Supply and Installation of Solar Systems for Wells and Pumping Station Stages to Al-Jabain Area - Raymeh City - Yemen. (EHC-PR-WS-RMH-001)
UNOPS
Supply and Installation of Solar Systems for Wells and Pumping Station Stages to Al-Jabain Area - Raymeh City - Yemen. (EHC-PR-WS-RMH-001)
Request for quotation
Reference:
RFQ/2023/49743
Beneficiary countries or territories:
Yemen
Registration level:
Basic
Published on:
30-Nov-2023
Deadline on:
19-Dec-2023 09:00 (GMT 0.00)
Description
Tender Description:
Supply and Installation of Solar Systems for Wells and Pumping Station Stages to Al-Jabain Area - Raymeh City - Yemen. (EHC-PR-WS-RMH-001)
-----------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
Supply and Installation of Solar Systems for Wells and Pumping Station Stages to Al-Jabain Area - Raymeh City - Yemen. (EHC-PR-WS-RMH-001)
-----------------------------------------------------------------------------------------------------
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
26131507
-
Solar power plants
New clarification added: Question 1: We would like to verify the accuracy of the cable length mentioned in the quantity table, LOT2 item NO. 6.1. The table states that the cable length is 1600 meters. However, according to the drawings, it seems that the cable length cannot be of that size. Therefore, we would like to confirm whether the cable length mentioned in the quantity table is correct or if there is a need for modifications.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work , However the contract will based on unite cost , Additionally, we have another inquiry regarding the Earthing system. According to the information provided in LOT 1 item NO. 9,one system consists of two earthing pits, including copper bars and all necessary components for installation, along with three busbars and earthing cables for all system equipment. Our query pertains to the number of systems required. Does "4 systems" mean that there is a need for four earthing pits, or does it imply something else? It should be noted that one system is sufficient for grounding all the system equipment. We need to verify the accuracy of the information mentioned in the table and clarify the requirements for the earthing system.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work.
Edited on:
13-Dec-2023 15:16
Edited by:
webservice@unops.org
New clarification added: Question 1: We would like to verify the accuracy of the cable length mentioned in the quantity table, LOT2 item NO. 6.1. The table states that the cable length is 1600 meters. However, according to the drawings, it seems that the cable length cannot be of that size. Therefore, we would like to confirm whether the cable length mentioned in the quantity table is correct or if there is a need for modifications.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work , However the contract will based on unite cost , Additionally, we have another inquiry regarding the Earthing system. According to the information provided in LOT 1 item NO. 9,one system consists of two earthing pits, including copper bars and all necessary components for installation, along with three busbars and earthing cables for all system equipment. Our query pertains to the number of systems required. Does "4 systems" mean that there is a need for four earthing pits, or does it imply something else? It should be noted that one system is sufficient for grounding all the system equipment. We need to verify the accuracy of the information mentioned in the table and clarify the requirements for the earthing system.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work.
Edited on:
13-Dec-2023 15:14
Edited by:
webservice@unops.org
New clarification added: Question 1: We would like to verify the accuracy of the cable length mentioned in the quantity table, LOT2 item NO. 6.1. The table states that the cable length is 1600 meters. However, according to the drawings, it seems that the cable length cannot be of that size. Therefore, we would like to confirm whether the cable length mentioned in the quantity table is correct or if there is a need for modifications.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work , However the contract will based on unite cost , Additionally, we have another inquiry regarding the Earthing system. According to the information provided in LOT 1 item NO. 9,one system consists of two earthing pits, including copper bars and all necessary components for installation, along with three busbars and earthing cables for all system equipment. Our query pertains to the number of systems required. Does "4 systems" mean that there is a need for four earthing pits, or does it imply something else? It should be noted that one system is sufficient for grounding all the system equipment. We need to verify the accuracy of the information mentioned in the table and clarify the requirements for the earthing system.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work.
Edited on:
13-Dec-2023 15:13
Edited by:
webservice@unops.org
New clarification added: Question 1: We would like to verify the accuracy of the cable length mentioned in the quantity table, LOT2 item NO. 6.1. The table states that the cable length is 1600 meters. However, according to the drawings, it seems that the cable length cannot be of that size. Therefore, we would like to confirm whether the cable length mentioned in the quantity table is correct or if there is a need for modifications.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work , However the contract will based on unite cost , Additionally, we have another inquiry regarding the Earthing system. According to the information provided in LOT 1 item NO. 9,one system consists of two earthing pits, including copper bars and all necessary components for installation, along with three busbars and earthing cables for all system equipment. Our query pertains to the number of systems required. Does "4 systems" mean that there is a need for four earthing pits, or does it imply something else? It should be noted that one system is sufficient for grounding all the system equipment. We need to verify the accuracy of the information mentioned in the table and clarify the requirements for the earthing system.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work.
Edited on:
13-Dec-2023 15:11
Edited by:
webservice@unops.org
New clarification added: Question 1: We would like to verify the accuracy of the cable length mentioned in the quantity table, LOT2 item NO. 6.1. The table states that the cable length is 1600 meters. However, according to the drawings, it seems that the cable length cannot be of that size. Therefore, we would like to confirm whether the cable length mentioned in the quantity table is correct or if there is a need for modifications.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work , However the contract will based on unite cost , Additionally, we have another inquiry regarding the Earthing system. According to the information provided in LOT 1 item NO. 9,one system consists of two earthing pits, including copper bars and all necessary components for installation, along with three busbars and earthing cables for all system equipment. Our query pertains to the number of systems required. Does "4 systems" mean that there is a need for four earthing pits, or does it imply something else? It should be noted that one system is sufficient for grounding all the system equipment. We need to verify the accuracy of the information mentioned in the table and clarify the requirements for the earthing system.Answer: Please refer to the RFQ BoQ and technical specifications , Scope of work.
Edited on:
13-Dec-2023 15:07
Edited by:
webservice@unops.org