Construction, Supply, Delivery and Installation of Solar Pumps/Systems as applicable to the various lots in multiple locations in Yemen
UNOPS
Construction, Supply, Delivery and Installation of Solar Pumps/Systems as applicable to the various lots in multiple locations in Yemen
Request for quotation
Reference:
RFQ/2023/49456
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
23-Nov-2023
Deadline on:
20-Dec-2023 07:30 (GMT 0.00)
Description
Construction, Supply, Delivery and Installation of Solar Pumps/Systems as applicable to the various lots in multiple locations in Yemen
------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS” here
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
26131507
-
Solar power plants
New amendment added #2: * Add tabs to add the documents "Filled and signed copy of technical questionnaire for lots (1&2)"* Add a tab to add the document "Filled and signed draft ESMP for lot 4"* All other terms and conditions remain the same
Edited on:
13-Dec-2023 09:44
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised question and our official response in connection to the Request for Quotation, ref. RFQ/2023/49456 :Question 1: we noticed in the vendor submission section, the window of documents check:1- In lot 2 there is no zone to submit the technical questionnaire. 2- In lot 3 there is a zone added by mistake for Filled and signed draft ESMP for lot 4.please advise how to submit our forms with them.Answer 1: Although in each tab you can submit more than one document, we will add tabs for theseQuestion 2: Through our review of the tender files, it was found that the solar inverter required in LOT 4 inverters, 75 kw, ON grid inverterswhile in the tables of quantities for the tender and in the specifications file for Off-grid inverter. Please inform us or amend so that the data is correct.Answer 2: Kindly note that the required is grid string solar inverter. The (OF) in the BOQ is used as a conjunction to link the words in the sentence.
Edited on:
11-Dec-2023 08:15
Edited by:
webservice@unops.org
New amendment added #1: * Amend BOQ for lot (1) to read as the following:1- Delete the columns for Brand, Model, and Origin*Amend BoQ for Lot (2) to read as the following:1- - Delete the columns for Brand, Model, and Origin* Amend BOQ for lot (4) to read as the following:1- Add the following description "ACB as shown in drawings" under item (7) of the Electrical - Solar & LV system2- Add item no. (13) with the following description "solar Hybrid Controller Supply, install, test and commission of solar Hybrid controller complete system with all required accessories and materials to complete the work as per manufacturer instructions, Drawings and Technical specifications; the controller must include but not limited to: • have the ability to communicate 3 Diesel Generators not Synchronize • have the ability to communicate and full control of PV solar energy to gride network.* Amend the technical questionnaire for lot (4) to read as the following:1- Amend the item 12- Solar Hybrid Controller2- Amend the item 13- Monitoring and Logging* Amend the drawing document to reflect the changes* Amend the technical Specification_Elec. Part_MAR-007 document to reflect the changes* Extend the clarification deadline to 11/12/2023* Extend the tender deadline to 20/12/2023* All other terms and conditions remain the same
Edited on:
07-Dec-2023 10:39
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised question and our official response in connection to the Request for Quotation, ref. RFQ/2023/49456 :Question 1: In lots 2,4,5 technical specifications you stated that the solar PV panel rating should be at least that specified in the technical drawings;), Could you please clarify what you meant by that, noting there is no specified rating in the technical drawing; the rating is already mentioned in the technical specs.Answer 1: Please refer to the drawing it stated clearly the following # Group String x # PV panel x capacity of each PV panel XXX in W. which total equal to the Solar PV panel rating for all lots in BoQ item (1) Solar power module.Question 2: In lot (4)- Clarifications required about NEW MDB panel: - Please specify the type of breakers, which are MCCB and which are ACB. - Are all outgoing circuit breakers motorized?Answer 2: Please refer to the amended Lot 4 Electrical drawing, BoQ, and Technical specification and technical questionnaireQuestion 3: Clarifications required about NEW EL-DB motherboard: - Please specify type of breakers, which are MCCB and which are ACB.- Is a mechanical interlock required for four ACB breakers? Mechanical interlocks can be made for a maximum of three ACB breakers. - MCCB breakers. A mechanical interlock can be made for two breakers only.Answer 3: please refer to the amended Lot 4 Electrical drawing, BoQ, and Technical specification and technical questionnaire, Question 4: LOT4 Look at sheet 3 in the DrawingsClarifications required about NEW MDB panel: - Please specify type of breakers, which are MCCB and which are ACB. - Are all outgoing circuit breakers motorized?Answer 4: please refer to the amended Lot 4 Electrical drawing, BoQ, and Technical specification and technical questionnaire,Question 5: Clarifications required about NEW EL-DB motherboard: - Please specify type of breakers, which are MCCB and which are ACB.- Is a mechanical interlock required for four ACB breakers? Mechanical interlocks can be made for a maximum of three ACB breakers. - MCCB breakers. A mechanical interlock can be made for two breakers only.Answer 5: please refer to the amended Lot 4 Electrical drawing, BoQ, and Technical specification and technical questionnaire,Question 6: for the Nissab well in Shabowa you mentioned the "Surface Booster Pump and Motor"in the technical specification for Lot 1 while in the BoQ not mentioned.Answer 6: it is not mentioned. Kindly refer to the RFQ scope of work and BoQ
Edited on:
07-Dec-2023 09:11
Edited by:
webservice@unops.org
New clarification added: Dear Bidder, Please note the below-raised question and our official response in connection to the Request for Quotation, ref. RFQ/2023/49456 :Question 1: In technical specifications, you stated that (Solar PV panel rating should be at least that specified in the technical drawings;) , Could you please clarify what you meant by that, noting there is no specified rating in the technical drawing; the rating is already mentioned in the technical specs.Answer: The tender is for 5 lots with five technical specifications, can you please clarify which lot you are referring to?
Edited on:
26-Nov-2023 08:23
Edited by:
webservice@unops.org