be made during construction depending on the quality test result of the water after tube well drilling. The limestone chips should be 1” - 3” in size and be of irregular pattern to facilitate liquid percolation throughout the limestone bed.Best Regards,MMOC, Procurement Unit
Edited on:
28-Dec-2020 15:31
Edited by:
webservice@unops.org
New clarification added: Questions:We would like to know how many people used for site office and do you need office furniture? If you need these please provide your requirements.Could we propose Gypsum Board instead of sheetrook?Could we get the bridge roof detail Archi drawing ?Could we use local brick instead of ceramic brick?Please specify the detail drawing for waterproofing.In BOQ Item no.9.5 , Please specify the size of foldable single metal door.Please specify the detail of shelding of walls for radiation protection.In BOQ Item 17.11,We would like to know the location of this foldable single metal door.In BOQ Item 7.1,We would like to know the detail drawing for roof finishing procedure.Could you adjust the time between mixing and placing of concrete within 30 minutes that is insufficient for casting time?UNOPS Answers:Office and furniture is required for at least two staff. At the moment there will be no change with the specification. Bidder should quoate as specified.Please see section B-B and Detail A in Archi Drawing No.15_AR.Please submit your price as required by the BOQ and Drawings.There is no detail drawing and please submit your price as required by the BOQ.Please see metal door detail of DOOR_DEXT in drawing No. 35_AR.Please see W4 detail in drawing No.25_AR.This is pedestrain access door beside main gate door and please see drawing No.39_AR.There is no detail drawing and please submit your price as required by the BOQ and the method statement shall be submitted by the bidder.This depends on the type of concrete to be used and will be decided during construction. Best Regards,MMOC, Procurement Unit
Edited on:
28-Dec-2020 15:26
Edited by:
webservice@unops.org
New clarification added: Question:After checking provided BOQ and drawings, there are quantity different between our calculation and provided BOQ quantity. Especially, a lot of quantity different for electrical cabling/wiring. And BOQ item 13.3 and 13.4, information table for rooms and fire escape route quantities are unable to tally with given drawings too. We would like to seek your advise for more information.UNOPS Answer:As indicated in the preamble of the BOQ, the quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. As this is a measured price contract, the basis of payment during implementation will be the actual quantities of work carried out and valued at the rates and prices qouated. Hence, the bidder shoould not alter the quanities at this time and should conly price the unit rate items as indciated in the tender BOQ.Best Regards,MMOC, Procurement Unit
Edited on:
27-Dec-2020 09:02
Edited by:
webservice@unops.org
New clarification added: Question: Due to christmas and new year holidays, we kindly request a time extention to proposal submission. UNOPS Answer:Due to Christmass and New year season, the bid will be extended until 10 Jan 2021.Best Regards,MMOC, Procurement Unit
Edited on:
27-Dec-2020 08:59
Edited by:
webservice@unops.org
New clarification added: Questions:In schedule 3, LOT Number has been asked. Please clarify what is this, as we did not see any Lot in the ITB. Project completion time given in ITB is 12 months from the date of award of contract. Does it include rainy period. Please allow 12 dry working months for successful completion of the Project .Since this is a construction Project and FIDIC system is adopted for contract formation, it will be prudent for Client to allow 10% advance payment, 10% on site mobilisation, 70% against monthly running bills and last 10 % can be retention.Due to Christmas and New Year falling soon and mostly people are on annual leave, we need more time to prepare a compliant and competitive bid. We kindly request you to extend bid submission date by at least 2 weeks. UNOPS Answers:Lot number is not applicable.Not allowed. This is 12 caledar months including the rainy season.Not allowed.Due to Christmass and New year season, the bid will be extended until 10 Jan 2021.Best Regards,MMOC, Procurement Unit
Edited on:
27-Dec-2020 08:56
Edited by:
webservice@unops.org
New clarification added: Question:Can international companies bid on this project.? Or, it's restricted to the local contractors? UNOPS Answer:No restriction, This is an open competitive bid.Best Regards,MMOC, Procurement Unit
Edited on:
23-Dec-2020 10:15
Edited by:
webservice@unops.org
New clarification added: Questions:1. Is it necessary to submit a letter requesting permission for site inspection to the office?2. Do I have to submit through eSourcing for tender competition? Do I still need to submit a hard copy to the office?3. Can I have a contact person or phone number for clarification?4. Who can I ask directly if I have technical questions?UNOPS Answers:1. No. Please contact the following contact person in advance before going to the site. Contact Person - U Min Thu, Officer from Hlaing Thar Yar Public Health Department. Phone:097708090722. Bidder have to submit through e-sourcing. No need to submit hard copies.3. Bidder can send clarification through e-sourcing.4. Bidder can send technical questions/ clarifications through e-sourcing.Best Regards,MMOC, Procurement Unit
Edited on:
23-Dec-2020 08:55
Edited by:
webservice@unops.org
New clarification added: Questions:We would like to have some clarificaiton regarding bid security and site survey.- When we read the document 'Instruction to Bidder' , bid security is mentioned in Returnable Bid Schedule 2 – Form of Bid Security(see Section II), but we see "Form of Bid Secuiry is not used". Therefore, we want to know for sure whether bid security should be provided by us or not.- We would like to make site survey on next week , Monday (21.12.20) or Tuesday (22.12.20). Kindly confirm us site availibility date.UNOPS Answers:- Returnable Bid Schedule 2 - Bid Security is not used/ applicable.- Please contact the following contact person in advance before going to the site. Contact Person - U Min Thu, Officer from Hlaing Thar Yar Public Health Department.Phone:09770809072 Best Regards,MMOC, Procurement Unit
Edited on:
21-Dec-2020 15:45
Edited by:
webservice@unops.org
New clarification added: Question:As per tender particular information, the site visit/ inspection date is 24-Dec-20 with written approval of UNOPS 2 day in advance . We would like to know only able to visit on that day 24-Dec-20 or any other day before 24-Dec-20 with written request. UNOPS Answer: The bidder can able to visit site survey any other day after informing the following contact person in advance before going to the site. (no need written approval more)Contact Person - U Min Thu, Officer from Hlaing Thar Yar Public Health Department.Phone:09770809072 The site is located in Ward 2 of Hlaing Thar Yar Township of Yangon region.Best Regards,MMOC, Procurement Unit
Edited on:
21-Dec-2020 07:47
Edited by:
webservice@unops.org
New amendment added #1: The tender is hereby amended as follow;- Remove an existing documents - Annex 2.2 Structure Drawings and upload revised one as requested by project team.
Edited on:
17-Dec-2020 06:05
Edited by:
webservice@unops.org
New clarification added: Question:May I know site inspection date? UNOPS Answer:Please request written approval to UNOPS for site inspection 2 days in advance.Best Regards,MMOC, Procurement Unit