Establishment of Long term Contract for the supply and delivery of Electrical Material Packages ...

UN Secretariat
Establishment of Long term Contract for the supply and delivery of Electrical Material Packages ... Request for EOI

Reference: EOIUNGSC14934
Beneficiary countries or territories: Italy
Registration level: Basic
Published on: 23-Mar-2018
Deadline on: 24-Apr-2018 00:00 0.00

Description
The United Nations Global Service Centre (UNGSC) in Brindisi, Italy has a requirement to establish a long-term contract for the supply and delivery of the following Electrical Material Packages: - Electrical Material Package “A” Cables and Accessories - Electrical Material Package “B” Panel boards and Accessories - Electrical Material Package “C” Bulbs and Accessories An indication of the grouping which shall form the Electrical Material Packages categories are as follows: • Electrical cables and accessories; • Electrical conduits and accessories; • Civil-type plugs, sockets, and switches; • Electrical panel-boards, and accessories; • Lighting fixtures and bulbs; • Transformers. The items shall be appropriate for use in critical harsh environmental conditions, suitable for different climate zones (e.g. desert, tropical country, mountain, etc.) in which there are several variations of relative natural forces (e.g. temperature, humidity, wind, etc.). All materials/items shall be in compliance with international codes, rules, regulations, ordinances standards, including, but not limited to the following: • EUROCODE • ASTM • ISO • BS EN • DIN In addition to the above Electrical Material Packages, other optional items may be required. Bidders will be requested to submit price catalogues based on the above categories. The items shall be supplied in package configuration, and all parts and components must be packed on pallets for transport via road, air, and sea in 20’ ISO sea shipping containers. Shipment shall be made using 20’ ISO sea containers in protective packaging to prevent breakages during transportation. The gross weight of each container must not exceed 10 tons. Split awards by Packages may be considered. Delivery Terms: Delivery at Place – DAP UNGSC, Brindisi, Italy and or Free Carrier – FCA nearest port of exit (INCOTERMS 2010). Maximum lead times shall not exceed 60 days. The contract term shall be for an initial period of one (1) year, with the UNGSC's sole option to extend the term of the contract for two (2) additional periods of one year each (1+1+1). The full technical requirements and details will be provided with a solicitation document to be issued at a later stage after the closing date for this EOI.

Graziella Baldasarre