Description
The works include Construction of Harirud Bridge, Approach Roads and River Protection Walls in Herat Province, Afghanistan.
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
| Link | Description | |
|---|---|---|
| https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72141107
-
Bridge construction and repair service
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 17 December 2020:Q17: In the Bill of Quantity, Sheet (BoQ Bridge), the formula of Sum for Total for Bill 1 (1000 Preliminary and Site Facilities) has not been added and the amount for the Item (Environmental and Social Protection for Project) has not been considered. Please clarify the issues.A17: These errors have been corrected in the updated BOQ, which is now uploaded in the document upload section. Kindly refer to the document titled: "Section_III_Annex_C_(Bills of Quantities)_Update3_15DEC20". We apologize for this oversight.Q18: If our JV partner has a similar project in Saudi Arabia ,Alkharj city can we be qualify for bidding. Your attention is highly appreciated A18: From the provided description this bridge does not appear to be in a country with similar geographic and seasonal weather. Hence, it cannot fulfil the requirement for similar experience defined in this tender.Q19: We have previous experience in a bridge project with the following scope: Kumburgaz Bridged Crossing Construction, Silivri / Istanbul, TurkeyBrief Description of Works:- Bridge Construction Pre- tensioned (306 m), 3800 m. road two lanes access road.- Beam manufacturing and mounting, rain water and waste water manufacturing in various diameter 420 m. Ø300, 2800 m. Ø500, 3595 m. Ø600, 1740 m. Ø800, 3245 m. Ø1200, 800 m. Ø1400 diameter steel pipe for drink water grid line.- Illumination, landscaping, traffic signs mounting, pavement and refuge arrangement.- Concrete asphalt dressing 12520 m.A19: From the provided description this project does not appear to be for the construction of Pile Foundation Cast-in-situ RCC Girder Bridge. Hence, it cannot fulfil the requirement for similar experience defined in the tender.Q20: Is it acceptable that a company has losts of building construction experience in amount of related similar project, as similar projects? It means instead of bridge if there are lots of experience in field of building construction.A20: The criteria for the similar projects is clearly mentioned in the bidding documents. The construction of each infrastructure has different construction methodology and require different technology, therefore building construction will not fulfill the requirement for the similar experience.
Edited on:
17-Dec-2020 08:47
Edited by:
webservice@unops.org
New amendment added #4: Deadline for the submission of bids is hereby extended until December 20, 2020, 15:00hrs Kabul time (UTC + 4.30hrs); Document titled "Section_III_Annex_C_(Bills of Quantities)_Update2_07DEC20" is replaced with further updated document titled "Section_III_Annex_C_(Bills of Quantities)_Update3_15DEC20". The Bills of Quantities was updated to correct the errors identified by the potential bidders.
Edited on:
15-Dec-2020 07:07
Edited by:
webservice@unops.org
New amendment added #3: Document titled "Section_III_Annex_C_(Bills of Quantities)_Update1_03DEC20" is replaced with further updated document titled "Section_III_Annex_C_(Bills of Quantities)_Update2_07DEC20". The Bills of Quantities was updated in order to correct the Unit of Measure of the line item 43/1 Bituminous Prime Coat in the BOQ sheet for Approach Road and River Protection Wall.
Edited on:
09-Dec-2020 04:44
Edited by:
webservice@unops.org
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 07 December 2020: Q16: As per our check of BOQ, there is a mistake in the Unit of Measure of the line 43/1 Bituminous Prime Coat. It is mentioned as "Each". Please clarify this issue. A16: This typo error has been corrected in the updated BOQ, which is now uploaded in the document upload section. Kindly refer to document titled: "Section_III_Annex_C_(Bills of Quantities)_Update2_07DEC20". We apologize for this oversight.
Edited on:
08-Dec-2020 09:49
Edited by:
webservice@unops.org
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 05 December 2020: Q14: We have previous experience in a Bridge construction project with the following scope: PROJECT: PREFABRICATED STEEL BRIDGE CONSTRUCTION PROJECT. Scope of Work: Turn-key works for three (3) 50-150m span bridges. The project includes site preparation and earthworks, piling and foundations, pillars, beams, decking, approach slabs and road work tie-in and paving. (Irrakkandiya Bridge, Pudawakattu Bridge, Oya Bridge). LOCATION: TRINCOMALEE DISTRICT, SRI LANKA. Shall this project be considered as a similar experience for this bid, please let us know. A14: From the provided description this project does not appear to be for the construction of Pile Foundation Cast-in-situ RCC Girder Bridge. Hence, it cannot fulfil the requirement for similar experience defined in the tender. Q15: Is it possible to share the recorded minutes of the online clarification meeting, if recorded? A15: The actual recording of the pre-bid meeting is almost 2hrs long and very large in size, hence cannot be uploaded into the system "as is". The summary minutes of the pre-bid meeting however is already uploaded in the document upload section.
Edited on:
08-Dec-2020 08:29
Edited by:
webservice@unops.org
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 04 December 2020:Q13: As a similar project can we use the below project? - Construction of the 120 meter long Regak Prefabricated Steel Component Bridge and the Subsurface Investigation of Oshay Bridge. The work included demolition of existing bridge, survey alignment, construction of concrete abutments, piers and pier caps, procurement and installation of prefabricated steel component bridge for this project. A13: From the provided description this bridge does not appear to be Pile Foundation Cast-in-situ RCC Girder Bridge. Hence, it cannot fulfil the requirement for similar experience defined in this tender.
Edited on:
08-Dec-2020 08:14
Edited by:
webservice@unops.org
New amendment added #2: Deadline for the submission of bids is hereby extended until December 15, 2020, 15:00hrs Kabul time (UTC + 4.30hrs); Deadline for clarifications is hereby extended until Close of Business on December 09, 2020, Kabul time (UTC +4.30hrs); Document titled "Section_III_MPCC_Annex_C_(Bills of Quantities)" is replaced with updated document titled "Section_III_Annex_C_(Bills of Quantities)_Update1_03DEC20" in the document upload section. Minutes of the pre-bid meeting conducted on 29 November 2020 have been uploaded in the document upload section.
Edited on:
04-Dec-2020 06:41
Edited by:
webservice@unops.org
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 01 December 2020:Q10: We are very much keen to submit a proposal for this tender and working on it to provide you our best offer. But to submit you a competitive and complete bid, we need some more time for preparation of the same. Hence, we would like to request you to kindly grant us four (4) weeks’ time extension for preparation and submission of the proposal from the current Offer Due Date on 8th December 2020. The new requested by us submission date after four (4) weeks’ time extension comes to be on Tuesday, 5th January 2021. Thanks in advance for your kind consideration and assure you of our best attention at all times.A10: Please see A7 above. Q11: We would like to kindly request at least a one-week extension to the bid closing date.A11: Please see A7 above.Q12: Can vented Causeway be counted as similar project experience as requested in the ITB (Pile Foundation Cast-in-situ RCC Girder Bridge of at least 100m length Project)?A12: No. The vented causeway will not be counted as a similar project.
Edited on:
02-Dec-2020 09:06
Edited by:
webservice@unops.org
New clarification added: Below is the summary of requested clarifications and UNOPS responses to them as of 30 November 2020:Q2: We have the following queries, hence would like to request you to kindly clarify those at your earliest for us to proceed ahead accordingly:Section III MPCC Annex C (Bills of Quantities) – RCC wing wall – Please confirm grade of concrete against item no. foundation, foundation cut off, stem.Section III MPCC Annex C (Bills of Quantities) - CONTRACT ID: 11840-002 (Package #2) - , SUBJECT, 840M APPROACH ROAD & 1000M RIVER PROTECTION WALL – In the excel sheet, link for total sum in the summary page (BOQSUM) is not properly made for AR&RW works. Please suggest which line items of AR&RW works will be added in this summary portion.Section III MPCC Annex C (Bills of Quantities) - AR&RW works excel sheet – total sum for Bill 3, SOIL AGGREGATE PAVEMENTS, Bill 4, ROAD WORKS, are not showing in the Total for Bill 3 & Total for Bill 4 cells. Kindly rectify the same & share the corrected BOQ for pricing.A2: Below are the responses to your above questions:The grade of concrete is 30MPa.The link is corrected in the BoQ file.This is corrected in the BoQ file.The BoQ is revised and the updated BoQ shall uploaded in the document upload section on or before 03DEC2020 together with Pre-Bid Meeting Minutes. Q3: As per RETURNABLE BID SCHEDULE 8 - the required similar experience is 100m Bridge as a prime contractor. My question is that in the case of Joint Venture (JV), whether each partner is required to have a similar 100m Bridge or only one company can fulfill the requirement? Are there any limits for each partner to fulfill as a JV Partner?A3: The JV members must demonstrate that at least one of the JV members had successfully executed as a prime contractor a similar project of at least one [1] Pile Foundation Cast-in-situ RCC Girder Bridge of at least 100m length in Afghanistan or in another country with similar geographic and seasonal weather setting during the last ten [10] years.Q4: In the case of Joint Venture (JV), if one company has a similar bridge and another company has a similar road experience, but jointly our companies fulfill the requirement of similar experience under the tender, can we bid?A4: Yes, absolutely. Q5: Do you accept if two companies bid for subject tender as JV partners whilst only one of these JV partners meets the similar experience criterion?A5: Yes, absolutely. Q6: Do you accept if two companies bid for subject tender as JV Partners and only one of these JV-Partners meet the AVERAGE ANNUAL CONSTRUCTION TURNOVER of USD 3,000,000 according to RBS-8?A6: If one of the JVs fulfills the requirement of the Average Annual Construction Turnover, the bid will be acceptable as this requirement will be cumulative for the JV members, i.e. the sum of average annual construction turnovers of the JV members will be summed together in order to calculate the average annual construction turnover of the JV.Q7: We express our extreme interest for the Construction of Harirud Bridge, Approach Roads and River Protection Walls in Herat Province, Afghanistan. We have got the news regarding this tender just today. Since we have only 8 days left until the bid submission deadline, it seems difficult to prepare a responsive bid within this short time. Therefore, we kindly request to extend the deadline. A7: UNOPS will look into this and if deemed necessary, the ITB shall be amended on or before 03DEC2020 to extended the bid submission deadline.Q8: Similar Work Experience did not mention the amount, only stated the required project. Can you tell us the required value of the similar project?A8: The Value of the contract doesn’t matter as long as the bidders demonstrate that they have completed at least one Pile Foundation Cast-in-situ RCC Girder Bridge of at least 100m long.Q9: We missed the pre bid-meeting. Can we still bid for this project?A9: The pre-bid meeting was non-mandatory, so you can bid.
Edited on:
02-Dec-2020 09:03
Edited by:
webservice@unops.org
New clarification added: Below is the summary of Questions and Answers as of 27 November 2020:Q1: As per Amendment 1 - To change the dates of pre-bid meeting and site visit. 2020-11-23, We could not find the Amendment text or document on the system. Kindly speicify the exact date of Pre-bid meeting and site visit.A1: The exact dates and times for the pre-bid meeting and site inspection are specified in the Particulars section of the ITB. For ease of reference, the relevant information is copied herein:A virtual non-mandatory pre-bid clarification meeting will be held on 29 November 2020, from 09:00am to 11:00pm (Kabul time, [UTC +4.30hrs]). Prospective Bidders can participate in the Virtual non-mandatory bre-bid clarification meeting using the following Google Meet link: meet.google.com/pte-qeve-tjtIn addition to the above specificed non-mandatory pre-bid clarification meeting, UNOPS shall carry out a non-mandatory site visit/inspection. Option 1: Group site visit/inspectionDate: 30 November 2020Time: 09:30am - 12:30pm Kabul time (UTC +4.30hrs)Location: The starting point of the site visit shall be Mukhabirat street, in front of the Department of Public Works, Herat, Afghanistan.
Edited on:
28-Nov-2020 04:31
Edited by:
webservice@unops.org
New amendment added #1: Amendment 1 - To change the dates of pre-bid meeting and site visit.
Edited on:
23-Nov-2020 20:16
Edited by:
webservice@unops.org