CANCELLED Small Works for Сonstruction of the Sanitary and Epidemiological Welfare and Public Health Service of Gulistan district, Syrdarya region, Uzbekistan (re-tender 58637)
UNOPS
CANCELLED Small Works for Сonstruction of the Sanitary and Epidemiological Welfare and Public Health Service of Gulistan district, Syrdarya region, Uzbekistan (re-tender 58637)
Invitation to bid
Reference:
ITB/2025/59423
Beneficiary countries or territories:
Uzbekistan
Registration level:
Basic
Published on:
16-Sep-2025
Deadline on:
06-Oct-2025 09:00 0.00
Description
This ITB refers to procurement of Small Works for Сonstruction of the Sanitary and Epidemiological Welfare and Public Health Service of Gulistan district, Syrdarya region, Uzbekistan (re-tender 58637)
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
This procurement opportunity integrates considerations for at least one sustainability indicator. However, it does not meet the requirements to be considered sustainable.
Human rights and labour issues
Social
The tender contains sustainability considerations related to human rights, fundamental principles and rights at work, occupational health and safety, fairly traded goods, targeted employment of people with disabilities, etc.
Local communities, MSMEs and supplier diversity
Economic
The tender contains sustainability considerations regarding local MSMEs, local communities or disadvantaged groups.
Examples:
Reserved labour opportunities for local communities, use of local materials, reserved procurements for local companies
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
95122001
-
Clinic
95122002
-
Nursing home
95122003
-
Operating room or theater
95122004
-
Intensive care unit
95122005
-
Diagnostic screening room
95122006
-
Fluoroscopy room
95122007
-
Pathology room or laboratory
95122008
-
Catheter room
Tender cancelled on 2025-10-24 10:17 UTC. This ITB/2025/59423 is finalized with no results since no substantially compliant bids received. For any inquiries, please contact Malika ABDUSALYAMOVA. Email: MalikaA@unops.org, Phone: Uzbekistan 712051255
Edited on:
24-Oct-2025 12:17
Edited by:
webservice@unops.org
New amendment added #2: This ITB is further amended to extend the bid closure date until 6 October 2025.
Edited on:
03-Oct-2025 06:26
Edited by:
webservice@unops.org
New clarification added: Q2: Following the analysis of the BOQ and project documents for ITB/2025/59423 (ex ITB/2025/58637): Construction of the Sanitary and Epidemiological Welfare and Public Health Service of Syrdarya region, Gulistan city (Uzbekistan), discrepancies have been identified in the works listed below. We kindly request your practical assistance in addressing these inconsistencies between the BOQ and the project documents.CERAMIC36. Installation of polyethylene film vapor barrier layer - According to the architectural design album, (sh. 12) the volume is 49.61 m2, but the BOQ includes 640.52 m2.37. Installation of waterproofing with roll-on membrane materials on bitumen mastic, first layer /2 layers/ - According to the architectural design album, (sh. 12) the volume is 542.42 m2, but the BOQ includes 492.8 m2.38. Installation of cement screeds, 20 mm / 40 mm thick - According to the architectural design album, (sh. 12): screed – 1035 m², 40 mm thick. In the BOQ – 542.42 m², 30 mm thick.39. Installation of sand-cement screeds, 20 mm thick - According to the architectural design album (sh. 12), a sand-cement screed is provided - 625.22 m2. This work volume is not included in the BOQ.CEILINGS 1-2-3-ST FLOOR40. Installation of suspended ceiling with Knauf gypsum board panels on metal supporting structures - According to the architectural design album, (sh. 11), 936.5 m² of gypsum board ceilings are provided (566.76 m² GKLW, 369.75 m² GKL). In the BOQ, 896.7 m² of GKL is specified.Bill No 3: Mechanical BOQVENTILATION41. Installation of air ducts made of galvanized sh. steel and aluminum, class N (normal), 0.5 mm thick, perimeter up to 600 mm - In the project, 46.4 m² of air ducts with 0.7 mm thickness are specified. In the BOQ, all air ducts are listed as 0.5 mm thick.Bill No 5: Electrical BOQFIRE ALARM42. Fire detectors: automatic smoke, photoelectric, radioisotope, and light type in normal operation - In the project, 70 detectors are specified. In the BOQ – 65 units.Bill No 6: Master Plan BOQCONCRETE COATINGS43. Construction of single-layer cement concrete pavements using light mechanization - In the project, the concrete layer thickness is specified as 140 mm. In the BOQ – 100 mm.BLIND AREA 44. Construction of concrete blind areas, 50 mm thick - According to the project – 34.2 m². In the BOQ – 11.4 m².45. Construction of bedding layers of crushed stone, 50 mm thick - According to the project – 1.71 m³. In the BOQ – 0.57 m³.METAL FENCING 93M46. Construction of strip concrete foundations - According to the project – 11.16 m³. In the BOQ – 6.3 m³.47. Installation of waterproofing for vertical surfaces: single-layer bituminous coating on leveled brick and concrete surfaces - According to the project – 37.2 m². In the BOQ – 21.7 m².48. Cost of steel pipe, diameter 50×4 mm - According to the project – 141 kg. In the BOQ – 73.16 kg.METAL GATES49. Installation of frames for large-span buildings, hangars, etc., without lifting mechanisms - According to the project – 1.2743 t. In the BOQ – 0.08288 t.50. Profile TR20 - According to the project – 0.7243 t. In the BOQ – 0.48286 t.51. Metal sheet 50×5 - According to the project – 0.165 t. In the BOQ – 0.129 t.52. Profile TR16 - According to the project – 0.163 t. In the BOQ – 0.0543 t.53. Angle 50×50×5 mm - According to the project – 0.222 t. Not included in the BOQ.Bill No 8: Chekpoint BOQARMHOLE54. Installation of metal doors in prepared openings with an area of more than 2.5 m² - According to the project – 8.1 m². In the BOQ – 4.05 m².Porch55. Construction of strip concrete foundations - According to the project – 3.13 m³. In the BOQ – 1 m³.56. Installation of railings and fences - According to the project – 14.4 m. Not included in the BOQ. Bill No 10: Warehouse for vaccine BOQFOUNDATIONS57. Reinforcement for monolithic reinforced concrete structures in the form of meshes and flat frames, deformed profile, grade A-III, diameter 12 mm - According to the project – 266.6 kg. In the BOQ – 20.5 kg.RELIN FLOORS58. Installation of cement screeds, 20 mm thick - According to the project, the screed thickness is 40 mm. In the BOQ – 20 mm.59. According to the project, a porch and ramp are provided. They are not included in the BOQ.PAVEMENT60. Construction of concrete bedding layers - According to the project, the blind area volume is 7.47 m³ with reinforcement mesh. In the BOQ – 2.49 m³ without reinforcement mesh.61. Facade cladding with decorative panels of the "Tunkuafon" type: on a prepared frame - According to the project, the "Tunukafon" cladding volume is 17.2 m². In the BOQ – 8.58 m².Bill No 11: Toilet BOQINTERIOR FINISH62. Plastering of surfaces with cement-lime mortar on stone and concrete, improved, walls - According to the project, the plastering volume is 30.66 m². In the BOQ – 9.45 m².63. Improved painting with oil-based compositions on wall plaster - According to the project, the painting volume is 18.9 m². In the BOQ – 9.45 m².64. In the project, 11.76 m² of tiles are provided. They are absent in the BOQ. “Canopy/Shelter for Diesel Generator.”65. “Steel square pipes, GOST 8639-82. Size: 80×80 mm. Wall thickness: 3.0 mm / Weight = 7.35 kg.” - The quantity of work is incorrectBill No 9: Cesspool BOQ66. The quantities of work presented in the BOQ do not correspond to the works specified in the project.Bill No 7: Externals BOQ67. 10KV POWER LINE NETWORKS. The project specifies 6 units of RVO-10 vented surge arresters, but they are not included in the BOQ. The project also specifies 8 meters of asbestos-cement pipe, which is not included in the BOQ.A2: Given that this is a lump sum contract, the BOQ primarily serves for payment definitions rather than defining the scope. The design details should prevail, and all associated costs must be included in the financial proposal. The bidders shall not revise the quantities as noted in the BOQ and add / delete cost items.
Edited on:
29-Sep-2025 08:42
Edited by:
webservice@unops.org
New clarification added: Q1: Following the analysis of the BOQ and project documents for ITB/2025/59423 (ex ITB/2025/58637): Construction of the Sanitary and Epidemiological Welfare and Public Health Service of Syrdarya region, Gulistan city (Uzbekistan), discrepancies have been identified in the works listed below. We kindly request your practical assistance in addressing these inconsistencies between the BOQ and the project documents.Bill No 1: Structural BOQ.EARTHWORKS.1.EXCAVATION OF SOIL INTO A DUMP BY EXCAVATORS WITH A BUCKET WITH A CAPACITY OF 0.65 - According to the structural design album (sheet 3), 1336.73 m³ is provided. The BOQ specifies 1247.43 m³.2. MOVING SOIL BY BULLDOZERS - According to the structural design album (sh. 3), 1336.73 m³ is provided. The BOQ specifies 1247.43 m³3. EXCAVATION WITH LOADING ON DUMP TRUCKS BY EXCAVATORS - According to the structural design album(sh. 3), 491.67 m³ is provided. The BOQ specifies 780.46 m³.4. MANUAL SOIL REFINEMENT - According to the structural design album (sh. 3), 182.4 m³ is provided. The BOQ specifies 62.3 m³.5. Construction of soil cushion with layer-by-layer compaction by mechanical method - This work volume is indicated in the structural design album (sh. 3) but is not included in the BOQ.6. Transportation of gravel for soil cushion (70%) - This work volume is indicated in the structural design album (sh. 3), but the transportation works and gravel material are not included in the BOQ.7. Local soil (loam) used at 30% - This work volume is indicated in the structural design album (sh. 3), but is not included in the BOQ.8. Excavation of gravel with loading onto dump trucks by excavators - This work volume is indicated in the structural design album (sh. 3), but is not included in the BOQ.9. Backfilling of foundation pits with bulldozer - According to the structural design album (sh. 3), 336 m³ is provided. The BOQ specifies 746.6 m³.10. Manual filling under floors - According to the structural design album (sh. 3), 696.5 m³ is provided. The BOQ specifies 746.6 m³.11. Compaction of soil by mechanical methods - According to the structural design album (sh.3), 1032.5 m³ is provided. The BOQ specifies 1247.4 m³.12. Dewatering of excavation pit - This work volume is indicated in the structural design album (sh.3), but is not included in the BOQ.STRIP FOUNDATION13. CONSTRUCTION OF CONCRETE STRIP FOUNDATIONS IN 20 /SSC/ - According to the structural design album (sh. 6), 75.7 m³ is provided. The BOQ specifies 72.2 m³.14. Installation of waterproofing with roll-on membrane materials on bitumen mastic, first layer - According to the structural design album (sh. 6), 378.5 m² is provided. The BOQ specifies 306.2 m².15. Foundation for partition wall - This work volume is indicated in the structural design album (sh.9), but is not included in the BOQ.16. Two-layer coating bituminous waterproofing - This work volume is indicated in the structural design album (sh.9), but is not included in the BOQ.COVERING AND COATING 17. Floor slabs 1 PC 59.10-8АШВ-С8 - According to the structural design album (sh.s 31, 33, 35) there are 8 units, while the BOQ 15 units.18. Floor and roof slabs 1PC 62-10-6АШV-C8 - According to the structural design album, (sh.s 31, 33, 35) there are 0 units, while the BOQ 6 units.19. Floor slabs 1PC 71.10-8АШV-C8 - According to the structural design album, (sh.s 31, 33, 35) there are 12 units, while the BOQ 6 units.MONOLITHIC STAIRCASE20. Installation of beams for floor slabs, crane beams, and tie beams at a height from the support platform up to 6 m, with beam height up to 500 mm, made of concrete grade B20 - According to the structural design album (sh. 28), the volume is 1.06 m³, but the BOQ includes only 0.53 m³.21. Hot-rolled deformed reinforcing steel of grade A-III, diameter 20 mm - According to the structural design album (sh. 28), the volume is 0.166 t, but the BOQ includes only 0.083 t.22. Hot-rolled smooth reinforcing steel of grade A-I, diameter 8 mm - According to the structural design album (sh. 28), the volume is 0.04181 t, but the BOQ includes only 0.02092 t.23. Hot-rolled deformed reinforcing steel of grade A-III, diameter 16 mm – anchor - According to the structural design album (sh. 28), the volume is 0.03476 t, but the BOQ includes only 0.01738 t.ROOF24. Installation of leveling cement-sand screeds, 15 mm thick - According to the structural design album, (sh. 38) a screed with a thickness of 40 mm using mortar grade M-150 is provided. In the BOQ, a screed with a thickness of 16 mm using mortar grade M-100 is specified.PORCH KR-225. Construction of gravel foundation base - According to the structural design album, (sh.s 41, 42) the volume is 1.44 m3, but the BOQ includes only 0.99 m3.26. Filling under floors – According to the structural design album, (sh.s 41, 42) the volume is 2.96 m3, but the BOQ includes only 2.13 m3.27. Soil compaction with pneumatic rammers, soil group 1, 2 – According to the structural design album (sh.s 41, 42) the volume is 2.96 m3, but the BOQ includes only 2.13 m3.28. Construction of monolithic porch made of concrete grade B12.5 – According to the structural design album (sh.s 41, 42) the volume is 9.55 m3, but the BOQ includes only 6.65 m3.29. Construction of platform coverings made of granite slabs – According to the structural design album (sh.s 41, 42) the volume is 8.4 m2, but the BOQ includes only 6.06 m2.30. Facing of steps and risers with granite slabs, 20 mm thick – According to the structural design album (sh.s 41, 42) the volume is 8.7 m2, but the BOQ includes only 5.8 m2.31. Facing of walls with polished granite slabs, 40 mm thick - According to the structural design album (sh.s 41, 42) the volume is 11.6 m2, but the BOQ includes only 8.05 m2.32. Installation of chrome-plated metal railings for porch and ramp - According to the structural design album (sh.s 41, 42) the volume is 15.6 m, but the BOQ includes only 10.8 m.Bill No 2: Architectural BOQ.EXTERIOR FINISHING.WALL33. Plain plastering - According to the architectural design album, (sh. 7), facade plastering is provided. This work volume is not included in the BOQ.INSTALLATION OF PAVEMENT34. Construction of crushed stone layer impregnated with bitumen, 100 mm thick – According to the architectural design album, (sh. 7), the blind area should be constructed with a crushed stone layer impregnated with bitumen, 100 mm thick, and a concrete layer 120–150 mm thick with reinforcement mesh. In the BOQ, gravel and asphalt layers are specified.Floor (Italo granite)35. Installation of polyethylene film vapor barrier layer - According to the architectural design album, (sh. 12) the volume is 168.99 m2, but the BOQ includes only 128.5 m2.A1: Given that this is a lump sum contract, the BOQ primarily serves for payment definitions rather than defining the scope. The design details should prevail, and all associated costs must be included in the financial proposal. The bidders shall not revise the quantities as noted in the BOQ and add / delete cost items.
Edited on:
29-Sep-2025 08:42
Edited by:
webservice@unops.org
New amendment added #1: This ITB is amended to upload Minutes of the Pre-Bid Meeting held on September 19, 2025.
Edited on:
21-Sep-2025 11:08
Edited by:
webservice@unops.org