Strengthening and Structural Repair of Front Porch of the Main building at Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka
UNOPS
Strengthening and Structural Repair of Front Porch of the Main building at Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka
Invitation to bid
Reference:
ITB/2021/36920
Beneficiary countries or territories:
Sri Lanka
Registration level:
Basic
Published on:
16-Dec-2021
Deadline on:
05-Jan-2022 14:30 (GMT 0.00)
Description
Tender description: Strengthening and Structural Repair of Front Porch of the Main building at Korea Sri Lanka Friendship Hospital at Godagama, Matara, Sri Lanka
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/Guides
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
Link | Description | |
---|---|---|
https://esourcing.unops.org/#/Help/Guides | UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema |
72101501
-
Handyman services
72101504
-
Disaster proofing or contingency services
72101505
-
Locksmith services
72101506
-
Elevator maintenance services
72101507
-
Building maintenance service
72101508
-
Floor cleaning services
72101509
-
Fire protection system and equipment maintenance or repair service
72101510
-
Plumbing system maintenance or repair
72101511
-
Air conditioning installation or maintenance or repair service
72101512
-
Hoist construction service
72101513
-
Offsite construction service
72101514
-
Refuse area construction service
72101515
-
Subsidence service work
72101516
-
Fire extinguisher inspection maintenance and repair service
72101517
-
Portable generator maintenance and or repair service
72101518
-
Portable generator rental service
72101519
-
Gas fitting installation service
72101520
-
Roof framing service
72101521
-
Building framing service
New clarification added: Q7.The BOQ Item C1 indicates the area of surface preperation for slab bottom and beam surfaces as 28 m2 and in the BOQ item C5, the area for Protective coating application indicates as 354 m2. If the protective coating to be applied on full beam and slab bottom surface, the area of surface preperation shall be eaqual. Please clarify.A7- Protective coat to be applied for all beams and slab soffits. Surface preperation is mainly considered only at beams. Specifications mentioned about a technical report which was not in the tender documents. please verify Q8 Specifications mentioned about a technical report which was not in the tender documents. please verifyA8- All the relavent details in the Technical report (Design report) has been shown in the Drawings and Specifications which are shared already in the tender.
Edited on:
05-Jan-2022 04:10
Edited by:
webservice@unops.org
New amendment added #2: Upload the revised BoQ and Specifications. The relevant Contract provisions indicated below are amended to read as follows;Bill of Quantity under Documents: Replace the file “ ITB_Minor_work _Construction_Contract_Section_IV_Bill Of Quantities_Revision 1“ with " ITB_Minor_work _Construction_Contract_Section_IV_Bill Of Quantities _Revision 2. ”Specifications under Documents: Replace the file “ ITB_Minor_work _Construction_Contract_Section_VI _Specification“ with " ITB_Minor_work _Construction_Contract_Section_VI_Specification _Revision 1. ”Dead line for clarifications extended to 2nd January 2022 ( 14.30 UTC) and Tender Submission Dead Line extended to 5th January 2022 , 14.30 UTC
Edited on:
02-Jan-2022 05:50
Edited by:
webservice@unops.org
New clarification added: Q5: Please clarify,Item C5, can we propose alternative proposal with Master protect 300, which isnt a polyurathene material but can match with your requirements at site? Answer: Please refer BOQ C5 item - "The product shall be of X-Roc EpoxyBond or equal quality"
Edited on:
31-Dec-2021 11:36
Edited by:
webservice@unops.org
New clarification added: · Q4: Please verify whether you provide space for contractor site office, stores and accommodations. Answer: Bare Land can be provided within the Hospital premises ( Max 500m away from the site location)
Edited on:
31-Dec-2021 11:36
Edited by:
webservice@unops.org
New clarification added: Q3;· Please clarify whether we need to allow separate access to the main entrance. - Answer: Not required.· Please verify scope in1st floor area, and requirement of sealing the dust access points in 1st floor. Answer: First floor windows are sound proof and no need any sealing for dusts. · Expansion joint repair detail – Please verify the method to seal the groove in both side with a sealant and filling the middle part with Rigi form or filler board. Answer: Reffer Drawing KSFH -A1-PORCH-ST-204. · B07 BOQ item mention T12 reinforcement will be measure separately but it is cannot be found in separate item. Please verify. Answer: Item dscription has been changed and added the T 12, Will be corrected in the revised BOQ · Assume all risk policy, third part insurance policy, workman compensation insurance only be required for item A3. Please confirm. Answer: All prices for the mentioned insurances has to be incoperated in BOQ item A3.· Assume contractor can store debris at site till cart away to distant location. Answer: yes for limited time period , But in a safe and demarcated area and site should be kept clean · Assume beam top (B1), slab soffit and beam surface (C1) would require 25mm thk concrete/plaster remove to expose sound concrete surface. Any additional depth which made up by rendering/plastering/waterproofing etc. will be an added scope to the contract. Answer: There is only waterproofing and protected rendering layer availabe on the beam top and to be removed.· Item B15, supply and apply 50 mm dia. PVC pipes cannot be measured in square meters. Please verify the measurement or supply detail drawing for the installation. Answer: Will be updated in amended revised BOQ · Please verify B12, B13 and B16 scope and quantities which cannot be clarify. As an experience contractor, we think it B 16 area need to be match with B 13 or B12 or both added. Further, for better protection, it need a sloping screed to be lay on the existing surface. Please verify. Answer: Item B 16 will be updated in the revised BOQ.
Edited on:
31-Dec-2021 11:35
Edited by:
webservice@unops.org
New clarification added: Q6: Spesifications menitoned about a carbon fiber reinforcement work but BOQ do not have any item to this scope. Please verify. Moreover, fiber reinforcement cannot be quote in this manner. We need technical details and it will take more than 3 weeks to obtain prices for the material as it need to be import to Sri Lanka. Answer: carbon fiber reinforcement work is not included in the scope and the section regarding carbon fiber reinforcement is shown in specification only as a reference and will be removed from the revised specification to avoid confusion.
Edited on:
31-Dec-2021 11:35
Edited by:
webservice@unops.org
New clarification added: Q1:Dear Sir/Madam,In the file "ITB_Minor_work _Construction_Contract_Section_V_ Drawings", the Drawing No KSFH-A1-PORCH-ST-208 shows the supporting arrangement around the Columns C4a and C4b area only. So we consider pricing only for that area and as per given quantities of the supporting Acro Jacks. There will be no any supporting arrangment for any of Beams or Slab portions apart from the area showed on the drawing and Acro Jack quantities provided. Please clarify and accept the proposal.A1:Drawing Drawing No KSFH-A1-PORCH-ST-208 gives only a special arrangement to support the structure around column 4a and 4b. However, it is the entire reponsibility of the contractor to assess the existing loading, site situation and provide the adequate supporting arrangment to the structure which will finally be subjected to the approval of the consultant/Engineer. Dear Sir/Madam,Q2:As per the Pre-Bid Meeting minutes, the bidder shall carry out the necessary excavation up to column base including demolition and removal of upstanding plinth at Ground level and the road (tar) surface and the related cost shall be included in the price of Item No: C6 of Bill of quantities. The Item No C6 in the revised BOQ stated as "Excavation to expose the Column footings at Substructure 1600 x 1600 x 2200 mm. Rate shall include for demolition and removing of plinth at ground level, removing of road surface arrounding column and the backfilling with available approved soil." According to the Item Description the backfilling shall be done by available approved soil. Does it mean the refilling with the excavated existing soil from the same area or are there any soil available at site (Provide by the Client free of charge) for refilling? The bidder is only carry out back filling of the location and shall not include any cost associated with civil construction and finishing items. Please clarify and confirm.A2:Soil available at the hospital premises aproximately 400m away if required which will be provided by the client free of charge for refilling. Works for plinth construction after back filling will be measured seperately.
Edited on:
30-Dec-2021 19:49
Edited by:
webservice@unops.org
New amendment added #1: Upload the revised BoQ and Pre-Bid Meeting Minutes. The relevant Contract provisions indicated below are amended to read as follows;Bill of Quantity under Documents: Replace the file “ ITB_Minor_work _Construction_Contract_Section_IV_Bill Of Quantities“ with " ITB_Minor_work _Construction_Contract_Section_IV_Bill Of Quantities _Revision 1. ”Upload the Pre-Bid Meeting Minutes