Rehabilitation of IBB Road Part I & Part II - IBB - Yemen
UNOPS
Rehabilitation of IBB Road Part I & Part II - IBB - Yemen
Request for quotation
Reference:
RFQ/2024/54485
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
07-Nov-2024
Deadline on:
04-Dec-2024 09:00 (GMT 0.00)
Description
Rehabilitation of IBB Road Part I & Part II - IBB - Yemen:
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
- IUS-AF2-RMF-IBB-004 - Rehabilitation of IUS-AF2-RMF-IBB-004 composed of two parts Part 1 length(-2,200 m) starting from telecommunication roundabout till Saylat Jiblah ,Part II- length is (3,120 M) includes the rehabilitation of the remaining damages not covered during phase 1 from Audain RA to communication RA, total length IUS-AF2- RMF-IBB-004 for both two parts is 5.4 KM, the rehabilitation works will cover environmental , earth works and pavement, drainage improvements and roads safety works.
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72103301
-
Parking lot or road maintenance or repairs or services
New amendment added #3: The purpose of this amendment is:Upload the prebid meeting mintues. Exntesnion of the deadline to 04 Dec 2024 Therefore please note the following changesA- The e-sourcing document tab is amended to add -Prebid meeting mintues. B- Esourcing General tab General tab - Tender deadline extension to 04 - Dec -2024 All other terms and conditions remain the same.
Edited on:
01-Dec-2024 07:15
Edited by:
webservice@unops.org
New clarification added: All Clarificaitons have been answered
Edited on:
26-Nov-2024 11:05
Edited by:
webservice@unops.org
New clarification added: Dear Bidder Q1 - we have Inquiry about the itm in BOQ is the unit of measurement in lenght meters correct in item no 3.6 Implementation of a protective net,also the quantity of item 70 ?Ans 1 - Yes the unit of measurement is in meters linear meters, the quantity is 70
Edited on:
24-Nov-2024 07:08
Edited by:
webservice@unops.org
New amendment added #2: The purpose of this amendment is:Update the BoQ for the following items : 5.2.1 - Provide a rented site office , housing and accommodation for the Engineer staff as specific Specification , Monthly to change the quantaties to read as 6 Months 5.2.2 - Provide two vehicles for the Engineer staff including operation cost such as , fuel , oil , lubricants, Driver , insurance , and maintenance…Etc. as describe in specification , Monthly to change the quantaties to read as 6 Months Therefore please note the following changes The e-sourcing document tab is amended to add Amendment_002_BOQ-IBB-004All other terms and conditions remain the same.
Edited on:
22-Nov-2024 07:39
Edited by:
webservice@unops.org
New clarification added: Dear BiddersPlease find below clarifications answersQ1.Does the project include two parts simultaneously or at different intervals? and is BOQ For two parts ! Why is the project length inconsistent (2.2 km in drawings vs. 5.4 km in the announcement)?Ans 1 The project includes two parts part 1 from telecommunication to saylat jiblah 2.2 Km rehabilitation of this section completely , Par II is the the rehabilitation of the remaining works not included in phase 1 scope of works within 3.2 Km please refer to the Plan which clearly show these two sections within the whole road from Aluadin Roundabout to saylat jiblah- Please read RFQ and the drawings Reference RFQ1.1 details provided by employer and 2.2 schedule 2 project specific information (projects’map)Q2.In BOQ (1.1.1) ,The type and extent of debris (e.g., size and type of stones, soil) are not defined.Ans 2 The Item includes all types of wastes regardless of size or type to be cleaned and transported to the approved landfill , Reference Specifications 201section for cleaning of pavement,side walks ,and median islands3.In BOQ (1.1.2), should we repeat the cleaning and removing damages each time damages or only for one time.Ans 3 Cleaning includes removing any wastes during implementation till completion of the project .Reference Specifications 320 and A1-1.1of CULVERT CLEANING ,location coordinates are shown in the BoQ item description .4.In BOQ (2.2.1) ,what do you mean by Surface Repairs (Type A) or Deep Repairs(Type B) ,also these items below is mentioned in separate item why is exist in this item1-Potholes and Failure Repairs > 25m22-Removal of existing (Asphalt + Base) layers with disposal and hauling of waste material to the approved location. The rate includes Bed preparation by scarifying and compacting.Ans 4 - Please read each item's components carefully since every item is well described in detail , in addition read the related specifications in the column of technical specification reference for more clarifications .Reference Specifications sections 501- to 514 Bituminous Pavement Works section includes all information of pothole repair types and repair methods and all other items related to pothole repair surface or deep types.5.In BOQ (3.1.1) : type of soil , the places and cross sections of excavation is not mentionedAns 5 - Please read the drawings where concrete pavement is required to be placed . It is for item 3 containing three subitems for the same job for the existing damaged places regardless of the soil type Reference Specifications sections 501- to 514 Bituminous Pavement Works section 6.In BOQ (3.1.2) :there is no any wall protections mentioned in the drawingsAns 6 - There is no wall protection walls in either part 1 or part 27.In BOQ (3.6): The required dimensions, material specifics, and slope of the channels are not provided.Ans 7- 3.6 Item scope is only supply and installation of steel grating to cover the existing diverting channel as per the drawing. Reference Specifications section 709 -cast Iron storm water Cover drawing details part 1- D-5 sheet No.54Q8.In BOQ (5.2.1&5.2.2): the duration given is 15 month whereas in 6 Solicitation Part 2: Proposed methodology, approach and Implementation plan (3.2) given 6 months.Q8 - An amendment will be published soon to reflect the correct requirment
Edited on:
22-Nov-2024 05:38
Edited by:
webservice@unops.org
New amendment added #1: The purpose of this amendment is:Update Amendment1_Small Works - 6 Solicitation - RFQ 04 Sections II, III, IV, V 1. FORMAL AND ELIGIBILITY CRITERIA updated to read as " 1.6 The bidder has presence in Yemen Bidders originating from countries other than Yemen are required to appoint or have a local representative. In case the bidder is not registered to operate in the Yemen, the company should have a local representation with valid business registration in Yemen'' Update Amendment1_Small Works - 6 Solicitation - RFQ 04 Sections II, III, IV, V - 3 TECHNICAL CRITERIA to read as ' 3.4 Gender Action plans (GAPs) as well Bidder confirms Sexual Exploitation and Abuse and Harassment Response and Prevention Action plans (SEAH PRAP). Amendment1_Small Works - 6 Solicitation - RFQ 04 Sections II, III, IV, V 1. to read as '' 4.2 Performance Security '' to read as amount 5% of the Contract PriceAmendment1_BOQ-IBB-004 - Updated 17 Nov 2024 to read as '' items 3.6 update to read as follows ''supply and installation of heavy duty steel grating cover to the existin Channel unit price shall include material , accessories , workmanship, and all other related costs as per drawings and details '' Therefore please note the following changes : A- The e-sourcing document tab is amended to addAmendment1_Small Works - 6 Solicitation - RFQ 04 Sections II, III, IV, V.Amendment1_BOQ-IBB-004 - Updated 17 Nov 2024. Amendment1_GS04 PSEAH Specific Guidance for Contractors ENB- Esourcing ParticularesUpdate Evaluation method details in Particalures tab to remove ''In case of joint venture please note the following: Each entity of the joint venture must meet all criterion under the Eligibility. All joint venture members combined must meet qualification criterion. '' All other terms and conditions remain the same.
Edited on:
18-Nov-2024 05:54
Edited by:
webservice@unops.org
New clarification added: Dear BiddersQ1 Regarding the RFQ Item No. 3.6 "Diverting Channels" I believe that the item description was not fully written, what is the works that includes the rate?! Ans 1- Please refer to Amendment1_BOQ-IBB-004 - Updated 17 Nov 2024, adding the needed detials to the BoQ '' Note the amedment will shortly appear in the system'' Q2- Could you please provide typical cross section for the diverting channels showing the materials , layers, thicknesses and dimensions? Could you please provide more details and domensions about the rain water catch cover? The drawings are not clear? Ans 2 - The existing diversion channel only need to replace 50 m of the steel grating cover only no need for any rehabilitation to the chnnel itself , so all bidders shall only submit their prices only for supply and installation of the channel steel cover , please consider the previous clarification deleted and all bidders shall submit for supply and install only 50 m of steel grating cover as per drawings and details
Edited on:
17-Nov-2024 15:12
Edited by:
webservice@unops.org