Rehabilitation and Completion of the Water Network in Dawran Anis area - Yemen. (EHC-PR-WS-DHAM-001)
UNOPS
Rehabilitation and Completion of the Water Network in Dawran Anis area - Yemen. (EHC-PR-WS-DHAM-001)
Request for quotation
Reference:
RFQ/2024/51765
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
29-Jul-2024
Deadline on:
21-Aug-2024 09:00 0.00
Description
Tender Description:
Rehabilitation and Completion of the Water Network in Dawran Anis area - Yemen. (EHC-PR-WS-DHAM-001)
-----------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Rehabilitation and Completion of the Water Network in Dawran Anis area - Yemen. (EHC-PR-WS-DHAM-001)
-----------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
70171705
-
Pipelines maintenance or management services
New clarification added: Question 13: We kindly request you to extend the deadline for submitting bids by one week.Answer: Please note that we can not extend more as this RFQ is under emergency procurement process.Question 14: Could you please confirm that the material of the Single Ferrule Outlet on PE Pipes is Polypropylene (PP)?Answer: Please refer to the RFQ specification , BoQ and drawing .Question 15: Please make sure of the specified implementation period for the project. Is it 8 months as you mentioned?Answer: Please refer to the RFQ , scope of work, schedule ,specification , BoQ and drawing .
Edited on:
18-Aug-2024 20:48
Edited by:
webservice@unops.org
New clarification added: Question 12: Regarding the amendment, have you deleted the pump item? It has been shown to us that it has been deleted. Please confirm.Answer: Please be advised that the pump item has been clearly indicated with a strikethrough format, signifying its removal from the Bill of Quantities (BoQ) and confirming that it will not be included.
Edited on:
16-Aug-2024 20:19
Edited by:
webservice@unops.org
New amendment added #2: This amendment was raised to upload the updated Annex 1 - Bill_of_Quantity_Amendment_14-Aug-2024. As per the technical specialist’s recommendation.
Edited on:
15-Aug-2024 12:39
Edited by:
webservice@unops.org
New clarification added: Question 8: During our field visit to the project site (Dawran Anis), we had some inquiries that needed clarification, which are as follows:8.1- It turned out that the slopes are steep and require large amounts of cutting and backfilling at a depth of 6-7 meters , not as mentioned in the profile, as the DI ductile pipes do not allow a deviation of more than 15 degrees.Answer: The profail was based on site topographic survey, However as per the RFQ spec the pipeline excavation alignment shall be optimized based on ground conditions, considering slope. The pipeline shall be installed using appropriate fittings, such as; DI bends (e.g., 11°, 22°, 45°, 90°), and couplings.8.2- It turned out that the tank level is higher than the city and there is no need to install a horizontal pump, nor is there a power source to operate it.Answer: Thank you for your comment and an amendment will be published soon. 8.3- It turned out that there is a flow line in excellent condition, and if it is necessary to install a pipe, it is preferable to install a new galvanized pipe with the same diameter of 150 mm, and it does not require backfill the iron pipes.Answer: Please refer to the RFQ documents (scope of work, drawing, technical specs, BoQ, and …etc) Question 9: Regarding No. (6) including (pumping unit)We went to the market for pump dealers and agents and did not obtain these specifications due to the lack of specifications with the same production capacity of 90 liters/secondIs it possible to provide 2 pumps with a production capacity of 45 liters/s? The total productivity of 2 pumps is 90 liters/sPlease provide clarification in this regard and also please specify the location of the pump and the installation location in the project.Answer: Thank you for your comment and an amendment will be published soon. Question 10: 1:- Please clarify the specifications of pump No. 6.1 as there are no specifications for it. Answer: Thank you for your comment and an amendment will be published soon. 10.2:- Explain the installation method for ductile pipes with a diameter of 200. Are they installed with flanges and screws?Answer: As per the RFQ spec the pipeline excavation alignment shall be optimized based on ground conditions, considering slope. The pipeline shall be installed using appropriate fittings, such as; DI bends (e.g., 11°, 22°, 45°, 90°), and couplings.Question 11: Is there a bank guarantee to enter this tender?Answer: No, there is no bank guarantee required to enter this tender.
Edited on:
14-Aug-2024 18:57
Edited by:
webservice@unops.org
New clarification added: Question 5: We noticed that in the horizontal pump item 6.1 you requested that the productivity should be 90 liters per minute and the total height be 20 meters, but you requested that the pump capacity be 41 kilowatts, and this is not possible. Should we stick to the] pump or motor capacity of not less than 41 kilowatts, or stick to the required productivity and total height?Answer: Thank you for your comment and an amendment will be published soon. Question 6: (Modification to the previous inquiry) We noticed that in the horizontal pump item 6.1 you requested that the productivity should be 90 liters per second and the total height be 20 meters, but you requested that the pump capacity be 41 kilowatts, and this is not possible. Should we stick to the] pump or motor capacity of not less than 41 kilowatts, or stick to the required productivity and total height?Answer: Thank you for your comment and an amendment will be published soon. Question 7: In the TECHNICAL QUESTIONNAIRE file, there is no technical requirements for PUMP item? and its very important item?where we can provide the technical details for this item? Answer: Thank you for your comment and an amendment will be published soon.
Edited on:
14-Aug-2024 18:50
Edited by:
webservice@unops.org
New amendment added #1: This amendment was raised to extend the deadline until 21-Aug-2024.
Edited on:
11-Aug-2024 20:34
Edited by:
webservice@unops.org
New clarification added: Question 3: Is it possible to extend the tender closing period?Answer: Please accept our apology as it is an Emergency Procurement process .Question 4: We want to ask you about the Expected contract award date.Answer: Please note that award notification is anticipated to be released within ten (10) business days following the RFQ closing date.
Edited on:
10-Aug-2024 19:14
Edited by:
webservice@unops.org
New clarification added: Question 1: Based on the documents and drawings, there is a shortage of pipe profiles—only 2368 meters are available. Could you please provide us with the remaining profiles?Additionally, kindly attach the details of the gate valve boxes.Answer: Yes exactly the profile is given for the main pipe (DN:200and DN150 ) while the distribution network should be implemented as per the plan drawing and tech specs and BoQ. Please refer to the drawing STANDARD DETAILS for WASHOUTS chamber .Question 2: Please clarify exactly what you want in the Document name: Signed and stamped all RFQ documents field.Answer: It means that you should sign and stamp all the RFQ returnable forms in addition to all annexes . including BoQ , scope ,drawing ,technical specs, …etc.
Edited on:
07-Aug-2024 11:31
Edited by:
webservice@unops.org