Retender - Rehabilitation of an urban road in Aden City IUS-AF2-RMF-ADN-025 starting from Alsylah roundabout , ending at 22 May roundabout 2.2 Km long
UNOPS
Retender - Rehabilitation of an urban road in Aden City IUS-AF2-RMF-ADN-025 starting from Alsylah roundabout , ending at 22 May roundabout 2.2 Km long
Request for quotation
Reference:
RFQ/2024/53907
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
01-Oct-2024
Deadline on:
30-Oct-2024 09:00 0.00
Description
Retender - Rehabilitation of an urban road in Aden City IUS-AF2-RMF-ADN-025 starting from Alsylah roundabout , ending at 22 May roundabout 2.2 Km long,
Two directions separated by a median of 3 m, multiple 2 lanes @ 3.5 m per each direction , scope of rehabilitation covers potholes repair, Crack Sealing ,Hot Asphalt Concrete HMA composed of thin protection layer overlay 50 mm, 30 mm, improve drainage of rainwater through a new collecting system ends at an RCC water collecting chamber , road safety and environmental works.Total length of the road is 2.2 KM
---------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Two directions separated by a median of 3 m, multiple 2 lanes @ 3.5 m per each direction , scope of rehabilitation covers potholes repair, Crack Sealing ,Hot Asphalt Concrete HMA composed of thin protection layer overlay 50 mm, 30 mm, improve drainage of rainwater through a new collecting system ends at an RCC water collecting chamber , road safety and environmental works.Total length of the road is 2.2 KM
---------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72103301
-
Parking lot or road maintenance or repairs or services
New amendment added #2: Amendment (2) :The purpose of this amendment is to:Amedment 2 RFQ of Small Works - 6 Solicitation RFQ-2024-53907 -Sections II, III, IV, V (SCHEDULE 1: CONTRACT DETAILS,1.1 Details Provided by the Employer, 6.2 Time for Completion) Therefore,The e sourcing, the tap documents is amended to add: Amedment 2 RFQ of Small Works - 6 Solicitation RFQ-2024-53907 -Sections II, III, IV, VAll other terms and conditions remaining the same
Edited on:
17-Oct-2024 07:10
Edited by:
webservice@unops.org
New clarification added: Q1 : In Bill No 5 item 5.2 : Curbstone Painting by using thermoplastic paint including cleaning the curb stones as directed by Engineer (the quantity is 7000m.l while the total quantity of required curbstone is 9800m.l) Ans2: We confirm that the requirement is as per the BOQ, please elaborate further where is this number indicated in our doc. Q2 : Regarding the project insurance mentiond in the requirments (how can we provide an insurance policy before signing the contract )An 2 : The requirement here is a confirmation that in case you are thee recommended bidder the insurance policy will be provided upon contract signature, please fill the returnable schedule for insurance requirement by signing and stamp Q3: there are no iformation about the banck garantee for the contract is it required or notAns 3: For this tender the bank guarantee is not applicable Q4: also about the project deuration once it mentioned 240 days and in another page it is mentioned as 6 months , what is the correct project deuration Ans 4: Amendment will be share soon considering the project timeline to be completing with 6 months
Edited on:
16-Oct-2024 12:17
Edited by:
webservice@unops.org
New clarification added: Q1 - What you mean by tab Datasheets, catalogues and certificates of the technical offer.and what we uplowad in it ?An1 - we removed from the esourcing checklist tab, the Datasheets, catalogues and certificates of the technical offerQ2 - Which section we can upolwad the IUS-AF2-RMF-ADN-025-DRC-Signed DR certificate doucment ?An2 - No need to upload the IUS-AF2-RMF-ADN-025-DRC-Signed DR certificateQ3 - From where we can attach the mandatory company organizational chart document and you do not attach it with the tender documents?An3 - Please refer to Amedment 1 - Mandatory - Company Organogram Chart (1)
Edited on:
08-Oct-2024 14:44
Edited by:
webservice@unops.org
New clarification added: Q1 - What you mean by tab Datasheets, catalogues and certificates of the technical offer.and what we uplowad in it ?An1 - we removed from the esourcing checklist tab, the Datasheets, catalogues and certificates of the technical offerQ2 - Which section we can upolwad the IUS-AF2-RMF-ADN-025-DRC-Signed DR certificate doucment ?An2 - No need to upload the IUS-AF2-RMF-ADN-025-DRC-Signed DR certificateQ3 - From where we can attach the mandatory company organizational chart document and you do not attach it with the tender documents?An3 - Please refer to Amedment 1 - Mandatory - Company Organogram Chart (1)
Edited on:
08-Oct-2024 14:37
Edited by:
webservice@unops.org
New amendment added #1: Amendment (1) :The purpose of this amendment is to:Amedment 1 RFQ of Small Works - 6 Solicitation RFQ-2024-53907 -Sections II, III, IV, V (Part 1: Proposed methodology, approach and Implementation plan , 3.1.1 Work plan:)Amedment 1 - Mandatory - Company Organogram Chart (1)Remove from the esourcing checklist tab, the Datasheets, catalogues and certificates of the technical offer Therefore,The e sourcing, the tap documents is amended to add: Amedment 1 RFQ of Small Works - 6 Solicitation RFQ-2024-53907 -Sections II, III, IV, VAmedment 1 - Mandatory - Company Organogram Chart (1)The e sourcing, the tap checklist is amended to add:Removed the Datasheets, catalogues and certificates of the technical offer from the checklistAll other terms and conditions remaining the same
Edited on:
08-Oct-2024 14:16
Edited by:
webservice@unops.org