Construction of Kitchen in Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka.
UNOPS
Construction of Kitchen in Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka.
Invitation to bid
Reference:
ITB/2021/19652
Beneficiary countries or territories:
Sri Lanka
Registration level:
Basic
Published on:
15-Apr-2021
Deadline on:
03-May-2021 12:30 0.00
Description
Tender description: Construction of Kitchen in Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka.
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72101501
-
Handyman services
72101504
-
Disaster proofing or contingency services
72101505
-
Locksmith services
72101506
-
Elevator maintenance services
72101507
-
Building maintenance service
72101508
-
Floor cleaning services
72101509
-
Fire protection system and equipment maintenance or repair service
72101510
-
Plumbing system maintenance or repair
72101511
-
Air conditioning installation or maintenance or repair service
72101512
-
Hoist construction service
72101513
-
Offsite construction service
72101514
-
Refuse area construction service
72101515
-
Subsidence service work
72101516
-
Fire extinguisher inspection maintenance and repair service
72101517
-
Portable generator maintenance and or repair service
72101518
-
Portable generator rental service
72101519
-
Gas fitting installation service
72101520
-
Roof framing service
72101521
-
Building framing service
New clarification added: Q3:LOT 02;Pg No 13 of 28BOQ Item No-4P6.1 - Supply & Installation of 20A 4P Isolator in Metal Enclosure fixed on wall, wired in Radial Circuit from respective Consumer unit using 2x4mm2 Cu/PVC/PVC cable with 4mm2 Cu/PVC(E) earth wire as shown in layout drawings.(Through surface GI Conduit) .Question : In BOQ Item 4P6.1 For 20A 4P Isolator wiring , it mentioned the cable as 2x4mm2 Cu/PVC/PVC cable with 4mm2 Cu/PVC(E) earth wire. Is This Cable is Correct?BOQ Item No-4P6.1 - Supply & Installation of 32A 4P Isolator in Metal Enclosure fixed on wall, wired in Radial Circuit from respective Consumer unit using 2x6mm2 Cu/PVC/PVC cable with 6mm2 Cu/PVC(E) earth wire as shown in layout drawings.(Through surface GI Conduit) .Question : In BOQ Item 4P6.1 For 32A 4P Isolator wiring , it mentioned the cable as 2x6mm2 Cu/PVC/PVC cable with 6mm2 Cu/PVC(E) earth wire. Is This Cable is Correct?A3- Updated through Adendum 1.Q4: Can you extend the submission date pleaseA4: Extended through Adendum 1.
Edited on:
29-Apr-2021 18:40
Edited by:
webservice@unops.org
New amendment added #2: Upload the revised BoQ( Lot No 2) and extend the bid closing deadline. The relevant Contract provisions indicated below are amended to read as follows;Lot 2 Bill of Quantity under Documents:ITB_Minor_work _Construction_Contract_Section_VII_LOT 02_Bills Of Quantity_Revision 1 with ITB_Minor_work _Construction_Contract_Section_VII_LOT 02_Bills Of Quantity_Revision 2Note: BOQ Items No-4P6.4 & 4P6.5 has revisedBid deadline for clarifications & deadline Deadline for clarifications2021-04-30 06:30 UTC Deadline2021-05-03 12:30 UTC
Edited on:
28-Apr-2021 09:54
Edited by:
webservice@unops.org
New clarification added: Q1- Please be kind enogh to clarify the laying method of fiber optic cable from existing DER to new building(LOT 2 - 5Q.1.1). If it lay under ground, should it lay though PVC pipe of GI condute? A1- Underground cable lay through 1000 Type PVC pipeQ2-In this tender you have devided into to main sections(LOT1&2). But LOT 1 project duration is 4moths and LOT 2 project duration is 2 months. Please clarify that you wish to award the both in same day and will project start date is same?A2- There is aproximately 2 months gap to award the Lot 2 after the date of Award-Lot 1.
Edited on:
27-Apr-2021 13:11
Edited by:
webservice@unops.org
New amendment added #1: Upload the revised BoQ( Lot No 1 & 2) and Pre-Bid Meeting Minutes. The relevant Contract provisions indicated below are amended to read as follows;Lot 1 Bill of Quantity under Documents: Replace the file “ ITB_Minor_work _Construction_Contract_Section_VII_LOT 01_Bills Of Quantity “ with " ITB_Minor_work _Construction_Contract_Section_VII_LOT 01_Bills Of Quantity_Revision 1. ”Lot 2 Bill of Quantity under Documents: Replace the file “ ITB_Minor_work _Construction_Contract_Section_VII_LOT 02_Bills Of Quantity with ITB_Minor_work _Construction_Contract_Section_VII_LOT 02_Bills Of Quantity_Revision 1Upload the Pre-Bid Meeting Minutes
Edited on:
26-Apr-2021 07:47
Edited by:
webservice@unops.org