IMPLEMENTATION OF FLEXIBLE WORKPLACE STRATEGIES (FWS) AS PART OF THE REPLACEMENT OF OFFICE BLOCK ...
UN Secretariat
IMPLEMENTATION OF FLEXIBLE WORKPLACE STRATEGIES (FWS) AS PART OF THE REPLACEMENT OF OFFICE BLOCK ...
Request for EOI
Reference:
EOIUNON15501
Beneficiary countries or territories:
Kenya
Registration level:
Basic
Published on:
11-Sep-2018
Deadline on:
30-Sep-2018 00:00 0.00
Description
The UN Gigiri Complex comprises 140 acres, 40 buildings of mixed office and commercial space and hosts approximately 50 UN Agencies, Funds and Programs and 3,500 UN staff.
The Replacement of Office Blocks A-J Project entails construction of rightsized buildings to replace Office Blocks A-J, which are now approaching the end of their design lives. Flexible workplace strategies are to be incorporated into these new office buildings (approximately 10,000 square meters of rentable office space). The remaining parts of the UN Gigiri Complex are also expected to undergo a comprehensive renovation by incorporating flexible workplace strategies into existing office buildings (approximately 45,000 square meters of rentable office space).
For the above requirement UNON is considering engagement of an established multidisciplinary company/ firm to provide integrated consultancy services for the flexible workplace feasibility study and implementation project. The expertise of the firm/s shall include, but not be limited to the following key disciplines; architectural services, engineering services, space planning and interior design services, information technology services, environmental, cost planning and estimating services and change management and communication services.
Due to the multidisciplinary nature of the requirement, a consortium of firms or single multidisciplinary firm are encouraged to express interest. In the consortium, the prime firm or lead consultant shall have core competence in one or more of the following disciplines: architectural, space planning and interior design. A consortium shall provide proof of agreement by the parties to participate in the anticipated upcoming tender.
There are two phases of implementation where the firm shall provide services:
Phase 1 – Feasibility Study
• Determining the feasibility and applicability of flexible workplace strategies at the UN Gigiri Complex through carrying out a series of studies and analysis including workspace utilization, operation requirements, space planning, and office space reconfiguration studies.
• Based on the findings and analysis, proposing workplace fit out including modular or systems furniture and information technology that will support various offices operational requirements.
• Preparing comparative cost and benefits analysis between the current set up and the FWS implementation. The analysis shall cover both qualitative and quantitative aspects of both options including but not limited to cost, staff well-being, workplace efficiency and operational cost;
• Carrying out the design, bid and supervision of a flexible workplace pilot project in one or more of the existing buildings to provide an opportunity to assess every aspect of the flexible workplace design concept as well as to allow for estimated costs (including new office configurations, space improvements, maintenance, utilities and any other material costs) and timelines for implementation of the flexible workplace to be vetted through actual construction and delivery, and for relevant improvements to be made;
• Based on the pilot findings, developing a comprehensive bid package/s for flexible workplace implementation which shall comprise amongst others preliminary design and construction drawing sets (including typical workstations, typical collaborative space, typical quiet or individual space, typical in floor amenities such as working lounges, small kitchens, IT network cabling and any other supporting services infrastructure) modular/ systems furniture and specialist loose furniture;
• Assisting with bidding out of the flexible workplace construction and fit out works.
Phase 2 – Full Flexible Workplace Implementation
Project Management
• In line with the phased implementation schedule, design, coordinate and supervise the construction and implementation of flexible workplace, customized to suit the individual needs and requirements of UN Agencies, Funds and Programs accommodated within existing office buildings at the UN Complex as well as new buildings to be constructed as part of the Replacement of Office Blocks A-J Project.
Change Management and Communications
• Preparing an integrated change management and communications strategy comprising strategic
communications;
• Upon agreed strategies, using different medium developing material (webpage, town hall meeting,
poster, periodic articles, etc.) for staff outreach and communications to support organizational
engagement and understanding of flexible workplace and ways of working in flexible work
environments;
• Carrying out detailed studies, observations and analysis of pilot utilization. Through meetings with
users and post occupancy survey, capturing staff feedbacks and lessons learned from the pilot;
• Working with HR services to promote related flexible working arrangements, Facilities services to
develop new UN guidelines for space standards and furniture including usage and holding stock
and ICT services to support and facilitate a more mobile workforce.
Eunice Mapenzi
Link | Description | |
---|---|---|
https://www.un.org/Depts/ptd/sites/www.un.org.Depts.ptd/files/pdf/eoi15501.pdf | Click here to open EOI document |
72153601
-
Bathtub refinishing and repair service
72153602
-
Closet organizer installation and repair service
72153603
-
Counter top installation service
72153604
-
Drapery track installation service
72153605
-
Kitchen and bathroom remodeling service
72153606
-
Office furniture installation service
72153607
-
Plastic wall tile installation service
72153608
-
Window treatment installation service
72153609
-
Domestic or commercial appliance installation service
72153610
-
Prefabricated fireplace installation service
72153611
-
Kitchen cabinet installation service
72153612
-
Interior design or decorating
72153613
-
Office furniture lease and maintenance service
77101605
-
Environmental institution building or planning
80101507
-
Information technology consultation services
80172103
-
Change management communication and advisory service
81101501
-
Well engineering
81101502
-
Technical drawing
81101503
-
Harbor or water ports engineering
81101505
-
Structural engineering
81101506
-
Naval architecture
81101507
-
Dam engineering
81101508
-
Architectural engineering
81101509
-
Airport engineering
81101510
-
Highway engineering
81101511
-
Railway engineering
81101512
-
Geographic information system GIS services
81101513
-
Building construction management
81101514
-
Geotechnical or geoseismic engineering
81101515
-
Plant or facility infrastructure engineering
81101516
-
Energy or utility consulting service
81101517
-
Landscape architecture and design service
81101518
-
Lighting engineering service
81101519
-
Subdivison planning service
81101520
-
Hydrology assessment service
81101521
-
Hydrogeology assessment service
81101522
-
Earthworks engineering
81101523
-
Urban design and engineering service
81101524
-
City development planning service
81101525
-
Sediment control engineering
81101526
-
Quantity surveying service
81101527
-
Wastewater engineering
81101528
-
Stormwater engineering
81101529
-
Acoustic engineering
81101530
-
Fisheries engineering
81101600
-
Mechanical engineering
81101701
-
Electrical engineering services
81101702
-
Electronic circuit design
81101703
-
Engineering testing services
81101706
-
Laboratory equipment maintenance
81101707
-
Printing equipment maintenance
81101710
-
Wafer reclaiming service
81101711
-
Electronic component manufacturing service
81101713
-
Electronic measurement and recording instrument engineering and design service
81101800
-
Chemical engineering
81101902
-
Production engineering for oil or gas
81102001
-
Hydraulic mining
81102101
-
Coastal engineering
81102201
-
Traffic engineering
81102202
-
Urban transport network
81102203
-
Inland waterways
81102301
-
Avionics design
81102302
-
Space engineering service
81102401
-
High voltage overhead line construction
81102402
-
High voltage overhead line maintenance and repair
81102501
-
Mine permitting service
81102502
-
Building consent and permit engineering peer review service
81102503
-
Building consent processing and support service
81102601
-
Coal sampling service
81102801
-
Demining environmental impact assessment EIA service
81102802
-
Demining feasibility study FS service
81102803
-
General mine action assessment GMAA service
81102804
-
Demining non technical survey NTS service
81102805
-
Demining operational analysis (OA) or operational research service
81102806
-
Post mine clearance assessment service
81102807
-
Demining risk analysis or assessment or evaluation service
81102808
-
Demining technical survey
81102809
-
Mine landmine impact survey LIS
81102810
-
Counter improvised explosive device IED training
81102810
-
Counter improvised explosive device IED training
81102811
-
Canine explosive detection team
81102815
-
Explosive Detection Dogs (EDD) with handler