Request for Quotation for supply of Assorted Construction Materials for the CUF Project in Liberia under Global Resilience Programme
UNOPS
Request for Quotation for supply of Assorted Construction Materials for the CUF Project in Liberia under Global Resilience Programme
Request for quotation
Reference:
RFQ/2021/20054
Beneficiary countries or territories:
Liberia
Registration level:
Basic
Published on:
14-May-2021
Deadline on:
27-May-2021 12:00 0.00
Description
Procurement of services for the supply of Assorted Construction Materials for the CUF Project in Liberia under Global Resilience Programme
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
-----
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
22101501
-
Front end loaders
22101502
-
Graders
22101504
-
Pile drivers
22101505
-
Rollers
22101507
-
Tampers
22101508
-
Trenching machines
22101509
-
Backhoes
22101511
-
Compactors
22101513
-
Draglines
22101514
-
Dredgers
22101516
-
Ditchers
22101518
-
Elevating scrapers
22101519
-
Twin engine open bowl scrapers
22101520
-
Twin engine elevating scrapers
22101521
-
Pulled scrapers
22101522
-
Track bulldozers
22101523
-
Wheel bulldozers
22101524
-
Mobile excavators
22101525
-
Wheel excavators
22101526
-
Track excavators
22101527
-
Integrated tool carriers
22101528
-
Wheel loaders
22101529
-
Skid steer loaders
22101530
-
Open bowl scrapers
22101531
-
Snow blowers
22101532
-
Track loaders
22101533
-
Treedozers
22101534
-
Combat earthmovers
22101535
-
Pile extractor
22101536
-
Tire washer
22101537
-
Concrete pile cutter
22101538
-
Snow plow
22101539
-
Earthmoving machinery parts and accessories
22101632
-
Paint Stripping Machine
22101633
-
Pavement Crack Sealing Equipment
22101700
-
Heavy equipment components
22101800
-
Aerial lifts
22101901
-
Concrete mixers or plants
22101909
-
Slurry Machine
22102000
-
Building demolition machinery and equipment
New clarification added: Question 6. Form B. Price ScheduleThere are two columns Unit Price and Total PriceIn the column for Unit Price, can we add all the Unit prices to make one figure and fill it in that column?Answer 6; Please enter unit prices for each line item Question 7: In the column for Total Price can we multiply the Unit Price against the quantity add all the Total to make one figure as Total Price and fill it in that Column?Answer 7: That is correct Question 8: Or do we have to copy and paste the entire excel details including Description, Unit and prices and insert in the price schedule? If this becomes the case the spaces in the Price Schedule may not be able to take all the data.Answer 8: Please attached an excel sheet with your prices and in the Price schedule form you can just mention the total price and sign it and submit the same.
Edited on:
25-May-2021 10:44
Edited by:
webservice@unops.org
New clarification added: Question 04: Kindly note our request for clarification we submitted earlier today was reffering to the Schedule of Requirments Excel/Pdf if we can include our company leter head or we should just complete the the form with prices, Stamp and Sign.Answer 04; The schedule of requirements does not have to be stamped, signed and submitted. This excel sheet is to show the requirements and bidders are requested only to complete the Form B and submit the same as mentioned in the clarification# 03. Question 05: Form B. Price Schedule Form the instructions in Unit Price Column is to Insert details in the excel sheet and attach with the bid, do we have to fill in the details in the excel or we fill in the Total Unit price? The Column for TOTAL Price is clear for us. Kindly clarfy on the cloumn for Unit Price. Answer 05: Please note the column unit price is price of each unit of the product and multiplied by the quantity will result in the total price. Total price = unit price x quantity.
Edited on:
21-May-2021 16:25
Edited by:
webservice@unops.org
New clarification added: Question 03: Price Schedule Form: Can we include our Company Letter head on the excel / pdf or we should just complete the quotation prices stamp and sign? kindly clarify for us.Answer 03: The bidders can use their company letter head in the excel or pdf and sign and stamp the price schedule form and submit as part of the mandatory documents.
Edited on:
21-May-2021 16:18
Edited by:
webservice@unops.org
New clarification added: Question 01. Under the Material Cost for repair of existing Shed for Fish Transaction - King Gray Town item No. 2 Galvanized Pipe, Kindly clarify the of the sizeto enable us quote accordingly.Answer 01: Please see revised schedule of requirements with the specifications for Item 02 under Shed of Fish transaction - King Gray Town sheet. Question 02. Under the Material Cost for repair of existing Cold Storage Facility - King Gray Town kindly clarify if we can quote for the Materials only from item No.1 to 59 or if it is mandatory that we must also quote for item No. 60 (Repairs of existing overhead Water Tower and Tank/poly tank new)Answer 02: Please see revised schedule of requirements with the specifications for Item 59 (previously item 60) under Cold storage Facility - King Gray Town sheet.
Edited on:
20-May-2021 13:16
Edited by:
webservice@unops.org
New amendment added #1: Revised Section II - Schedule of requirements.
Edited on:
20-May-2021 12:15
Edited by:
webservice@unops.org